• There are no items in your cart

NS EN 14160 : 1ED 2002

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

SPACE ENGINEERING - SOFTWARE

Superseded date

11-01-2014

Published date

01-12-2013

Sorry this product is not available in your region.

Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
   3.1 Terms and definitions
   3.2 Abbreviated terms
4 Space system software engineering
   4.1 Introduction
   4.2 Organisation of this standard
   4.3 Space system software engineering processes
       4.3.1 General
       4.3.2 Software requirements engineering process
       4.3.3 Software design engineering process
       4.3.4 Software verification and validation
              (qualification) process
       4.3.5 Software operations engineering process
       4.3.6 Software maintenance process
   4.4 Relation to space project management and space product
       assurance standards
       4.4.1 General
       4.4.2 Software product assurance
       4.4.3 Software project management
   4.5 Verification engineering
 5 General requirements
   5.1 Introduction
   5.2 System engineering processes related to software
       5.2.1 Introduction
       5.2.2 System requirements analysis
       5.2.3 System partitioning
       5.2.4 System level requirements for software verification
             and validation
       5.2.5 System level integration of software
       5.2.6 Software operations
   5.3 Software management
       5.3.1 Introduction
       5.3.2 Software life cycle
       5.3.3 Interface management
       5.3.4 Technical budget and margin management
   5.4 Software requirements engineering process
       5.4.1 Introduction
       5.4.2 Software requirements analysis
       5.4.3 Software top-level architectural design
       5.4.4 Software verification and validation
   5.5 Software design engineering process
       5.5.1 Introduction
       5.5.2 Design of software items
       5.5.3 Coding and testing
       5.5.4 Integration
   5.6 Software verification and validation (qualification)
       process
       5.6.1 Introduction
       5.6.2 Milestones
       5.6.3 Verification and validation processes
       5.6.4 Verification process implementation
       5.6.5 Validation process implementation
       5.6.6 Verification process
       5.6.7 Validation process
       5.6.8 Joint technical review process
   5.7 Software operations engineering process
       5.7.1 Introduction
       5.7.2 Operation process
       5.7.3 Process implementation
       5.7.4 Operational testing
       5.7.5 System operation
       5.7.6 User support
   5.8 Software maintenance process
       5.8.1 Introduction
       5.8.2 Process implementation
       5.8.3 Problem and modification analysis
       5.8.4 Modification implementation
       5.8.5 Maintenance review and acceptance
       5.8.6 Software migration
       5.8.7 Software retirement
 6 Special requirements
   6.1 Introduction
   6.2 Space segment software
       6.2.1 General
       6.2.2 Critical functions
       6.2.3 System interfaces
       6.2.4 Inflight software modifications
   6.3 Ground segment software
   6.4 Software re-use
       6.4.1 General
       6.4.2 Developing software for intended re-use
       6.4.3 Re-using software from other projects
   6.5 Man-machine interfaces
   6.6 Critical software
Annex A (normative) Software documentation
        A.1 Introduction
        A.2 The requirements baseline (RB)
            A.2.1 General
            A.2.2 Requirements baseline contents at SRR
            A.2.3 Interface requirements document (IRD)
        A.3 Technical specification (TS)
            A.3.1 General
            A.3.2 Interface control document (ICD)
            A.3.3 Software maintenance plan
            A.3.4 Operations manual
        A.4 Design justification file (DJF)
        A.5 Design definition file (DDF)
        A.6 System level documentation
            A.6.1 Introduction
            A.6.2 Operations, maintenance, migration and
                  retirement documentation
Annex B (informative) Requirement cross references
Annex C (informative) References to other space standards
Bibliography

Defines the space software engineering process and its interfaces with the space project management standards and space product assurance standards and explains how they apply in the software engineering process. Does not cover software developments out of scope with the system of space standards.

DocumentType
Standard
PublisherName
Norwegian Standards (Norges Standardiseringsforbund)
Status
Superseded

Standards Relationship
UNE-EN 14160:2002 Identical
I.S. EN 14160:2002 Identical
DIN EN 14160:2002-10 Identical
BS EN 14160:2002 Identical
EN 14160:2001 Identical
UNI EN 14160 : 2002 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.