PREN 2349-304 : 200P1
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
View Superseded by
AEROSPACE SERIES - REQUIREMENTS AND TEST PROCEDURES FOR RELAYS AND CONTACTORS - PART 304: OPERATE AND RELEASE TIME
Hardcopy , PDF
12-05-2023
English
1 Scope
2 Normative references
3 Operating time
4 Release time
Specifies a method for testing the operating (actuating) and releasing time of relays and contactors.
Committee |
C2
|
DevelopmentNote |
To be used together with EN 2349-100. (07/2003)
|
DocumentType |
Draft
|
Pages |
4
|
ProductNote |
Superseded by EN 2349-304:2006
|
PublisherName |
Aerospace & Defence Industries Association of Europe
|
Status |
Withdrawn
|
SupersededBy |
Standards | Relationship |
DIN EN 2349-304:2007-05 | Identical |
PREN 2349-414 : 200P1 | AEROSPACE SERIES - REQUIREMENTS AND TEST PROCEDURES FOR RELAYS AND CONTACTORS - PART 414: MECHANICAL SHOCK |
PREN 2349-415 : 200P1 | AEROSPACE SERIES - REQUIREMENTS AND TEST PROCEDURES FOR RELAYS AND CONTACTORS - PART 415: ACCELERATION |
PREN 2349-411 : 200P1 | AEROSPACE SERIES - REQUIREMENTS AND TEST PROCEDURES FOR RELAYS AND CONTACTORS - PART 411: TEMPERATURE CHANGE |
PREN 2349-413 : 200P1 | AEROSPACE SERIES - REQUIREMENTS AND TEST PROCEDURES FOR RELAYS AND CONTACTORS - PART 413: VIBRATION, SINUSOIDAL AND RANDOM |
ISO 2678:1985 | Environmental tests for aircraft equipment — Insulation resistance and high voltage tests for electrical equipment |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.