PREN 13232-9 : DRAFT 2014
Current
The latest, up-to-date edition.
RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 9: LAYOUTS
06-16-2014
Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Acceptance (General Design Process
Step 4 - See prEN 13232-2:2014)
Annex A (informative) - Layout acceptance form
Specifies the geometrical and non-geometrical acceptance criteria for inspection of layouts assembled both in the fabrication plant and at track site in case of layouts that are delivered non or partially assembled or in a 'kit' form.
Committee |
TC 256
|
DocumentType |
Draft
|
PublisherName |
Comite Europeen de Normalisation
|
Status |
Current
|
Standards | Relationship |
14/30294813 DC : 0 | Identical |
14/30294813 DC : DRAFT JUNE 2014 | Identical |
03/310084 DC : DRAFT JUNE 2003 | Identical |
04/30113588 DC : DRAFT MAY 2004 | EN 13803-2 - RAILWAY APPLICATIONS - TRACK ALIGNMENT DESIGN PARAMETERS - TRACK GAUGES 1435 MM AND WIDER - PART 2: SWITCHES AND CROSSINGS AND COMPARABLE ALIGNMENT DESIGN SITUATIONS WITH ABRUPT CHANGES OF CURVATURE |
PREN 13232-2 : DRAFT 2014 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN |
05/19988443 DC : DRAFT APR 2005 | BS EN 13232-8 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 8: EXPANSION DEVICES |
14/30294492 DC : 0 | BS EN 13232-2 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN |
EN 13232-7:2006+A1:2011 | Railway applications - Track - Switches and crossings - Part 7: Crossings with moveable parts |
EN 13232-2:2003+A1:2011 | Railway applications - Track - Switches and crossings - Part 2: Requirements for geometric design |
EN 13232-4:2005+A1:2011 | Railway applications - Track - Switches and crossings - Part 4: Actuation, locking and detection |
05/30137978 DC : 0 | EN 15273-1 - RAILWAY APPLICATIONS - GAUGES - PART 1: GENERALITIES - COMMON RULES FOR INFRASTRUCTURE AND ROLLING STOCK |
14/30294495 DC : 0 | BS EN 13232-4 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 4: ACTUATION, LOCKING AND DETECTION |
DIN EN 13232-2:2014-07 (Draft) | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN |
I.S. EN 13232-2:2003 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN |
I.S. EN 13232-4:2005 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 4: ACTUATION, LOCKING AND DETECTION |
I.S. EN 13232-7:2006 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
DIN EN 13232-7:2012-01 | Railway applications - Track - Switches and crossings - Part 7: Crossings with moveable parts (includes Amendment A1:2011) |
DIN EN 13232-4:2012-01 | Railway applications - Track - Switches and crossings - Part 4: Actuation, locking and detection (includes Amendment A1:2011) |
DIN EN 13232-2:2012-01 | Railway applications - Track - Switches and crossings - Part 2: Requirements for geometric design (includes Amendment A1:2011) |
PREN 13232-7 : DRAFT 2014 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
BS EN 13232-2 : 2003 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN |
UNI EN 13232-4 : 2012 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 4: ACTUATION, LOCKING AND DETECTION |
UNI EN 13232-2 : 2012 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN |
UNI EN 13232-7 : 2012 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
PREN 13232-4 : DRAFT 2014 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 4: ACTUATION, LOCKING AND DETECTION |
PREN 13232-8 : DRAFT 2014 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 8: EXPANSION DEVICES |
14/30294504 DC : 0 | BS EN 13232-7 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
DIN EN 13232-7:2014-07 (Draft) | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
BS EN 13232-7 : 2006 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
DIN EN 13232-4:2014-07 (Draft) | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 4: ACTUATION, LOCKING AND DETECTION |
05/30137984 DC : 0 | EN 15273-3 - RAILWAY APPLICATIONS - GAUGES - PART 3: STRUCTURE GAUGES |
14/30294501 DC : 0 | BS EN 13232-8 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 8: EXPANSION DEVICES |
BS EN 13232-4 : 2005 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 4: ACTUATION, LOCKING AND DETECTION |
UNE-EN 13232-2:2005 | Railway applications - Track - Switches and crossings - Part 2: Requirements for geometric design |
UNE-EN 13232-7:2007 | Railway applications - Track - Switches and crossings - Part 7: Crossings with moveable parts |
UNE-EN 13232-4:2007 | Railway application. Track. Switches and crossings. Part 4: Actuation, locking and detection |
PREN 13232-2 : DRAFT 2014 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 2: REQUIREMENTS FOR GEOMETRIC DESIGN |
PREN 13232-3 : DRAFT 2014 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 3: REQUIREMENTS FOR WHEEL/RAIL INTERACTION |
PREN 13232-1 : DRAFT 2013 | RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 1: DEFINITIONS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.