PD IEC TR 61850-90-3:2016
Current
The latest, up-to-date edition.
Communication networks and systems for power utility automation Using IEC 61850 for condition monitoring diagnosis and analysis
Hardcopy , PDF
English
11-24-2020
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions, abbreviations,
acronyms and conventions
4 Use cases
5 GIS (Gas Insulated Switchgear)
6 Power transformer
7 Load tap changer (LTC)
8 Underground cable (UGC)
9 Transmission line (TL)
10 Auxiliary power system
11 Communication Requirements
12 Asset Management
13 Logical node classes
14 Data object name semantics and enumerations
15 SCL enumerations (from DOEnums_90_3)
Annex A (informative) - Usage of 'T' logical node
and 'S' logical node in CMD application
Bibliography
Pertains to address the topic from an application specific viewpoint across all affected parts of IEC 61850.
Committee |
PEL/57
|
DocumentType |
Standard
|
Pages |
214
|
PublisherName |
British Standards Institution
|
Status |
Current
|
Standards | Relationship |
IEC TR 61850-90-3:2016 | Identical |
IEC 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEC 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61400-25-6:2016 | Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring |
IEC 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
IEC 62271-203:2011 | High-voltage switchgear and controlgear - Part 203: Gas-insulated metal-enclosed switchgear for rated voltages above 52 kV |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC TS 61850-2:2003 | Communication networks and systems in substations - Part 2: Glossary |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.