UNI EN 15015 : 2008
Current
The latest, up-to-date edition.
PLASTICS PIPING SYSTEMS - SYSTEMS FOR HOT AND COLD WATER NOT INTENDED FOR HUMAN CONSUMPTION - PERFORMANCE CHARACTERISTICS FOR PIPES, FITTINGS AND THEIR JOINTS
06-25-2008
PREMESSA
INTRODUZIONE
1 SCOPO E CAMPO DI APPLICAZIONE
2 RIFERIMENTI NORMATIVI
3 TERMINI, DEFINIZIONI E SIMBOLI
4 REQUISITI PRESTAZIONALI
5 METODI DI PROVA
6 VALUTAZIONE DELLA CONFORMITA
APPENDICE A (normativa) - COEFFICIENTI COMPLESSIVI DI SERVIZIO
(PROGETTO)
APPENDICE B (normativa) - NORME DI PRODOTTO PER INSTALLAZIONI
DI ACQUA CALDA E FREDDA ALL'INTERNO DI EDIFICI
APPENDICE C (normativa) - NORME PER LA VALUTAZIONE DI
CONFORMITA PER INSTALLAZIONI DI ACQUA CALDA E FREDDA
ALL'INTERNO DI EDIFICI
APPENDICE ZA (informativa) - PUNTI DELLA PRESENTE NORMA
EUROPEA RIGUARDANTI LE DISPOSIZIONI DELLA DIRETTIVA
UE RELATIVA AI PRODOTTI DA COSTRUZIONE (CPD)
BIBLIOGRAFIA
Describes performance requirements for plastics pipes, fittings and their joints intended for hot and cold water installations for the conveyance of water and for heating systems with the exception of drinking water distribution for human consumption, and gives associated test methods for verification and evaluation of conformity.
DocumentType |
Standard
|
PublisherName |
Ente Nazionale Italiano di Unificazione (UNI)
|
Status |
Current
|
Standards | Relationship |
EN 15015:2007 | Identical |
EN 15012:2007 | Plastics piping systems - Soil and waste discharge systems within the building structure - Performance characteristics for pipes, fittings and their joints |
EN ISO 3126:2005 | Plastics piping systems - Plastics components - Determination of dimensions (ISO 3126:2005) |
EN 12293:1999 | Plastics piping systems - Thermoplastics pipes and fittings for hot and cold water - Test method for the resistance of mounted assemblies to temperature cycling |
ISO 3213:2009 | Polypropylene (PP) pipes Effect of time and temperature on the expected strength |
EN ISO 15875-3:2003 | Plastics piping systems for hot and cold water installations - Crosslinked polyethylene (PE-X) - Part 3: Fittings (ISO 15875-3:2003) |
ISO/TS 15875-7:2003 | Plastics piping systems for hot and cold water installations Crosslinked polyethylene (PE-X) Part 7: Guidance for the assessment of conformity |
ISO 15874-3:2013 | Plastics piping systems for hot and cold water installations — Polypropylene (PP) — Part 3: Fittings |
EN ISO 15874-5:2013 | Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 5: Fitness for purpose of the system (ISO 15874-5:2013) |
ISO 15877-3:2009 | Plastics piping systems for hot and cold water installations — Chlorinated poly(vinyl chloride) (PVC-C) — Part 3: Fittings |
ISO 1167-2:2006 | Thermoplastics pipes, fittings and assemblies for the conveyance of fluids — Determination of the resistance to internal pressure — Part 2: Preparation of pipe test pieces |
ISO 10146:1997 | Crosslinked polyethylene (PE-X) pipes Effect of time and temperature on the expected strength |
EN ISO 15876-2:2017 | Plastics piping systems for hot and cold water installations - Polybutene (PB) - Part 2: Pipes (ISO 15876-2:2017) |
BS 7291-2:2006 | Thermoplastics pipes and associated fittings for hot and cold water for domestic purposes and heating installations in buildings Specification for polybutylene (PB) pipes and associated fittings |
EN ISO 1167-2:2006 | Thermoplastics pipes, fittings and assemblies for the conveyance of fluids - Determination of the resistance to internal pressure - Part 2: Preparation of pipe test pieces (ISO 1167-2:2006) |
ISO 15875-5:2003 | Plastics piping systems for hot and cold water installations — Crosslinked polyethylene (PE-X) — Part 5: Fitness for purpose of the system |
EN ISO 1167-1:2006 | Thermoplastics pipes, fittings and assemblies for the conveyance of fluids - Determination of the resistance to internal pressure - Part 1: General method (ISO 1167-1:2006) |
ISO 15874-1:2013 | Plastics piping systems for hot and cold water installations — Polypropylene (PP) — Part 1: General |
ISO 9080:2012 | Plastics piping and ducting systems — Determination of the long-term hydrostatic strength of thermoplastics materials in pipe form by extrapolation |
ISO 17456:2006 | Plastics piping systems Multilayer pipes Determination of long-term strength |
ISO 15877-2:2009 | Plastics piping systems for hot and cold water installations — Chlorinated poly(vinyl chloride) (PVC-C) — Part 2: Pipes |
ISO 22391-5:2009 | Plastics piping systems for hot and cold water installations — Polyethylene of raised temperature resistance (PE-RT) — Part 5: Fitness for purpose of the system |
ISO 15875-2:2003 | Plastics piping systems for hot and cold water installations — Crosslinked polyethylene (PE-X) — Part 2: Pipes |
EN ISO 15876-5:2017 | Plastics piping systems for hot and cold water installations - Polybutene (PB) - Part 5: Fitness for purpose of the system (ISO 15876-5:2017) |
