ISO/IEC 17020:2012
Current
The latest, up-to-date edition.
Conformity assessment — Requirements for the operation of various types of bodies performing inspection
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
French, English, Russian, Spanish, Castilian
02-27-2012
ISO/IEC 17020:2012 specifies requirements for the competence of bodies performing inspection and for the impartiality and consistency of their inspection activities.
It applies to inspection bodies of type A, B or C, as defined in ISO/IEC 17020:2012, and it applies to any stage of inspection.
Committee |
ISO/CASCO
|
DevelopmentNote |
Supersedes ISO GUIDE 39 and ISO GUIDE 57 (04/2001)
|
DocumentType |
Standard
|
Pages |
19
|
ProductNote |
THIS STANDARD ALSO HAVE A CORRECTED VERSION FR- 2013
|
PublisherName |
International Organization for Standardization
|
Status |
Current
|
Supersedes |
Standards | Relationship |
JIS Q 17020:2012 | Identical |
GOST R ISO/IEC 17020 : 2012 | Identical |
NBN EN ISO/IEC 17020 : 2012 | Identical |
NEN EN ISO/IEC 17020 : 2012 | Identical |
NS EN ISO/IEC 17020 : 2012 | Identical |
I.S. EN ISO/IEC 17020:2012 | Identical |
PN EN ISO/IEC 17020 : 2012 | Identical |
SAC GB/T 27020 : 2016 | Identical |
SN EN ISO/IEC 17020:2012 | Identical |
AS/NZS ISO/IEC 17020:2013 | Identical |
UNI CEI EN ISO/IEC 17020 : 2012 | Identical |
SS-EN ISO/IEC 17020 : 2012 | Identical |
UNE-EN ISO/IEC 17020:2012 | Identical |
BS EN ISO/IEC 17020:2012 | Identical |
CEI UNI EN ISO/IEC 17020 : 2012 | Identical |
EN ISO/IEC 17020:2012 | Identical |
NF EN ISO/IEC 17020 : 2012 | Identical |
DIN EN ISO/IEC 17020:2012-07 | Identical |
DIN EN 45004:1995-06 | Corresponds |
SAC GB/T 18346 : 2001 | Identical |
S.R. CEN/TS 12666-2:2012 | PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - POLYETHYLENE (PE) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
11/30247943 DC : 0 | EN ISO/IEC 17065 - CONFORMITY ASSESSMENT - REQUIREMENTS FOR CERTIFICATION BODIES CERTIFYING PRODUCTS, PROCESSES AND SERVICES |
15/30321796 DC : 0 | BS EN 12572-2 - ARTIFICIAL CLIMBING STRUCTURES - PART 2: SAFETY REQUIREMENTS AND TEST METHODS FOR BOULDERING WALLS |
UNI CEN/TS 13476-4 : 2013 | PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - STRUCTURED-WALL PIPING SYSTEMS OF UNPLASTICIZED POLY(VINYLS CHLORIDE) (PVC-U), POLYPROPYLENE (PP) AND POLYETHYLENE (PE) - PART 4: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
I.S. EN 12079-3:2006 | OFFSHORE CONTAINERS AND ASSOCIATED LIFTING SETS - PART 3: PERIODIC INSPECTION, EXAMINATION AND TESTING |
BS ISO/IEC 27037 : 2012 | INFORMATION TECHNOLOGY - SECURITY TECHNIQUES - GUIDELINES FOR IDENTIFICATION, COLLECTION, ACQUISITION, AND PRESERVATION OF DIGITAL EVIDENCE |
03/307701 DC : DRAFT JUNE 2003 | ISO/IEC 17000 - CONFORMITY ASSESSMENT - GENERAL VOCABULARY |
14/30272915 DC : 0 | BS ISO 18400-106 - SOIL QUALITY - SAMPLING - PART 106: QUALITY CONTROL AND QUALITY ASSURANCE |
PD CEN/TS 1401-2:2012 | Plastics piping systems for non-pressure underground drainage and sewerage. Unplasticized poly(vinyl chloride) (PVC-U) Guidance for assessment of conformity |
DD CEN ISO/TS 22391-7:2011 | Plastics piping systems for hot and cold water installations. Polyethylene of raised temperature resistance (PE-RT) Guidance for the assessment of conformity |
PD 6642:1999 | General requirements for bodies providing accreditation of inspection bodies |
CEI UNI EN ISO/IEC 17067 : 2013 | CONFORMITY ASSESSMENT - FUNDAMENTALS OF PRODUCT CERTIFICATION AND GUIDELINES FOR PRODUCT CERTIFICATION SCHEMES |
03/317039 DC : DRAFT NOV 2003 | ISO/IEC GUIDE 28 - CONFORMITY ASSESSMENT - GUIDANCE ON A THIRD-PARTY CERTIFICATION SYSTEM FOR PRODUCTS |
CEI EN 61400-22 : 2011 | WIND TURBINES - PART 22: CONFORMITY TESTING AND CERTIFICATION |
BS EN ISO/IEC 17067:2013 | Conformity assessment. Fundamentals of product certification and guidelines for product certification schemes |
ISO/IEC 17000:2004 | Conformity assessment Vocabulary and general principles |
UNI CEI 70016 : 2008 | CONFORMITY ASSESSMENT - CODE OF GOOD PRACTICE |
BS ISO 12576-2:2008 | Thermal insulation products. Conformity control systems In-situ products |
17/30339497 DC : DRAFT JUNE 2017 | BS EN 14972 - FIXED FIREFIGHTING SYSTEMS - WATER MIST SYSTEMS - PART 1: DESIGN, INSTALLATION, INSPECTION AND MAINTENANCE |
PD CEN/TS 1852-2:2015 | Plastics piping systems for non-pressure underground drainage and sewerage. Polypropylene (PP) Guidance for the assessment of conformity |
14/30278956 DC : 0 | BS ISO 17842-2 - SAFETY OF AMUSEMENT RIDES AND AMUSEMENT DEVICES - PART 2: OPERATION, MAINTENANCE AND USE |
PD ISO/IEC Guide 68:2002 | Arrangements for the recognition and acceptance of conformity assessment results |
14/30229005 DC : 0 | BS ISO/IEC 29169 - INFORMATION TECHNOLOGY - PROCESS ASSESSMENT - THE APPLICATION OF CONFORMITY ASSESSMENT METHODOLOGY TO THE ASSESSMENT TO PROCESS QUALITY CHARACTERISTICS AND ORGANIZATIONAL MATURITY |
ISO/TS 20612:2007 | Water quality — Interlaboratory comparisons for proficiency testing of analytical chemistry laboratories |
PD CEN/TS 1453-2:2017 | Plastics piping systems with structured wall pipes for soil and waste discharge (low and high temperature) inside buildings. Unplasticized poly(vinyl chloride) (PVC-U) Guidance for the assessment of conformity |
PD CEN/TS 1455-2:2012 | Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure. Acrylonitrile-butadiene-styrene (ABS) Guidance for the assessment of conformity |
OIML G 21 : 2017 | GUIDANCE FOR DEFINING THE REQUIREMENTS FOR A CERTIFICATION SYSTEM FOR PREPACKAGES |
PD ISO/IEC TR 17026:2015 | Conformity assessment. Example of a certification scheme for tangible products |
BS ISO 14034 : 2016 | ENVIRONMENTAL MANAGEMENT - ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) |
BS EN ISO/IEC 27037:2016 | Information technology. Security techniques. Guidelines for identification, collection, acquisition and preservation of digital evidence |
PD CEN/TS 12666-2:2012 | Plastics piping systems for non-pressure underground drainage and sewerage. Polyethylene (PE) Guidance for the assessment of conformity |
UNI CEN/TS 1455-2 : 2012 | PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - ACRYLONITRILE-BUTADIENE-STYRENE (ABS) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
03/319521 DC : DRAFT NOV 2003 | ISO/IEC 17040 - GENERAL REQUIREMENTS FOR PEER ASSESSMENT OF CONFORMITY ASSESSMENT BODIES |
S.R. CEN/TS 12200-2:2017 | PLASTICS RAINWATER PIPING SYSTEMS FOR ABOVE GROUND EXTERNAL USE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS EN ISO/IEC 17050-1:2010 | Conformity assessment. Suppliers declaration of conformity General requirements |
UNE-CEN/TS 1555-7:2015 | Plastics piping systems for the supply of gaseous fuels - Polyethylene (PE) - Part 7: Guidance for the assessment of conformity |
