UIC 711 : 1ED 1981
Current
Current
The latest, up-to-date edition.
GEOMETRY OF POINTS AND CROSSINGS WITH UIC RAILS PERMITTING SPEEDS OF 100 KM/H OR MORE ON THE DIVERGING TRACK
Published date
01-12-2013
Publisher
Sorry this product is not available in your region.
| DocumentType |
Standard
|
| PublisherName |
Union Internationale des Chemins de Fer
|
| Status |
Current
|
| 03/310084 DC : DRAFT JUNE 2003 | BS EN 13232-9 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 9: LAYOUTS |
| I.S. EN 13232-9:2006 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 9: LAYOUTS |
| DIN EN 13232-9:2012-01 | Railway applications - Track - Switches and crossings - Part 9: Layouts (includes Amendment A1:2011) |
| DIN EN 13232-9:2014-07 (Draft) | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 9: LAYOUTS |
| BS EN 13232-9 : 2006 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 9: LAYOUTS |
| EN 13232-9:2006+A1:2011 | Railway applications - Track - Switches and crossings - Part 9: Layouts |
| UNE-EN 13232-9:2007 | Railway applications - Track - Switches and crossings - Part 9: Layouts |
Summarise
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.
Sorry this product is not available in your region.