ISO 12230:2012 | Polybutene-1 (PB-1) pipes — Effect of time and temperature on the expected strength |
EN ISO 9080:2012 | Plastics piping and ducting systems - Determination of the long-term hydrostatic strength of thermoplastics materials in pipe form by extrapolation (ISO 9080:2012) |
ISO/TS 15876-7:2003 | Plastics piping systems for hot and cold water installations Polybutylene (PB) Part 7: Guidance for the assessment of conformity |
CEN/TR 15438:2007 | Plastics piping systems - Guidance for coding of products and their intended uses |
ISO 15877-1:2009 | Plastics piping systems for hot and cold water installations — Chlorinated poly(vinyl chloride) (PVC-C) — Part 1: General |
ISO 15874-2:2013 | Plastics piping systems for hot and cold water installations — Polypropylene (PP) — Part 2: Pipes |
ISO 15876-1:2017 | Plastics piping systems for hot and cold water installations — Polybutene (PB) — Part 1: General |
ISO 3126:2005 | Plastics piping systems Plastics components Determination of dimensions |
ISO 15876-3:2017 | Plastics piping systems for hot and cold water installations — Polybutene (PB) — Part 3: Fittings |
ISO 15877-5:2009 | Plastics piping systems for hot and cold water installations — Chlorinated poly(vinyl chloride) (PVC-C) — Part 5: Fitness for purpose of the system |
ISO 22391-2:2009 | Plastics piping systems for hot and cold water installations — Polyethylene of raised temperature resistance (PE-RT) — Part 2: Pipes |
EN ISO 15876-1:2017 | Plastics piping systems for hot and cold water installations - Polybutene (PB) - Part 1: General (ISO 15876-1:2017) |
EN ISO/TS 15877-7 : 2003 | PLASTICS PIPING SYSTEMS FOR HOT AND COLD WATER INSTALLATIONS - CHLORINATED POLY(VINYL CHLORIDE) (PVC-C) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
EN ISO 13760:1998 | Plastics pipes for the conveyance of fluids under pressure - Miner's rule - Calculation method for cumulative damage (ISO 13760:1998) |
EN ISO 15875-5:2003 | Plastics piping systems for hot and cold water installations - Crosslinked polyethylene (PE-X) - Part 5: Fitness for purpose of the system (ISO 15875-5:2003) |
EN ISO 9001:2015 | Quality management systems - Requirements (ISO 9001:2015) |
ISO/TS 15877-7:2009 | Plastics piping systems for hot and cold water installations Chlorinated poly(vinyl chloride) (PVC-C) Part 7: Guidance for the assessment of conformity |
EN ISO/TS 15876-7 : 2003 | PLASTICS PIPING SYSTEMS FOR HOT AND COLD WATER INSTALLATIONS - POLYBUTYLENE (PB) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
EN ISO 15876-3:2017 | Plastics piping systems for hot and cold water installations - Polybutene (PB) - Part 3: Fittings (ISO 15876-3:2017) |
ISO 24033:2009 | Polyethylene of raised temperature resistance (PE-RT) pipes — Effect of time and temperature on the expected strength |
ISO 10508:2006 | Plastics piping systems for hot and cold water installations — Guidance for classification and design |
ISO 15876-2:2017 | Plastics piping systems for hot and cold water installations — Polybutene (PB) — Part 2: Pipes |
ISO 9001:2015 | Quality management systems — Requirements |
ISO 15875-1:2003 | Plastics piping systems for hot and cold water installations — Crosslinked polyethylene (PE-X) — Part 1: General |
ISO 22391-3:2009 | Plastics piping systems for hot and cold water installations — Polyethylene of raised temperature resistance (PE-RT) — Part 3: Fittings |
ISO 15875-3:2003 | Plastics piping systems for hot and cold water installations — Crosslinked polyethylene (PE-X) — Part 3: Fittings |
EN ISO/TS 15874-7 : 2003 | PLASTICS PIPING SYSTEMS FOR HOT AND COLD WATER INSTALLATIONS - POLYPROPYLENE (PP) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
ISO 13760:1998 | Plastics pipes for the conveyance of fluids under pressure — Miner's rule — Calculation method for cumulative damage |
ISO 22391-1:2009 | Plastics piping systems for hot and cold water installations — Polyethylene of raised temperature resistance (PE-RT) — Part 1: General |
EN ISO 15874-2:2013 | Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 2: Pipes (ISO 15874-2:2013) |
ISO 15874-5:2013 | Plastics piping systems for hot and cold water installations — Polypropylene (PP) — Part 5: Fitness for purpose of the system |
ISO/TS 15874-7:2003 | Plastics piping systems for hot and cold water installations Polypropylene (PP) Part 7: Guidance for the assessment of conformity |
ISO 15876-5:2017 | Plastics piping systems for hot and cold water installations — Polybutene (PB) — Part 5: Fitness for purpose of the system |
EN ISO 15874-3:2013 | Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 3: Fittings (ISO 15874-3:2013) |
ISO 1167-1:2006 | Thermoplastics pipes, fittings and assemblies for the conveyance of fluids Determination of the resistance to internal pressure Part 1: General method |
EN ISO 15874-1:2013 | Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 1: General (ISO 15874-1:2013) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.