S.R. CEN/TS 13598-3:2012 | PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - UNPLASTICIZED POLY(VINYL CHLORIDE)(PVC-U), POLYPROPYLENE (PP) AND POLYETHYLENE (PE) - PART 3: GUIDANCE FOR ASSESSMENT OF CONFORMITY |
PD ISO/IEC TR 15443-1:2012 | Information technology. Security techniques. Security assurance framework Introduction and concepts |
CEI UNI 70019 : 2008 | CONFORMITY ASSESSMENT ARRANGEMENTS FOR THE RECOGNITION AND ACCEPTANCE OF CONFORMITY ASSESSMENT RESULTS |
ISO 20245:2017 | Cross-border trade of second-hand goods |
I.S. EN 15358:2011 | SOLID RECOVERED FUELS - QUALITY MANAGEMENT SYSTEMS - PARTICULAR REQUIREMENTS FOR THEIR APPLICATION TO THE PRODUCTION OF SOLID RECOVERED FUELS |
S.R. CEN/TS 1566-2:2012 | PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - CHLORINATED POLY(VINYL CHLORIDE) (PVC-C) - PART 2: GUIDANCE FOR ASSESSMENT OF CONFORMITY |
I.S. EN ISO/IEC 17067:2013 | CONFORMITY ASSESSMENT - FUNDAMENTALS OF PRODUCT CERTIFICATION AND GUIDELINES FOR PRODUCT CERTIFICATION SCHEMES (ISO/IEC 17067:2013 (EQV)) |
ISO 20400:2017 | Sustainable procurement — Guidance |
UNI CEI ISO/IEC 17007 : 2010 | CONFORMITY ASSESSMENT - GUIDANCE FOR DRAFTING NORMATIVE DOCUMENTS SUITABLE FOR USE FOR CONFORMITY ASSESSMENT |
ISO/TS 15453:2017 | Gas cylinders — Seamless steel and aluminium-alloy gas cylinders — Evaluation of existing gas cylinders and consideration of their safe use in other jurisdictions |
I.S. EN ISO 13628-15:2011 | PETROLEUM AND NATURAL GAS INDUSTRIES - DESIGN AND OPERATION OF SUBSEA PRODUCTION SYSTEMS - PART 15: SUBSEA STRUCTURES AND MANIFOLDS (ISO 13628-15:2011) |
S.R. CEN/TS 1329-2:2012 | PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
OIML D 29 : 2008 | GUIDE FOR THE APPLICATION OF ISO/IEC GUIDE 65 TO ASSESSMENT OF MEASURING INSTRUMENT CERTIFICATION BODIES IN LEGAL METROLOGY |
CEI UNI EN ISO/IEC 17025 : 2008 | GENERAL REQUIREMENTS FOR THE COMPETENCE OF TESTING AND CALIBRATION LABORATORIES |
17/30363721 DC : 0 | BS EN 14564 - TANKS FOR THE TRANSPORT OF DANGEROUS GOODS - TERMINOLOGY |
UNI CEN ISO/TS 22391-7 : 2012 | PLASTICS PIPING SYSTEMS FOR HOT AND COLD WATER INSTALLATIONS - POLYETHYLENE OF RAISED TEMPERATURE RESISTANCE (PE-RT) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
API 15S : 2016 | SPOOLABLE REINFORCED PLASTIC LINE PIPE |
NFPA 1906 : 2016 | WILDLAND FIRE APPARATUS |
NFPA 1901:2016 | AUTOMOTIVE FIRE APPARATUS |
EN 15567-1:2015 | Sports and recreational facilities - Ropes courses - Part 1: Construction and safety requirements |
DIN EN 12732:2014-07 | Gas infrastructure - Welding steel pipework - Functional requirements (includes Amendment A1:2014) |
DIN EN 12572-1:2015-07 (Draft) | ARTIFICIAL CLIMBING STRUCTURES - PART 1: SAFETY REQUIREMENTS AND TEST METHODS FOR ACS WITH PROTECTION POINTS |
EN 197-2:2014 | Cement - Part 2: Conformity evaluation |
IEC 61400-2:2013 | Wind turbines - Part 2: Small wind turbines |
14/30278953 DC : 0 | BS ISO 17842-1 - SAFETY OF AMUSEMENT RIDES AND AMUSEMENT DEVICES - PART 1: DESIGN AND MANUFACTURE |
CEN/TS 13598-3:2012 | Plastics piping systems for non-pressure underground drainage and sewerage - Unplasticized poly(vinyl chloride)(PVC-U), polypropylene (PP) and polyethylene (PE) - Part 3: Guidance for assessment of conformity |
EN 61400-2:2014 | Wind turbines - Part 2: Small wind turbines |
EN 50518-3:2013 | MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
CEN/TS 1453-2:2017 | Plastics piping systems with structured wall pipes for soil and waste discharge (low and high temperature) inside buildings - Unplasticized poly(vinyl chloride) (PVC-U) - Part 2: Guidance for the assessment of conformity |
CEN/TS 12666-2:2012 | Plastics piping systems for non-pressure underground drainage and sewerage - Polyethylene (PE) - Part 2: Guidance for the assessment of conformity |
CEN/TS 13476-4:2013 | Plastics piping systems for non-pressure underground drainage and sewerage - Structured-wall piping systems of unplasticized poly(vinyl chloride) (PVC-U), polypropylene (PP) and polyethylene (PE) - Part 4: Guidance for the assessment of conformity |
EN 12572-1:2017 | Artificial climbing structures - Part 1: Safety requirements and test methods for ACS with protection points |
CEN/TS 1566-2:2012 | Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure - Chlorinated poly(vinyl chloride) (PVC-C) - Part 2: Guidance for assessment of conformity |
CEN/TS 1852-2:2015 | Plastics piping systems for non-pressure underground drainage and sewerage - Polypropylene (PP) - Part 2: Guidance for the assessment of conformity |
CEN/TS 1455-2:2012 | Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure - Acrylonitrile-butadiene-styrene (ABS) - Part 2: Guidance for the assessment of conformity |
UNI EN 12732 : 2014 | GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
CLC/TR 50506-1:2007 | Railway applications - Communication, signalling and processing systems - Application Guide for EN 50129 - Part 1: Cross-acceptance |
EN ISO/IEC 17050-1:2010 | Conformity assessment - Supplier's declaration of conformity - Part 1: General requirements (ISO/IEC 17050-1:2004, corrected version 2007-06-15) |
EN 15358:2011 | Solid recovered fuels - Quality management systems - Particular requirements for their application to the production of solid recovered fuels |
CLC/TR 50506-2:2009 | RAILWAY APPLICATIONS - COMMUNICATION, SIGNALLING AND PROCESSING SYSTEMS - APPLICATION GUIDE FOR EN 50129 - PART 2: SAFETY ASSURANCE |
INCITS/ISO/IEC 27037 : 2014 | INFORMATION TECHNOLOGY - SECURITY TECHNIQUES - GUIDELINES FOR IDENTIFICATION, COLLECTION, ACQUISITION AND PRESERVATION OF DIGITAL EVIDENCE |
UNI CEN/TS 1452-7 : 2014 | PLASTICS PIPING SYSTEMS FOR WATER SUPPLY AND FOR BURIED AND ABOVE-GROUND DRAINAGE AND SEWERAGE UNDER PRESSURE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
PD ISO/IEC Guide 67:2004 | Conformity asessment. Fundamentals of product certification |
ECA ILAC G3 : 2012 | GUIDELINES FOR TRAINING COURSES FOR ASSESSORS USED BY ACCREDITATION BODIES |
16/30302061 DC : 0 | BS 6349-5 - MARITIME WORKS - PART 5: CODE OF PRACTICE FOR DREDGING AND RECLAMATION |
BS EN 15358:2011 | Solid recovered fuels. Quality management systems. Particular requirements for their application to the production of solid recovered fuels |
UNI CEI 70019 : 2008 | CONFORMITY ASSESSMENT - ARRANGEMENTS FOR THE RECOGNITION AND ACCEPTANCE OF CONFORMITY ASSESSMENT RESULTS |
ISO/TR 79:2015 | Reference materials - Examples of reference materials for qualitative properties |
UNI EN ISO 13628-15 : 2011 | PETROLEUM AND NATURAL GAS INDUSTRIES - DESIGN AND OPERATION OF SUBSEA PRODUCTION SYSTEMS - PART 15: SUBSEA STRUCTURES AND MANIFOLDS |
BS ISO/IEC 33001:2015 | Information technology. Process assessment. Concepts and terminology |
BS EN 3-10:2009 | Portable fire extinguishers Provisions for evaluating the conformity of a portable fire extinguisher to EN 3-7 |
