• Shopping Cart
    There are no items in your cart

SN EN 45510-4-2 : 1999

Current

Current

The latest, up-to-date edition.

GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 4: BOILER AUXILIARIES - SECTION 2: GAS-AIR, STEAM-AIR AND GAS-GAS HEATERS

Published date

01-12-2013

Sorry this product is not available in your region.

Foreword
1 Scope
2 Normative references
3 Definitions
    3.1 Organizational terms
    3.2 Technical terms
    3.3 General terms
4 Brief overall project description
    4.1 Role and organization of purchaser
    4.2 Site location
    4.3 Equipment task
    4.4 Equipment to be purchased
    4.5 Control and instrumentation
    4.6 Electrical supplies and other services
    4.7 Other interfaces
    4.8 Project programme
    4.9 Equipment identification systems
5 Extent of supply
6 Terminal points
7 Operational requirements
    7.1 Operating environment
    7.2 Manning levels
    7.3 Normal operation
    7.4 Operating hours
    7.5 Start-up and shut-down
    7.6 Abnormal conditions
    7.7 Further operational requirements
8 Life expectancy
    8.1 Design life
    8.2 Components requiring periodic maintenance
9 Performance requirements
    9.1 Duty
    9.2 Performance
    9.3 Equipment margins
    9.4 Availability
    9.5 Levels of component redundancy
    9.6 Further performance requirements
10 Design and fabrication
   10.1 Specific equipment features
   10.2 Material selection
   10.3 Safety
   10.4 Interchangeability
   10.5 Fabrication methods
11 Maintenance requirements
   11.1 Planned maintenance
   11.2 Personnel safety
   11.3 Requirements for access
   11.4 Lifting requirements
   11.5 Special tools
   11.6 Test equipment
   11.7 Spare parts strategy
   11.8 Special precautions
12 Technical documentation requirements
   12.1 Tender documentation
   12.2 Contract documentation
13 Applicable legislation, regulations, standards and further
    requirements
   13.1 Legislation and regulations
   13.2 Standards
   13.3 Further requirements
14 Evaluation criteria
   14.1 General
   14.2 Technical criteria
15 Quality measures
   15.1 General
   15.2 Approvals procedure
   15.3 Inspection requirements
   15.4 Non-conformity
16 Site factors
   16.1 Access
   16.2 Facilities
   16.3 Site specific requirements
17 Verification of specified performance
   17.1 General
   17.2 Works tests
   17.3 Test during installation and commissioning
   17.4 Technical conditions for trial run
   17.5 Functional and performance tests
Annex A (informative) Bibliography

Provides guidance on writing technical specification for procurement of air heating equipment associated with steam generating plant and gas reheating equipment associated with flue gas treatment plant used in power stations. Systems for direct contact heating of air/flue gas by hot gases is not covered.

DocumentType
Standard
PublisherName
Swiss Standards
Status
Current

Standards Relationship
EN 45510-4-2 : 1999 Identical
DIN EN 45510-4-2:1999-06 Identical
BS EN 45510-4-2:1999 Identical
UNE-EN 45510-4-2:2000 Identical
I.S. EN 45510-4-2:1999 Identical
EN 45510-4-2:1999 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.