SN EN 13146-5:2012
Current
The latest, up-to-date edition.
RAILWAY APPLICATIONS - TRACK - TEST METHODS FOR FASTENING SYSTEMS - PART 5: DETERMINATION OF ELECTRICAL RESISTANCE
Hardcopy
07-01-2012
Foreword
1 Scope
2 Normative references
3 Terms and definitions, symbols and abbreviations
3.1 Terms and definitions
3.2 Symbols and abbreviations
4 Principle
5 Apparatus
5.1 Rail
5.2 Water
5.3 Spray equipment
5.4 Electricity supply
5.5 instruments
6 Test specimens
7 Procedure
8 Calculations
9 Test report
Annex A (informative) Resistance/time plot
Gives a laboratory test procedure for determining the electrical resistance, in wet conditions, between the running rails by a fastening system fitted to a steel or concrete sleeper, bearer or element of slab track.
Committee |
INB/NK 173
|
DocumentType |
Test Method
|
Pages |
0
|
PublisherName |
Swiss Standards
|
Status |
Current
|
Standards | Relationship |
BS EN 13146-5:2012 | Identical |
NEN EN 13146-5 : 2012 | Identical |
UNI EN 13146-5 : 2012 | Identical |
UNE-EN 13146-5:2017 | Identical |
NS EN 13146-5 : 2012 AC 2017 | Identical |
I.S. EN 13146-5:2012 | Identical |
NF EN 13146-5 : 2012 | Identical |
DIN EN 13146-5:2012-06 | Identical |
NBN EN 13146-5 : 2012 | Identical |
EN 13146-5:2012 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.