PD CLC/TR 50506-2:2009 | Railway applications. Communication, signalling and processing systems. Application guide for EN 50129 Safety assurance |
12/30236911 DC : 0 | BS EN ISO/IEC 17067 - CONFORMITY ASSESSMENT - FUNDAMENTALS OF PRODUCT CERTIFICATION AND GUIDELINES FOR PRODUCT CERTIFICATION SCHEMES |
BS EN ISO/IEC 17040:2005 | Conformity assessment. General requirements for peer assessment of conformity assessment bodies and accreditation bodies |
16/30331322 DC : 0 | BS EN ISO 20166-2 - MOLECULAR IN VITRO DIAGNOSTIC EXAMINATIONS - SPECIFICATIONS FOR PRE-EXAMINATIONS PROCESSES FOR FORMALIN-FIXED AND PARAFFIN-EMBEDDED (FFPE) TISSUE - PART 2: ISOLATED PROTEINS |
BS EN ISO 13628-15:2011 | Petroleum and natural gas industries. Design and operation of subsea production systems Subsea structures and manifolds |
PD CEN/TS 1451-2:2012 | Plastic piping systems for soil and waste discharge (low and high temperature) within the building structure. Polypropylene (PP) Guidance for the assessment of conformity |
17/30349163 DC : 0 | BS ISO 20387 - BIOTECHNOLOGY - BIOBANKING - GENERAL REQUIREMENTS FOR BIOBANKING |
UNI CEN/TS 1519-2 : 2012 | PLASTIC PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - POLYETHYLEN (PE) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS ISO 18400-106:2017 | Soil quality. Sampling Quality control and quality assurance |
ISO 17842-3:2015 | Safety of amusement rides and amusement devices Part 3: Requirements for inspection during design, manufacture, operation and use |
PREN 50518-3 : DRAFT 2009 | MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
CEI UNI EN ISO/IEC 17050-1 : 2010 | CONFORMITY ASSESSMENT - SUPPLIER'S DECLARATION OF CONFORMITY - PART 1: GENERAL REQUIREMENTS |
CEI UNI EN ISO/IEC 17040 : 2008 | CONFORMITY ASSESSMENT - GENERAL REQUIREMENTS FOR PEER ASSESSMENT OF CONFORMITY ASSESSMENT BODIES AND ACCREDITATION BODIES |
UNI EN 15358 : 2011 | SOLID RECOVERED FUELS - QUALITY MANAGEMENT SYSTEMS - PARTICULAR REQUIREMENTS FOR THEIR APPLICATION TO THE PRODUCTION OF SOLID RECOVERED FUELS |
UNI CEN/TS 12666-2 : 2012 | PLASTICS PIPING SYSTEMS FOR NON- PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - POLYETHYLENE (PE) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
I.S. EN 16125:2015 | LPG EQUIPMENT AND ACCESSORIES - PIPEWORK SYSTEMS AND SUPPORTS - LPG IN LIQUID PHASE AND VAPOUR PRESSURE PHASE |
BS EN ISO/IEC 17025:2017 | General requirements for the competence of testing and calibration laboratories |
I.S. EN ISO/IEC 17065:2012 | CONFORMITY ASSESSMENT - REQUIREMENTS FOR BODIES CERTIFYING PRODUCTS, PROCESSES AND SERVICES (ISO/IEC 17065:2012) |
S.R. CEN/TS 14632:2012 | PLASTICS PIPING SYSTEMS FOR DRAINAGE, SEWERAGE AND WATER SUPPLY, PRESSURE AND NON-PRESSURE - GLASS-REINFORCED THERMOSETTING PLASTICS (GRP) BASED ON UNSATURATED POLYESTER RESIN (UP) - GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
DIN EN ISO/IEC 17000:2005-03 | CONFORMITY ASSESSMENT - VOCABULARY AND GENERAL PRINCIPLES |
S.R. CEN/TS 1401-2:2012 | PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 2: GUIDANCE FOR ASSESSMENT OF CONFORMITY |
CEN ISO/TS 22391-7:2011 | Plastics piping systems for hot and cold water installations - Polyethylene of raised temperature resistance (PE-RT) - Part 7: Guidance for the assessment of conformity (ISO/TS 22391-7:2011) |
CSA C61400-2:2008 | WIND TURBINES - PART 2: DESIGN REQUIREMENTS FOR SMALL WIND TURBINES |
CEI UNI EN ISO/IEC 17065 : 2012 | CONFORMITY ASSESSMENT - REQUIREMENTS FOR BODIES CERTIFYING PRODUCTS, PROCESSES AND SERVICES |
CEI UNI EN ISO/IEC 17000 : 2011 | CONFORMITY ASSESSMENT - VOCABULARY AND GENERAL PRINCIPLES |
I.S. EN 61400-2:2014 | WIND TURBINES - PART 2: SMALL WIND TURBINES |
ISO/TS 22559-3:2011 | Safety requirements for lifts (elevators) — Part 3: Global conformity assessment procedures (GCAP) — Prerequisites for certification of conformity of lift systems, lift components and lift functions |
DIN EN 197-2:2014-05 | CEMENT - PART 2: CONFORMITY EVALUATION |
I.S. EN ISO/IEC 17040:2005 | CONFORMITY ASSESSMENT - GENERAL REQUIREMENTS FOR PEER ASSESSMENT OF CONFORMITY ASSESSMENT BODIES AND ACCREDITATION BODIES |
BS EN 14564:2013 | Tanks for transport of dangerous goods. Terminology |
BS EN 15567-2:2015 | Sports- and recreational facilities. Ropes courses Operation requirements |
BS EN 15567-1:2015 | Sports and recreational facilities. Ropes courses Construction and safety requirements |
CEN/TS 1519-2:2012 | Plastic piping systems for soil and waste discharge (low and high temperature) within the building structure - Polyethylen (PE) - Part 2: Guidance for the assessment of conformity |
DIN EN 1775:2007-10 | Gas supply - Gas pipework for buildings - Maximum operating pressure less than or equal to 5 bar - Functional recommendations |
DIN EN 12572-2:2017-05 | ARTIFICIAL CLIMBING STRUCTURES - PART 2: SAFETY REQUIREMENTS AND TEST METHODS FOR BOULDERING WALLS |
I.S. EN 15567-2:2015 | SPORTS AND RECREATIONAL FACILITIES - ROPES COURSES - PART 2: OPERATION REQUIREMENTS |
DIN EN 12572-1:2017-05 | ARTIFICIAL CLIMBING STRUCTURES - PART 1: SAFETY REQUIREMENTS AND TEST METHODS FOR ACS WITH PROTECTION POINTS |
I.S. EN 196-10:2016 | METHODS OF TESTING CEMENT - PART 10: DETERMINATION OF THE WATER-SOLUBLE CHROMIUM (6) CONTENT OF CEMENT |
DIN EN 197-2:2000-11 | CEMENT - PART 2: CONFORMITY EVALUATION |
I.S. EN 12732:2013 | GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
I.S. EN 12572-1:2017 | ARTIFICIAL CLIMBING STRUCTURES - PART 1: SAFETY REQUIREMENTS AND TEST METHODS FOR ACS WITH PROTECTION POINTS |
I.S. EN 1775:2007 | GAS SUPPLY - GAS PIPEWORK FOR BUILDINGS - MAXIMUM OPERATING PRESSURE LESS THAN OR EQUAL TO 5 BAR - FUNCTIONAL RECOMMENDATIONS |
DIN EN 12732:2000-09 | GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
VDI 2055 Blatt 2:2013-10 | Thermal insulation of heated and refrigerated operational installations in the industry and in the building services - Technical basics for the verification of properties of insulating materials |
NFPA 1900:2024 | Standard for Aircraft Rescue and Fireghting Vehicles, Automotive Fire Apparatus, Wildland Fire Apparatus, and Automotive Ambulances |
NFPA 1910:2024 | Standard for the Inspection, Maintenance, Refurbishment, Testing, and Retirement of In-Service Emergency Vehicles and Marine Firefighting Vessels |
VDI 4208 Blatt 2:2011-10 | Requirements on bodies for emission monitoring at small firing installations - Bodies for periodic testing of performance-tested measuring devices |
UNI CEN/TS 1565-2 : 2012 | PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - STYRENE-COPOLYMER BLENDS (SAN+PVC) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
PD CEN/TS 14632:2012 | Plastics piping systems for drainage, sewerage and water supply, pressure and non-pressure. Glass-reinforced thermosetting plastics (GRP) based on unsaturated polyester resin (UP). Guidance for the assessment of conformity |
