SN EN 60953-1 : 1995
Current
The latest, up-to-date edition.
RULES FOR STEAM TURBINE THERMAL ACCEPTANCE TESTS - PART 1: METHOD A - HIGH ACCURACY FOR LARGE CONDENSING STEAM TURBINES
01-12-2013
Foreword
Introduction
1 Scope and object
1.1 Scope
1.2 Object
1.3 Matters to be considered in the contract
2 Units, symbols, terms and definitions
2.1 General
2.2 Symbols, units
2.3 Subscripts, superscripts and definitions
2.4 Definition of guarantee values and test results
3 Guiding principles
3.1 Advance planning for test
3.2 Preparatory agreements and arrangements for tests
3.3 Planning of the tests
3.4 Preparation of the tests
3.5 Comparison measurements
3.6 Settings for tests
3.7 Preliminary tests
3.8 Acceptance tests
3.9 Repetition of acceptance tests
4 Measuring techniques and measuring instruments
4.1 General
4.2 Measurement of power
4.3 Flow measurement
4.4 Pressure measurement (excluding condensing turbine
exhaust pressure)
4.5 Condensing turbine exhaust pressure measurement
4.6 Temperature measurement
4.7 Steam quality measurement
4.8 Time measurement
4.9 Speed measurement
5 Evaluation of tests
5.1 Preparation of evaluation
5.2 Computation of results
6 Correction of test results and comparison with
guarantee
6.1 Guarantee values and guarantee conditions
6.2 Correction of initial steam flow capacity
6.3 Correction of maximum output
6.4 Correction of thermal and thermodynamic efficiency
6.5 Definition and application of correction values
6.6 Correction methods
6.7 Variables to be considered in the correction
6.8 Guarantee comparison
Appendices
A (informative) Feedwater heater leakage and
condenser leakage tests
B (normative) Throat tap nozzle
C (normative) The use of flow straighteners in fluid
flow measurements
ZA (normative) Normative references to international
publications with their corresponding European
publications
Gives rules that apply primarily to thermal acceptance tests with high accuracy for condensing steam turbines driving generators for electric power services. Describes thermal acceptance tests that will verify any guarantees given by the manufacturer of the plant concerning: turbine thermodynamic efficiency or steam rate or power output at specified steam flow conditions; turbine plant thermal efficiency or heat rate; main steam flow capacity and/or maximum power output.
DocumentType |
Standard
|
PublisherName |
Swiss Standards
|
Status |
Current
|
Standards | Relationship |
IEC 60953-1:1990 | Identical |
I.S. EN 60953-1:1998 | Identical |
EN 60953-1:1995 | Identical |
BS EN 60953-1:1996 | Identical |
NF EN 60953-1 : 2002 | Identical |
NBN EN 60953-1 : 1996 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.