• Shopping Cart
    There are no items in your cart

MIL-STD-1440 Revision A:1993

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

TEST FACILITY FOR DETERMINING PERCENT AGENT RECOVERY (NO S/S DOCUMENT)

Available format(s)

PDF

Language(s)

English

Published date

03-12-1993

Withdrawn date

10-05-1995

US$20.00
Excluding Tax where applicable

Outlines a means of testing CS pyrotechnic munitions and finding burning time of the munition and quantitative samples of the resulting agent cloud.

DocumentType
Standard
Pages
16
PublisherName
US Military Specs/Standards/Handbooks
Status
Withdrawn

This standard covers the requirements for a facility to test CS pyrotechnic munitions with provisions for obtaining burning time of the munition and quantitative samples of the resultant agent cloud.

MIL C 51335 : B NOTICE 2 CANISTER, 105MM, CS, XM8
MIL-C-60303 Revision B:1971 Cartridge, 40MM: Riot Control, CS, M674 (No S/S Document)

Access your standards online with a subscription

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

US$20.00
Excluding Tax where applicable