UNI CEI EN 50518-3 : 2014 | MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
DIN CEN/TS 1452-7;DIN SPEC 19675:2014-05 | PLASTICS PIPING SYSTEMS FOR WATER SUPPLY AND FOR BURIED AND ABOVE-GROUND DRAINAGE AND SEWERAGE UNDER PRESSURE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS ISO 20400:2017 | Sustainable procurement. Guidance |
BS ISO 17842-3:2015 | Safety of amusement rides and amusement devices Requirements for inspection during design, manufacture, operation and use |
PD CLC/TR 50506-1:2007 | Railway applications. Communication, signalling and processing systems. Application guide for EN 50129 Cross-acceptance |
11/30207799 DC : 0 | BS ISO/IEC 27037 - INFORMATION TECHNOLOGY - SECURITY TECHNIQUES - GUIDELINES FOR IDENTIFICATION, COLLECTION, ACQUISITION AND PRESERVATION OF DIGITAL EVIDENCE |
BS EN ISO/IEC 17000:2004 | Conformity assessment. Vocabulary and general principles |
09/30183531 DC : 0 | BS EN 50518-3 - MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
I.S. EN 3-10:2009 | PORTABLE FIRE EXTINGUISHERS - PART 10: PROVISIONS FOR EVALUATING THE CONFORMITY OF A PORTABLE FIRE EXTINGUISHER TO EN 3-7 |
PD ISO/TR 79:2015 | Reference materials. Examples of reference materials for qualitative properties |
09/30172965 DC : 0 | BS EN ISO 13628-15 - PETROLEUM AND NATURAL GAS INDUSTRIES - DESIGN AND OPERATION OF SUBSEA PRODUCTION SYSTEMS - PART 15: SUBSEA STRUCTURES AND MANIFOLDS |
PD CEN/TS 13598-3:2012 | Plastics piping systems for non-pressure underground drainage and sewerage. Unplasticized poly(vinyl chloride)(PVC-U), polypropylene (PP) and polyethylene (PE) Guidance for assessment of conformity |
03/317065 DC : DRAFT NOV 2003 | ISO/IEC 17025 - GENERAL REQUIREMENTS FOR THE COMPETENCE OF TESTING AND CALIBRATION LABS - AMENDMENT 1 |
UNI CEI EN ISO/IEC 17065 : 2012 | CONFORMITY ASSESSMENT - REQUIREMENTS FOR BODIES CERTIFYING PRODUCTS, PROCESSES AND SERVICES |
17/30323821 DC : 0 | BS ISO 20245 - CROSS-BORDER TRADE OF SECOND-HAND GOODS |
17/30345251 DC : 0 | BS ISO 10144 - STEELS FOR THE REINFORCEMENT AND PRESTRESSING OF CONRETE - CERTIFICATION SCHEME FOR STEEL BARS AND WIRES |
UNI CEN/TS 1566-2 : 2012 | PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - CHORINATED POLY(VINYL CHLORIDE) (PVC-C) - PART 2: GUIDANCE FOR ASSESSMENT OF CONFORMITY |
UNI ISO 23814 : 2012 | CRANES - COMPETENCY REQUIREMENTS FOR CRANE INSPECTORS |
PREN 14564 : DRAFT 2017 | TANKS FOR THE TRANSPORT OF DANGEROUS GOODS - TERMINOLOGY |
PD CEN/TS 1566-2:2012 | Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure. Chlorinated poly(vinyl chloride) (PVC-C) Guidance for assessment of conformity |
14/30300670 DC : 0 | BS ISO 17842-3 - SAFETY OF AMUSEMENT RIDES AND AMUSEMENT DEVICES - PART 3: REQUIREMENTS FOR INSPECTION DURING DESIGN, MANUFACTURE, OPERATION AND USE |
15/30310924 DC : 0 | BS ISO 14034 - ENVIRONMENTAL MANAGEMENT - ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) |
PD ISO/IEC TR 15504-7:2008 | Information technology. Process assessment Assessment of organizational maturity |
PD IEC WT 01:2001 | IEC system for conformity testing and certification of wind turbines. Rules and procedures |
UNI EN 14564 : 2013 | TANKS FOR TRANSPORT OF DANGEROUS GOODS - TERMINOLOGY |
S.R. CEN/TS 12201-7:2014 | PLASTICS PIPING SYSTEMS FOR WATER SUPPLY, AND FOR DRAINAGE AND SEWERAGE UNDER PRESSURE - POLYETHYLENE (PE) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
S.R. CEN/TS 1565-2:2012 | PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - STYRENE-COPOLYMER BLENDS (SAN+PVC) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
PD CEN/TS 1555-7:2013 | Plastics piping systems for the supply of gaseous fuels. Polyethylene (PE) Guidance for the assessment of conformity |
UNE-EN 61400-2:2015 | Wind turbines - Part 2: Small wind turbines |
UNE-EN 15358:2011 | Solid recovered fuels - Quality management systems - Particular requirements for their application to the production of solid recovered fuels |
UNE-EN 3-10:2010 | Portable fire extinguishers - Part 10: Provisions for evaluating the conformity of a portable fire extinguisher to EN 3-7 |
UNI CEI EN ISO/IEC 17030 : 2009 | CONFORMITY ASSESSMENT - GENERAL REQUIREMENTS FOR THIRD-PARTY MARKS OF CONFORMITY |
17/30316733 DC : 0 | BS ISO 16696-1 - TIMBER STRUCTURES - CROSS LAMINATED TIMBER - PART 1: COMPONENT PERFORMANCE AND PRODUCTION REQUIREMENTS |
BIS IS/ISO/IEC 17025 : 2005 AMD 1 | GENERAL REQUIREMENTS FOR THE COMPETENCE OF TESTING AND CALIBRATION LABORATORIES |
DD ISO/TS 22559-4:2011 | Safety requirements for lifts (elevators) Global conformity assessment procedures (GCAP). Certification and accreditation requirements |
16/30326643 DC : 0 | BS EN ISO 20166-1 - MOLECULAR IN VITRO DIAGNOSTIC EXAMINATIONS - SPECIFICATIONS FOR PRE-EXAMINATION PROCESSES FOR FORMALIN-FIXED AND PARAFFIN-EMBEDDED (FFPE) TISSUE - PART 1: ISOLATED RNA |
PD CEN/TS 12201-7:2014 | Plastics piping systems for water supply, and for drainage and sewerage under pressure. Polyethylene (PE) Guidance for the assessment of conformity |
NF ISO/IEC TR 17010 : 2000 FD | EXIGENCES GENERALES RELATIVES AUX ORGANISMES PROCEDANT A L'ACCREDITATION D'ORGANISMES D'INSPECTION |
S.R. CEN/TS 1455-2:2012 | PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - ACRYLONITRILE-BUTADIENE-STYRENE (ABS) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
03/307737 DC : DRAFT JUNE 2003 | ISO/IEC 17050-1 - CONFORMITY ASSESSMENT - SUPPLIER'S DECLARATION OF CONFORMITY - PART 1: GENERAL REQUIREMENTS |
UNE-ISO 20400:2017 | Sustainable procurement. Guidance |
UNE-ISO/IEC 17007:2010 | Conformity assessment. Guidance for drafting normative documents suitable for use for conformity assessment |
ISO/IEC 29169:2016 | Information technology Process assessment Application of conformity assessment methodology to the assessment to process quality characteristics and organizational maturity |
CEI UNI EN ISO/IEC 27037 : 1ED 2017 | INFORMATION TECHNOLOGY - SECURITY TECHNIQUES - GUIDELINES FOR IDENTIFICATION, COLLECTION, ACQUISITION AND PRESERVATION OF DIGITAL EVIDENCE |
CEI UNI ISO/IEC 17007 : 2012 | CONFORMITY ASSESSMENT - GUIDANCE FOR DRAFTING NORMATIVE DOCUMENTS SUITABLE FOR USE FOR CONFORMITY ASSESSMENT |
UNE-EN ISO/IEC 17067:2014 | Conformity assessment - Fundamentals of product certification and guidelines for product certification schemes (ISO/IEC 17067:2013) |
NFPA 790 : 2018 | COMPETENCY OF THIRD-PARTY FIELD EVALUATION BODIES |
CEI UNI EN ISO/IEC 17011 : 2008 | CONFORMITY ASSESSMENT - GENERAL REQUIREMENTS FOR ACCREDITATION BODIES ACCREDITING CONFORMITY ASSESSMENT BODIES |
ISO/TS 20245:2014 | Cross-border trade of second-hand goods |
CSA C61400-2 : 2008 : R2013 | WIND TURBINES - PART 2: DESIGN REQUIREMENTS FOR SMALL WIND TURBINES |
UNI CEN/TS 1451-2 : 2012 | PLASTIC PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - POLYPROPYLENE (PP) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
