NEN EN 50518-1 : 2013
Current
Current
The latest, up-to-date edition.
MONITORING AND ALARM RECEIVING CENTRE - PART 1: LOCATION AND CONSTRUCTION REQUIREMENTS
Published date
01-12-2013
Publisher
Sorry this product is not available in your region.
Defines the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process.
DocumentType |
Standard
|
PublisherName |
Netherlands Standards
|
Status |
Current
|
Standards | Relationship |
EN 50518-1:2013 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.