• Shopping Cart
    There are no items in your cart

MIL-STD-1520 Revision C:1986

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

CORRECTIVE ACTION AND DISPOSITION SYSTEM FOR NONCONFORMING MATERIAL

Available format(s)

PDF

Withdrawn date

02-27-1995

US$20.00
Excluding Tax where applicable

1 Scope
1.1 Purpose
1.2 Application
1.3 Change notice and revisions
2 Referenced documents (not applicable)
3 Definitions
3.1 Control charts
3.2 Control limits
3.3 Corrective action
3.4 Corrective Action Board (CAB)
3.5 Material Review Board (MRB)
3.6 Nonconformance
3.6.1 Minor nonconformance
3.6.2 Major/critical nonconformance
3.7 Nonconforming material
3.8 Occurrence
3.9 Recurrence
3.10 Preliminary Review (PR)
3.11 Quality Improvement Project (QIP)
3.12 Repair
3.13 Rework
3.14 Scrap
3.15 Standard Repair Procedure (SRP)
3.16 Statistical Process Control (SPC)
3.17 Supplier
3.18 Use-as-is
3.19 Definitions of acronyms used in this standard
4 General requirements
4.1 Corrective action and disposition system
4.2 Statistical Process Control (SPC)
4.2.1 Control limit standards
4.3 Quality improvement
4.4 Contractor's written procedures
4.5 Material Review Board (MRB)
4.5.1 MRB authority and responsibilities
4.6 Corrective Action Board (CAB)
4.6.1 CAB authority and responsibilities
4.7 Government rights
5 Detailed requirements
5.1 Identification and segregation of nonconforming
       material
5.2 PR disposition
5.3 MRB disposition
5.4 Use-as-is dispositions
5.5 Repair dispositions
5.6 Scrapped material
5.7 Nonconforming material documentation
5.7.1 Additional documentation for MRB items
5.7.2 Additional documentation for corrective action
5.7.3 Recurring nonconformances
5.7.4 Nonconformance costs
5.8 Minimum data summarization requirements
5.9 Control of material review and disposition system
       at suppliers
5.9.1 Corrective action at supplier facilities
5.9.2 Records of nonconforming material received from
       suppliers
5.10 Audits
6 Notes
6.1 Intended use
6.2 Changes from previous issue

Describes a cost effective corrective action and disposition system for non conforming material, which results in productivity and quality improvement. Coverage includes definitions, control limit standards, quality improvement, corrective action board (CAB), contractor's written procedures, material review board (MRB), and corrective action and disposition system.

Committee
AREA QCIC
DocumentType
Standard
Pages
31
PublisherName
US Military Specs/Standards/Handbooks
Status
Withdrawn

MIL H 38534 : B (1) HYBRID MICROCIRCUITS, GENERAL SPECIFICATION FOR
MIL-I-29589 Base Document:1991 INTERROGATOR SET, AN/UPX-24(V)
SAE AS7107A National Aerospace and Defense Contractors Accreditation Program Inspection System Requirements
MIL-STD-973 Base Document:1992 CONFIGURATION MANAGEMENT
MIL-STD-481 Revision B:1988 CONFIGURATION CONTROL, ENGINEERING CHANGES, DEVIATIONS AND WAIVERS (SHORT FORM)
MIL-P-83927 Revision B:1981 Power Supplies, Guided Missile Launchers, Single Types PP-2401B/A PP-2401C/A PP-2401D/A, PP-4285/A, PP-4286/A, and Composite Type PP-4506/A and PS-1037
MIL-HDBK-2097 Revision A:1997 ACQUISITION OF SUPPORT EQUIPMENT AND ASSOCIATED INTEGRATED LOGISTICS SUPPORT
SAE AS7106/2B National Aerospace and Defense Contractors Accreditation Program Requirements for Corrective Action and Disposition System for Nonconforming Material
MIL-F-70823 Revision A:1994 FUZE, ELECTRONIC TIME, M762 LOADING, ASSEMBLING, PACKING AND FUZE, ELECTRONIC TIME, M767 LESS BOOSTER
MIL-V-2961 Revision D:1990 VALVES, GLOBE, PRESSURE REDUCING, GAS SERVICE
MIL-HDBK-61 Revision A:2001 CONFIGURATION MANAGEMENT GUIDANCE
MIL A 87221 : 0 AIRCRAFT STRUCTURES, GENERAL SPECIFICATION FOR REQUEST FOR ISSUE OTHER THAN DOD MUST BE SENT VIA; ASD/ENES, WRIGHT-PATTERSON AFB OH 45433-6503
MIL R 28750 : C SUPP 1 RELAYS, SOLID STATE, SEALED, OPTICALLY ISOLATED, ZERO VOLTAGE TURN ON, 25 AMPERES, 250 VOLTS MAXIMUM, 45-440 HZ, POWER SWITCHING
MIL-V-2042 Revision E:1990 VALVE, REDUCING, WATER SERVICE, FOR NAVAL SHIPBOARD USE
MIL W 006729 : B (1) WATERTIGHTNESS OF AIRCRAFT, TESTING
MIL-E-24759 Base Document:1991 Educator Assembly, In-Line, 90 Gallons per Minute, Portable Aqueous Film-Forming Foam (AFFF) Liquid Concentrate
MIL-STD-980 Base Document:1982 FOREIGN OBJECT DAMAGE (FOD) PREVENTION IN AEROSPACE PRODUCTS
MIL-F-71021 Base Document:1991 FUZE PROXIMITY, ARTILLERY: M732A2 (UNBOOSTERED)
SAE AS7106A National Aerospace and Defense Contractors Accreditation Program (Nadcap) Quality Program Requirements

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.