I.S. EN 14564:2013 | TANKS FOR TRANSPORT OF DANGEROUS GOODS - TERMINOLOGY |
S.R. CEN/TS 1519-2:2012 | PLASTIC PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - POLYETHYLEN (PE) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
PREN 12572-2 : DRAFT 2015 | ARTIFICIAL CLIMBING STRUCTURES - PART 2: SAFETY REQUIREMENTS AND TEST METHODS FOR BOULDERING WALLS |
ISO 18400-106:2017 | Soil quality — Sampling — Part 106: Quality control and quality assurance |
BS EN 16125:2015 | LPG Equipment and Accessories. Pipework systems and supports. LPG in liquid phase and vapour pressure phase |
UNI CEI 70006 : 2008 | CONFORMITY ASSESSMENT - GUIDANCE ON A THIRD-PARTY CERTIFICATION SYSTEM FOR PRODUCTS |
OIML D 9 : 2004 | PRINCIPLES OF METROLOGICAL SUPERVISION |
PREN 17066-1 : DRAFT 2016 | INSULATED MEANS OF TRANSPORT FOR TEMPERATURE SENSITIVE GOODS - REQUIREMENTS AND TESTING - PART 1: CONTAINER |
ISO/IEC Guide 28:2004 | Conformity assessment Guidance on a third-party certification system for products |
ISO 17842-2:2015 | Safety of amusement rides and amusement devices Part 2: Operation and use |
ISO/TS 22391-7:2011 | Plastics piping systems for hot and cold water installations Polyethylene of raised temperature resistance (PE-RT) Part 7: Guidance for the assessment of conformity |
ISO 17842-1:2015 | Safety of amusement rides and amusement devices — Part 1: Design and manufacture |
I.S. EN 12572-2:2017 | ARTIFICIAL CLIMBING STRUCTURES - PART 2: SAFETY REQUIREMENTS AND TEST METHODS FOR BOULDERING WALLS |
I.S. EN ISO/IEC 17011:2017 | CONFORMITY ASSESSMENT - REQUIREMENTS FOR ACCREDITATION BODIES ACCREDITING CONFORMITY ASSESSMENT BODIES (ISO/IEC 17011:2017) |
ISO/IEC 27037:2012 | Information technology — Security techniques — Guidelines for identification, collection, acquisition and preservation of digital evidence |
BS EN 197-2:2014 | Cement Conformity evaluation |
ASTM E 3038 : 2016 | Standard Practice for Assessing and Qualifying Candidates as Inspectors of Firestop Systems and Fire-Resistive Joint Systems |
EEMUA 193 : 2013 | MANAGING COMPETENCE ASSURANCE FOR PERSONNEL UNDERTAKING IN-SERVICE INSPECTION OF PRESSURE EQUIPMENT |
OVE/ONORM EN 61400-22 : 2011 | WIND TURBINES - PART 22: CONFORMITY TESTING AND CERTIFICATION (IEC 61400-22:2010) |
UNE-EN 61400-22:2011 | Wind turbines - Part 22: Conformity testing and certification |
ASTM E 2634 : 2017-06 | SPECIFICATION FOR FLAT WALL INSULATING CONCRETE FORM (ICF) SYSTEMS |
UNE-EN 16125:2016 | LPG Equipment and Accessories - Pipework systems and supports - LPG in liquid phase and vapour pressure phase |
EN ISO/IEC 17040:2005 | Conformity assessment - General requirements for peer assessment of conformity assessment bodies and accreditation bodies (ISO/IEC 17040:2005) |
UNI EN 1775 : 2007 | GAS SUPPLY - GAS PIPEWORK FOR BUILDINGS - MAXIMUM OPERATING PRESSURE LESS THAN OR EQUAL TO 5 BAR - FUNCTIONAL RECOMMENDATIONS |
UNI EN 15001-1 : 2009 | GAS INFRASTRUCTURE - GAS INSTALLATION PIPEWORK WITH AN OPERATING PRESSURE GREATER THAN 0,5 BAR FOR INDUSTRIAL INSTALLATIONS AND GREATER THAN 5 BAR FOR INDUSTRIAL AND NON-INDUSTRIAL INSTALLATIONS - PART 1: DETAILED FUNCTIONAL REQUIREMENTS FOR DESIGN, MATERIALS, CONSTRUCTION, INSPECTION AND TESTING |
06/30141610 DC : DRAFT AUG 2006 | ISO 20612 - WATER QUALITY - INTERLABORATORY COMPARISONS FOR PROFICIENCY TESTING OF ANALYTICAL TESTING LABORATORIES |
ECA ILAC P9 : 2014 | ILAC POLICY FOR PARTICIPATION IN PROFICIENCY TESTING ACTIVITIES |
UNI CEN/TS 12201-7 : 2014 | PLASTICS PIPING SYSTEMS FOR WATER SUPPLY, AND FOR DRAINAGE AND SEWERAGE UNDER PRESSURE - POLYETHYLENE (PE) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
PD CEN/TS 13476-4:2013 | Plastics piping systems for non-pressure underground drainage and sewerage. Structured-wall piping systems of unplasticized poly(vinyl chloride) (PVC-U), polypropylene (PP) and polyethylene (PE) Guidance for the assessment of conformity |
ECA ILAC G19 : 2014 | MODULES IN A FORENSIC SCIENCE PROCESS |
S.R. CEN/TS 1852-2:2015 | PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - POLYPROPYLENE (PP) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS EN ISO/IEC 17030:2009 | Conformity assessment. General requirements for third-party marks of conformity |
UNI CEN/TR 14245 : 2015 | CEMENT - GUIDELINES FOR THE APPLICATION OF EN 197-2 CONFORMITY EVALUATION |
BS EN ISO/IEC 17065:2012 | Conformity assessment. Requirements for bodies certifying products, processes and services |
PD ISO/IEC GUIDE 28:2004 | Conformity assessment. Guidance on a third-party certification system for products |
15/30291985 DC : 0 | BS ISO 19202-1 - SUMMER TOBOGGAN RUNS - PART 1: SAFETY REQUIREMENTS AND TEST METHODS |
CEI UNI EN ISO/IEC 17030 : 2009 | CONFORMITY ASSESSMENT - GENERAL REQUIREMENTS FOR THIRD-PARTY MARKS OF CONFORMITY |
PD CEN/TS 1452-7:2014 | Plastics piping systems for water supply and for buried and above-ground drainage and sewerage under pressure. Unplasticized poly(vinyl chloride) (PVC-U) Guidance for the assessment of conformity |
ISO 10855-3:2018 | Offshore containers and associated lifting sets Part 3: Periodic inspection, examination and testing |
UNE-CEN/TS 1453-2:2017 | Plastics piping systems with structured wall pipes for soil and waste discharge (low and high temperature) inside buildings - Unplasticized poly(vinyl chloride) (PVC-U) - Part 2: Guidance for the assessment of conformity |
ISO/IEC TR 17028:2017 | Conformity assessment Guidelines and examples of a certification scheme for services |
ECA ILAC P15 : 2016 | APPLICATION OF ISO/IEC 17020:2012 FOR THE ACCREDITATION OF INSPECTION BODIES |
16/30344980 DC : 0 | BS ISO 20400 - SUSTAINABLE PROCUREMENT - GUIDANCE |
BS ISO 17712:2013 | Freight containers. Mechanical seals |
PD CEN/TS 12200-2:2017 | Plastics rainwater piping systems for above ground external use. Unplasticized poly(vinyl chloride) (PVC-U) Guidance for the assessment of conformity |
06/30142613 DC : DRAFT MAY 2006 | ISO 23814 - CRANES - COMPETENCY REQUIREMENTS FOR CRANE INSPECTORS |
UNI CEN/TS 1555-7 : 2013 | PLASTICS PIPING SYSTEMS FOR THE SUPPLY OF GASEOUS FUELS - POLYETHYLENE (PE) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
BS ISO 17842-2:2015 | Safety of amusement rides and amusement devices Operation and use |
03/317040 DC : DRAFT NOV 2003 | ISO/IEC GUIDE 67 - FUNDAMENTALS OF PRODUCT CERTIFICATION |
BS ISO/IEC 29169:2016 | Information technology. Process assessment. Application of conformity assessment methodology to the assessment to process quality characteristics and organizational maturity |
PREN 12572-1 : DRAFT 2015 | ARTIFICIAL CLIMBING STRUCTURES - PART 1: SAFETY REQUIREMENTS AND TEST METHODS FOR ACS WITH PROTECTION POINTS |
PD CEN/TS 1519-2:2012 | Plastic piping systems for soil and waste discharge (low and high temperature) within the building structure. Polyethylen (PE) Guidance for the assessment of conformity |
