• Shopping Cart
    There are no items in your cart

MIL-C-21583 Base Document:1958

Current

Current

The latest, up-to-date edition.

CS Mechanism Mark 1 Mods 3, 4, 9, and 11

Available format(s)

PDF

Published date

08-20-1958

US$20.00
Excluding Tax where applicable

Specifies a clock starter mechanism operated by hydrostatic pressure, to unlock and start an attached clock delay mechanism at the proper depth.

DevelopmentNote
INACTIVE FOR NEW DESIGN NEW CHILD NOT 2 2021 IS NOW ADDED
DocumentType
Standard
Pages
14
ProductNote
NEW CHILD NOT 2 2021 IS NOW ADDED
PublisherName
US Military Specs/Standards/Handbooks
Status
Current

This specification establishes the requirements for the procurement of the CS Mechanism Mark 1 Mods 3, 4, 9, and 11.

MIL-STD-129 Revision R:2014 Military Marking for Shipment and Storage
MIL-P-116 Revision J:1988 PRESERVATION, METHODS OF (S/S BY MIL-STD-2073-1)
MIL-STD-105 Revision E:1989 Sampling Procedures and Tables for Inspection by Attributes (See Notice 3 for Replacement Information)

Access your standards online with a subscription

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

US$20.00
Excluding Tax where applicable