FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions, abbreviations, acronyms and symbols
4 Wide Area Communication in electrical utilities
5 WAN overall requirements and data transmission metrics
6 Applications analysis
7 Wide-area and real-time network technologies
8 Use cases
Bibliography
Pertains to for an audience familiar with electrical power automation based on IEC 61850 and particularly for data network engineers and system integrators.
Committee |
PEL/57
|
DocumentType |
Standard
|
Pages |
222
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy |
This Technical Report is intended for an audience familiar with electrical power automation based on IEC 61850 and particularly for data network engineers and system integrators. It is intended to help them to understand the technologies, configure a wide area network, define requirements, write specifications, select components and conduct tests.
This Technical Report provides definitions, guidelines, and recommendations for the engineering of WANs, in particular for protection, control and monitoring based on IEC 61850 and related standards.
This Technical Report addresses substation-to-substation communication, substation-to-control centre and control centre-to-control centre communication. In particular, this Technical Report addresses the most critical aspects of IEC 61850 such as protection related data transmission via GOOSE and SMVs, and the multicast transfer of large volumes of synchrophasor data.
The Technical Report addresses issues such as topology, redundancy, traffic latency and quality of service, traffic management, clock synchronization, security and maintenance of the network.
This Technical Report contains use cases that show how utilities tackle their WAN engineering.
Standards | Relationship |
IEC TR 61850-90-12:2015 | Identical |
IEC 62351-11:2016 | Power systems management and associated information exchange - Data and communications security - Part 11: Security for XML documents |
IEC 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
IEC TS 62443-1-1:2009 | Industrial communication networks - Network and system security - Part 1-1: Terminology, concepts and models |
IEEE 802.1X-2010 | IEEE Standard for Local and metropolitan area networks--Port-Based Network Access Control |
IEC TR 62443-3-1:2009 | Industrial communication networks - Network and system security - Part 3-1: Security technologies for industrial automation and control systems |
IEC TS 62351-6:2007 | Power systems management and associated information exchange - Data and communications security - Part 6: Security for IEC 61850 |
IEC 62439-3:2016 | Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR) |
IEC TR 62351-10:2012 | Power systems management and associated information exchange - Data and communications security - Part 10: Security architecture guidelines |
IEC TS 62351-4:2007 | Power systems management and associated information exchange - Data and communications security - Part 4: Profiles including MMS |
IEEE 802.3-2012 | IEEE Standard for Ethernet |
IEC 60870-5-104:2006+AMD1:2016 CSV | Telecontrol equipment and systems - Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standardtransport profiles |
ATIS T1.403 : 99 SUPP B 2002 | NETWORK AND CUSTOMER INSTALLATION INTERFACES - DS1 - ELECTRICAL INTERFACE |
IEC 62443-2-1:2010 | Industrial communication networks - Network and system security - Part 2-1: Establishing an industrial automation and control system security program |
IEC TS 62351-2:2008 | Power systems management and associated information exchange - Data and communications security - Part 2: Glossary of terms |
IEEE 802.1Q-2014 | IEEE Standard for Local and metropolitan area networks--Bridges and Bridged Networks |
IEC TR 61850-90-2:2016 | Communication networks and systems for power utility automation - Part 90-2: Using IEC 61850 for communication between substations and control centres |
IEEE 802.1AH : 2008 | LOCAL AND METROPOLITAN AREA NETWORKS - VIRTUAL BRIDGED LOCAL AREA NETWORKS - AMENDMENT 7: PROVIDER BACKBONE BRIDGES |
IEC 60834-2:1993 | Performance and testing of teleprotection equipment of power systems - Part 2: Analogue comparison systems |
IEEE 802.1AG : 2007 | LOCAL AND METROPOLITAN AREA NETWORKS - VIRTUAL BRIDGED LOCAL AREA NETWORKS - AMENDMENT 5: CONNECTIVITY FAULT MANAGEMENT |
IEC 61869-9:2016 | Instrument transformers - Part 9: Digital interface for instrument transformers |
IEC TR 61850-90-1:2010 | Communication networks and systems for power utility automation - Part 90-1: Use of IEC 61850 for the communication between substations |
IEC TS 62351-5:2013 | Power systems management and associated information exchange - Data and communications security - Part 5: Security for IEC 60870-5 and derivatives |
IEEE 487.3-2014 | IEEE Standard for the Electrical Protection of Communication Facilities Serving Electric Supply Locations Through the Use of Hybrid Facilities |
IEC TR 61850-90-5:2012 | Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 |
IEC 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
IEC TS 62351-7:2010 | Power systems management and associated information exchange - Data and communications security - Part 7: Network and system management (NSM) data object models |
IEC 61588:2009 | Precision clock synchronization protocol for networked measurement and control systems |
IEC 62488-1:2012 | Power line communication systems for power utility applications - Part 1: Planning of analogue and digital power line carrier systems operating over EHV/HV/MV electricity grids |
IEC TS 62351-1:2007 | Power systems management and associated information exchange - Data and communications security - Part 1: Communication network and system security - Introduction to security issues |
IEC TR 62357-200:2015 | Power systems management and associated information exchange - Part 200: Guidelines for migration from Internet Protocol version 4 (IPv4) to Internet Protocol version 6 (IPv6) |
IEC 62439-1:2010+AMD1:2012+AMD2:2016 CSV | Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods |
IEC 60050-371:1984 | International Electrotechnical Vocabulary (IEV) - Part 371: Telecontrol |
IEC TS 62351-8:2011 | Power systems management and associated information exchange - Data and communications security - Part 8: Role-based access control |
IEEE 802.1QAY : 2009 | LOCAL AND METROPOLITAN AREA NETWORKS - VIRTUAL BRIDGED LOCAL AREA NETWORKS - AMENDMENT 10: PROVIDER BACKBONE BRIDGE TRAFFIC ENGINEERING |
IEC 60834-1:1999 | Teleprotection equipment of power systems - Performance and testing - Part 1: Command systems |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.