DD ISO/TS 22559-3:2011 | Safety requirements for lifts (elevators) Global conformity assessment procedures (GCAP). Prerequisites for certification of conformity of lift systems, lift components and lift functions |
15/30331867 DC : 0 | BS EN ISO 10855-3 - OFFSHORE CONTAINERS AND ASSOCIATED LIFTING SETS - PART 3: PERIODIC INSPECTION, EXAMINATION AND TESTING |
13/30276940 DC : 0 | BS EN 16125 - LPG EQUIPMENT AND ACCESSORIES - PIPEWORK SYSTEMS AND SUPPORTS - LPG LIQUID PHASE AND VAPOUR PRESSURE PHASE |
16/30331325 DC : 0 | BS EN ISO 20166-3 - MOLECULAR IN VITRO DIAGNOSTIC EXAMINATIONS - SPECIFICATIONS FOR PRE- EXAMINATION PROCESSES FOR FORMALIN-FIXED AND PARAFFIN-EMBEDDED (FFPE) TISSUE - PART 3: ISOLATED DNA |
UNI CEI EN ISO/IEC 17000 : 2005 | CONFORMITY ASSESSMENT - VOCABULARY AND GENERAL PRINCIPLES |
04/30108568 DC : 0 | ISO/IEC GUIDE 60 - CODE OF GOOD PRACTICE FOR CONFORMITY ASSESSMENT |
EN 12079-3:2006 | Offshore containers and associated lifting sets - Part 3: Periodic inspection, examination and testing |
ACI 355.4 : 2011 | QUALIFICATION OF POST-INSTALLED ADHESIVE ANCHORS IN CONCRETE AND COMMENTARY |
16/30312185 DC : 0 | BS EN ISO/IEC 17011 - CONFORMITY ASSESSMENT - REQUIREMENTS FOR ACCREDITATION BODIES ACCREDITING CONFORMITY ASSESSMENT BODIES |
UNE-EN ISO/IEC 17065:2012 | Conformity assessment - Requirements for bodies certifying products, processes and services (ISO/IEC 17065:2012) |
UNI CEN/TS 13598-3 : 2012 | PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U), POLYPROPYLENE (PP) AND POLYETHYLENE (PE) - PART 3: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
API 17P : 2013 | DESIGN AND OPERATION OF SUBSEA PRODUCTION SYSTEMS - SUBSEA STRUCTURES AND MANIFOLDS |
UNI EN 3-10 : 2010 | PORTABLE FIRE EXTINGUISHERS - PART 10: PROVISIONS FOR EVALUATING THE CONFORMITY OF A PORTABLE FIRE EXTINGUISHER TO EN 3-7 |
UNE-EN 50518-3:2013 | Monitoring and alarm receiving centre - Part 3: Procedures and requirements for operation |
ISO 12576-2:2008 | Thermal insulation products — Conformity control systems — Part 2: In-situ products |
NFPA 1917 : 2016 | AUTOMOTIVE AMBULANCES |
ONORM M 7510-3 : 2011 | VERIFICATION OF HEATING SYSTEMS - PART 3: COMPREHENSIVE VERIFICATION OF FIRING SYSTEMS FOR LIQUID AND GASEOUS FUELS |
S.R. CEN/TR 14245:2014 | CEMENT - GUIDELINES FOR THE APPLICATION OF EN 197-2 CONFORMITY EVALUATION |
I.S. EN ISO/IEC 27037:2016 | INFORMATION TECHNOLOGY - SECURITY TECHNIQUES - GUIDELINES FOR IDENTIFICATION, COLLECTION, ACQUISITION AND PRESERVATION OF DIGITAL EVIDENCE (ISO/IEC 27037:2012) |
CSA C61400-2 : 2008 : R2018 | WIND TURBINES - PART 2: DESIGN REQUIREMENTS FOR SMALL WIND TURBINES |
S.R. CEN/TS 1452-7:2014 | PLASTICS PIPING SYSTEMS FOR WATER SUPPLY AND FOR BURIED AND ABOVE-GROUND DRAINAGE AND SEWERAGE UNDER PRESSURE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
S.R. CEN/TS 1453-2:2017 | PLASTICS PIPING SYSTEMS WITH STRUCTURED WALL PIPES FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) INSIDE BUILDINGS - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
S.R. CLC/TR 50506-2:2009 | RAILWAY APPLICATIONS - COMMUNICATION, SIGNALLING AND PROCESSING SYSTEMS - APPLICATION GUIDE FOR EN 50129 - PART 2: SAFETY ASSURANCE |
S.R. CEN/TS 13476-4:2013 | PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - STRUCTURED-WALL PIPING SYSTEMS OF UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U), POLYPROPYLENE (PP) AND POLYETHYLENE (PE) - PART 4: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
CSA ISO/IEC TR 15443-1 : 2015 | INFORMATION TECHNOLOGY - SECURITY TECHNIQUES - SECURITY ASSURANCE FRAMEWORK - PART 1: INTRODUCTION AND CONCEPTS |
ISO/IEC Guide 68:2002 | Arrangements for the recognition and acceptance of conformity assessment results |
S.R. CWA 15740:2008 | RISK-BASED INSPECTION AND MAINTENANCE PROCEDURES FOR EUROPEAN INDUSTRY (RIMAP) |
I.S. EN 15001-1:2009 | GAS INFRASTRUCTURE - GAS INSTALLATION PIPEWORK WITH AN OPERATING PRESSURE GREATER THAN 0,5 BAR FOR INDUSTRIAL INSTALLATIONS AND GREATER THAN 5 BAR FOR INDUSTRIAL AND NON-INDUSTRIAL INSTALLATIONS - PART 1: DETAILED FUNCTIONAL REQUIREMENTS FOR DESIGN, MATERIALS, CONSTRUCTION, INSPECTION AND TESTING |
PREN 14972-1 : DRAFT 2017 | FIXED FIREFIGHTING SYSTEMS - WATER MIST SYSTEMS - PART 1: DESIGN, INSTALLATION, INSPECTION AND MAINTENANCE |
ISO/IEC Guide 60:2004 | Conformity assessment Code of good practice |
BS EN 50518-3:2013 | Monitoring and alarm receiving centre Procedures and requirements for operation |
BS EN ISO/IEC 17011:2017 | Conformity assessment. Requirements for accreditation bodies accrediting conformity assessment bodies |
16/30348307 DC : 0 | BS EN 17066-1 - INSULATED MEANS OF TRANSPORT FOR TEMPERATURE SENSITIVE GOODS - REQUIREMENTS AND TESTING - PART 1: CONTAINER |
I.S. EN ISO/IEC 17000:2004 | CONFORMITY ASSESSMENT - VOCABULARY AND GENERAL PRINCIPLES |
ISO 17712:2013 | Freight containers — Mechanical seals |
ISO/IEC TR 15443-1:2012 | Information technology Security techniques Security assurance framework Part 1: Introduction and concepts |
ISO/IEC 17025:2017 | General requirements for the competence of testing and calibration laboratories |
IWA 12:2013 | Guidelines on the application of ISO 9001:2008 in policing organizations |
I.S. CWA 15554:2006 | SPECIFICATIONS FOR A WEB ACCESSIBILITY CONFORMITY ASSESSMENT SCHEME AND A WEB ACCESSIBILITY QUALITY MARK |
I.S. EN ISO/IEC 17030:2009 | CONFORMITY ASSESSMENT - GENERAL REQUIREMENTS FOR THIRD-PARTY MARKS OF CONFORMITY |
ISO/IEC Guide 67:2004 | Conformity assessment Fundamentals of product certification |
DIN EN 15567-2:2015-08 | SPORTS- AND RECREATIONAL FACILITIES - ROPES COURSES - PART 2: OPERATION REQUIREMENTS |
UNE-EN 196-10:2016 | Methods of testing cement - Part 10: Determination of the water-soluble chromium (VI) content of cement |
UNE-EN 15001-1:2010 | Gas Infrastructure - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 1: Detailed functional requirements for design, materials, construction, inspection and testing |
BS ISO 17842-1:2015 | Safety of amusement rides and amusement devices Design and manufacture |
UNI EN 197-2 : 2014 | CEMENT - PART 2: CONFORMITY EVALUATION |
UNE-EN ISO/IEC 17011:2017 | Conformity assessment - Requirements for accreditation bodies accrediting conformity assessment bodies (ISO/IEC 17011:2017) |
EN 61400-22:2011 | Wind turbines - Part 22: Conformity testing and certification |
ISO/IEC TR 15504-7:2008 | Information technology Process assessment Part 7: Assessment of organizational maturity |
I.S. EN 197-2:2014 | CEMENT - PART 2: CONFORMITY EVALUATION |
ISO/IEC 17065:2012 | Conformity assessment — Requirements for bodies certifying products, processes and services |
UNE-EN 14564:2013 | Tanks for transport of dangerous goods - Terminology |
ISO/IEC 33001:2015 | Information technology Process assessment Concepts and terminology |
CEN/TR 14245:2014 | Cement - Guidelines for the application of EN 197-2 Conformity Evaluation |
BS EN 12572-1:2017 | Artificial climbing structures Safety requirements and test methods for ACS with protection points |
UNE-EN ISO/IEC 17025:2017 | General requirements for the competence of testing and calibration laboratories (ISO/IEC 17025:2017) |
BS EN 12732 : 2013 | GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
ISO/IEC 17040:2005 | Conformity assessment — General requirements for peer assessment of conformity assessment bodies and accreditation bodies |
ASTM E 2924 : 2014 | Standard Practice for Intumescent Coatings |
ISO 13628-15:2011 | Petroleum and natural gas industries — Design and operation of subsea production systems — Part 15: Subsea structures and manifolds |
UNE-EN 12572-1:2017 | Artificial climbing structures - Part 1: Safety requirements and test methods for ACS with protection points |
UNE-EN 12732:2014+A1:2014 | Gas infrastructure - Welding steel pipework - Functional requirements |
I.S. EN 15567-1:2015 | SPORTS AND RECREATIONAL FACILITIES - ROPES COURSES - PART 1: CONSTRUCTION AND SAFETY REQUIREMENTS |
CEN/TS 1401-2:2012 | Plastics piping systems for non-pressure underground drainage and sewerage - Unplasticized poly(vinyl chloride) (PVC-U) - Part 2: Guidance for assessment of conformity |
ISO/IEC 17050-1:2004 | Conformity assessment Supplier's declaration of conformity Part 1: General requirements |
CEN/TS 14632:2012 | Plastics piping systems for drainage, sewerage and water supply, pressure and non-pressure - Glass-reinforced thermosetting plastics (GRP) based on unsaturated polyester resin (UP) - Guidance for the assessment of conformity |
EN 1775:2007 | Gas supply - Gas pipework for buildings - Maximum operating pressure less than or equal to 5 bar - Functional recommendations |
EN 15567-2:2015 | Sports- and recreational facilities - Ropes courses - Part 2: Operation requirements |
EN 15001-1:2009 | Gas Infrastructure - Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations - Part 1: Detailed functional requirements for design, materials, construction, inspection and testing |
CEN/TS 1565-2:2012 | Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure - Styrene-copolymer blends (SAN+PVC) - Part 2: Guidance for the assessment of conformity |
EN ISO 13628-15:2011 | Petroleum and natural gas industries - Design and operation of subsea production systems - Part 15: Subsea structures and manifolds (ISO 13628-15:2011) |
EN 16125:2015 | LPG Equipment and Accessories - Pipework systems and supports - LPG in liquid phase and vapour pressure phase |
EN ISO/IEC 17067:2013 | Conformity assessment - Fundamentals of product certification and guidelines for product certification schemes (ISO/IEC 17067:2013) |
EN 14564:2013 | Tanks for transport of dangerous goods - Terminology |
EN 3-10:2009 | Portable fire extinguishers - Part 10: Provisions for evaluating the conformity of a portable fire extinguisher to EN 3-7 |
EN 196-10:2016 | Methods of testing cement - Part 10: Determination of the water-soluble chromium (VI) content of cement |
EN ISO/IEC 27037:2016 | Information technology - Security techniques - Guidelines for identification, collection, acquisition and preservation of digital evidence (ISO/IEC 27037:2012) |
DIN EN 16125:2016-03 | LPG EQUIPMENT AND ACCESSORIES - PIPEWORK SYSTEMS AND SUPPORTS - LPG LIQUID PHASE AND VAPOUR PRESSURE PHASE |
NF EN 61400-22:2011 | WIND TURBINES - PART 22: CONFORMITY TESTING AND CERTIFICATION |
DIN EN 3-10:2010-03 | Portable fire extinguishers - Part 10: Provisions for evaluating the conformity of a portable fire extinguisher to EN 3-7 |
PD CEN/TR 14245:2014 | Cement. Guidelines for the application of EN 197-2 Conformity Evaluation |
16/30328756 DC : 0 | BS EN 13814-2 - SAFETY OF AMUSEMENT RIDES AND AMUSEMENT DEVICES - PART 2: OPERATION, MAINTENANCE AND USE |
UNE-EN 12572-2:2017 | Artificial climbing structures - Part 2: Safety requirements and test methods for bouldering walls |
07/30163293 DC : 0 | BS ISO 12576-2 - THERMAL INSULATION PRODUCTS CONFORMITY CONTROL SYSTEMS - PART 2: IN-SITU PRODUCTS |
CEI UNI EN 50518-3 : 2015 | MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
ECA ILAC P8 : 2012 | ILAC MUTUAL RECOGNITION ARRANGEMENT (ARRANGEMENT): SUPPLEMENTARY REQUIREMENTS AND GUIDELINES FOR THE USE OF ACCREDITATION SYMBOLS AND FOR CLAIMS OF ACCREDITATION STATUS BY ACCREDITED LABORATORIES AND INSPECTION BODIES |
PD ISO/IEC TR 17028:2017 | Conformity assessment. Guidelines and examples of a certification scheme for services |
BS EN 12572-2:2017 | Artificial climbing structures Safety requirements and test methods for bouldering walls |
I.S. 820:2010 | NON-DOMESTIC GAS INSTALLATIONS |
S.R. CEN ISO/TS 22391-7:2011 | PLASTICS PIPING SYSTEMS FOR HOT AND COLD WATER INSTALLATIONS - POLYETHYLENE OF RAISED TEMPERATURE RESISTANCE (PE-RT) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY (ISO/TS 22391-7:2011) |
BS ISO 19202-1:2017 | Summer toboggan runs Safety requirements and test methods |
ASTM E 329 : 2018 : REDLINE | Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection |
UNI CEI EN ISO/IEC 17067 : 2013 | CONFORMITY ASSESSMENT - FUNDAMENTALS OF PRODUCT CERTIFICATION AND GUIDELINES FOR PRODUCT CERTIFICATION SCHEMES |
CAN/CSA-ISO/IEC 33001:16 | Information technology Process assessment Concepts and terminology (Adopted ISO/IEC 33001:2015, second edition, 2015-03-01) |
BS EN 15001-1:2009 | Gas infrastructure. Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations Detailed functional requirements for design, materials, construction, inspection and testing |
ISO 19202-1:2017 | Summer toboggan runs — Part 1: Safety requirements and test methods |
DIN EN 12572-2:2015-07 (Draft) | ARTIFICIAL CLIMBING STRUCTURES - PART 2: SAFETY REQUIREMENTS AND TEST METHODS FOR BOULDERING WALLS |
15/30321790 DC : 0 | BS EN 12572-1 - ARTIFICIAL CLIMBING STRUCTURES - PART 1: SAFETY REQUIREMENTS AND TEST METHODS FOR ACS WITH PROTECTION POINTS |
PD CEN/TS 1565-2:2012 | Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure. Styrene-copolymer blends (SAN+PVC) Guidance for the assessment of conformity |
ECA ILAC G27 : 2017 | GUIDANCE ON MEASUREMENTS PERFORMED AS PART OF AN INSPECTION PROCESS |
I.S. EN 50518-3:2013 | MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
16/30328759 DC : 0 | BS EN 13814-1 - SAFETY OF AMUSEMENT RIDES AND AMUSEMENT DEVICES - PART 1: DESIGN AND MANUFACTURE |
I.S. EN ISO/IEC 17050-1:2010 | CONFORMITY ASSESSMENT - SUPPLIER'S DECLARATION OF CONFORMITY - PART 1: GENERAL REQUIREMENTS |
ACI 355.4M : 2011 | QUALIFICATION OF POST-INSTALLED ADHESIVE ANCHORS IN CONCRETE AND COMMENTARY (METRIC VERSION) |
16/30331319 DC : 0 | BS EN ISO 20184-2 - MOLECULAR IN-VITRO DIAGNOSTIC EXAMINATIONS - SPECIFICATIONS FOR PRE-EXAMINATION PROCESSES FOR FROZEN TISSUE - PART 2: ISOLATED PROTEINS |
08/30139611 DC : DRAFT JUNE 2008 | BS ISO/IEC 17007 - CONFORMITY ASSESSMENT - GUIDELINES FOR DRAFTING NORMATIVE DOCUMENTS SUITABLE FOR USE FOR CONFORMITY ASSESSMENT |
UNI CEN/TS 14632 : 2012 | PLASTICS PIPING SYSTEMS FOR DRAINAGE, SEWERAGE AND WATER SUPPLY, PRESSURE AND NON-PRESSURE - GLASS-REINFORCED THERMOSETTING PLASTICS (GRP) BASED ON UNSATURATED POLYESTER RESIN (UP) - GUIDANCE FOR THE ASSESSMENT OF CONFORMITTY |
ISO 23814:2009 | Cranes — Competency requirements for crane inspectors |
04/30095858 DC : DRAFT AUG 2004 | BS ISO 21469 - SAFETY OF MACHINERY - LUBRICANTS WITH INCIDENTAL PRODUCT CONTACT - HYGIENE REQUIREMENTS |
DIN EN 14564:2013-04 | TANKS FOR TRANSPORT OF DANGEROUS GOODS - TERMINOLOGY |
S.R. CLC/TR 50506-1:2007 | RAILWAY APPLICATIONS - COMMUNICATION, SIGNALLING AND PROCESSING SYSTEMS - APPLICATION GUIDE FOR EN 50129 - PART 1: CROSS-ACCEPTANCE |
API 20A : 2017 | CARBON STEEL, ALLOY STEEL, STAINLESS STEEL, AND NICKEL BASE ALLOY CASTINGS FOR USE IN THE PETROLEUM AND NATURAL GAS INDUSTRY |
16/30328762 DC : 0 | BS EN 13814-3 - SAFETY OF AMUSEMENT RIDES AND AMUSEMENT DEVICES - PART 3: REQUIREMENTS FOR INSPECTION DURING DESIGN, MANUFACTURE, OPERATION AND USE |
S.R. CEN/TS 1555-7:2013 | PLASTICS PIPING SYSTEMS FOR THE SUPPLY OF GASEOUS FUELS - POLYETHYLENE (PE) - PART 7: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
S.R. CEN/TS 1451-2:2012 | PLASTIC PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - POLYPROPYLENE (PP) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
PD CEN/TS 1329-2:2012 | Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure. Unplasticized poly(vinyl chloride) (PVC-U) Guidance for the assessment of conformity |
UNI CEI EN ISO/IEC 17050-1 : 2010 | CONFORMITY ASSESSMENT - SUPPLIER'S DECLARATION OF CONFORMITY - PART 1: GENERAL REQUIREMENTS |
UNI CEN/TS 1401-2 : 2012 | PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGRONUD DRAINAGE AND SEWERAGE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 2: GUIDANCE FOR ASSESSMENT OF CONFORMITY |
UNI CEN/TS 1329-2 : 2012 | PLASTICS PIPING SYSTEMS FOR SOIL AND WASTE DISCHARGE (LOW AND HIGH TEMPERATURE) WITHIN THE BUILDING STRUCTURE - UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U) - PART 2: GUIDANCE FOR THE ASSESSMENT OF CONFORMITY |
ISO/IEC 17011:2017 | Conformity assessment — Requirements for accreditation bodies accrediting conformity assessment bodies |
ISO/TS 22559-4:2011 | Safety requirements for lifts (elevators) — Part 4: Global conformity assessment procedures (GCAP) — Certification and accreditation requirements |
ISO/IEC 17007:2009 | Conformity assessment — Guidance for drafting normative documents suitable for use for conformity assessment |
EN ISO/IEC 17000:2004 | Conformity assessment - Vocabulary and general principles (ISO/IEC 17000:2004) |
I.S. EN 61400-22:2011 | WIND TURBINES - PART 22: CONFORMITY TESTING AND CERTIFICATION |
IEC WT 01:2001 | IEC System for Conformity Testing and Certification of Wind Turbines - Rules and procedures |
ISO/IEC TR 17026:2015 | Conformity assessment Example of a certification scheme for tangible products |
EN ISO/IEC 17030:2009 | Conformity assessment - General requirements for third-party marks of conformity (ISO/IEC 17030:2003) |
IEEE 1680.1-2009 | IEEE Standard for Environmental Assessment of Personal Computer Products, Including Notebook Personal Computers, Desktop Personal Computers, and Personal Computer Displays |
BS EN 1775:2007 | Gas supply. Gas pipework for buildings. Maximum operating pressure less than or equal to 5 bar. Functional recommendations |
IEC 61400-22:2010 | Wind turbines - Part 22: Conformity testing and certification |
BS EN 12079-3:2006 | Offshore containers and associated lifting sets Periodic inspection, examination and testing |
BS EN 196-10:2016 | Methods of testing cement Determination of the water-soluble chromium (VI) content of cement |
CEN/TS 1451-2:2012 | Plastic piping systems for soil and waste discharge (low and high temperature) within the building structure - Polypropylene (PP) - Part 2: Guidance for the assessment of conformity |
CEN/TS 12200-2:2017 | Plastics rainwater piping systems for above ground external use - Unplasticized poly(vinyl chloride) (PVC-U) - Part 2: Guidance for the assessment of conformity |
DIN EN 15567-1:2015-08 | SPORTS AND RECREATIONAL FACILITIES - ROPES COURSES - PART 1: CONSTRUCTION AND SAFETY REQUIREMENTS |
EN 12572-2:2017 | Artificial climbing structures - Part 2: Safety requirements and test methods for bouldering walls |
EN ISO/IEC 17065:2012 | Conformity assessment - Requirements for bodies certifying products, processes and services (ISO/IEC 17065:2012) |
CEN/TS 1452-7:2014 | Plastics piping systems for water supply and for buried and above-ground drainage and sewerage under pressure - Unplasticized poly(vinyl chloride) (PVC-U) - Part 7: Guidance for the assessment of conformity |
CEN/TS 12201-7:2014 | Plastics piping systems for water supply, and for drainage and sewerage under pressure - Polyethylene (PE) - Part 7: Guidance for the assessment of conformity |
CEN/TS 1555-7:2013 | Plastics piping systems for the supply of gaseous fuels - Polyethylene (PE) - Part 7: Guidance for the assessment of conformity |
EN 12732:2013+A1:2014 | Gas infrastructure - Welding steel pipework - Functional requirements |
ONORM S 2077-2 : 2011 | PLASTIC SEALINGS OF CONCRETE BUILDINGS - CONCRETE PROTECTIVE LINERS - PART 2: LAYERS INSTALLATION |
UNE-EN 12732:2014 | Gas infrastructure - Welding steel pipework - Functional requirements |
UNE-EN 16125:2020 | LPG Equipment and Accessories - Pipework systems and supports - LPG in liquid phase and vapour pressure phase |
CEI UNI EN ISO/IEC 17043:2024-05 | Conformity assessment General requirements for the competence of proficiency testing providers |
CEI UNI EN ISO 20387:2021 | Biotechnology - Biobanking - General requirements for biobanking (ISO 20387:2018) |
CAN/CSA-ISO/IEC 29169:18 | Information technology ? Process assessment ? Application of conformity assessment methodology to the assessment to process quality characteristics and organizational maturity (Adopted ISO/IEC 29169:2016, first edition, 2016-04-01) |
ISO/IEC 17025:2005 | General requirements for the competence of testing and calibration laboratories |
ISO/IEC 17000:2004 | Conformity assessment Vocabulary and general principles |
ISO 19011:2011 | Guidelines for auditing management systems |
AS ISO 20387:2020 | Biotechnology - Biobanking - General requirements for biobanking |
ISO/IEC Guide 99:2007 | International vocabulary of metrology Basic and general concepts and associated terms (VIM) |
ISO 9001:2015 | Quality management systems — Requirements |
ISO 9000:2015 | Quality management systems — Fundamentals and vocabulary |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.