• Shopping Cart
    There are no items in your cart

ISA 77.13.01 : 1999 : R2008

Current

Current

The latest, up-to-date edition.

FOSSIL FUEL POWER PLANT STEAM TURBINE BYPASS SYSTEM

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2008

US$66.60
Excluding Tax where applicable

1 Scope<br>2 Purpose<br>3 Definitions<br>4 Bypass Systems<br>&nbsp;&nbsp;4.1 General requirements<br>&nbsp;&nbsp;4.2 Elements<br>&nbsp;&nbsp;4.3 Capacity<br>&nbsp;&nbsp;4.4 Design requirements<br>&nbsp;&nbsp;4.5 Turbine bypass instrumentation<br>&nbsp;&nbsp;4.6 Control and logic requirements<br>&nbsp;&nbsp;4.7 Alarm requirements<br>&nbsp;&nbsp;4.8 Operator interface<br>Annex A - References<br>Annex B - The use of bypass systems<br>Annex C - Valve life expectancy<br>Annex D - Some typical high- and low-pressure turbine bypass <br>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;valve <br>Annex E - Figures

Describes the design requirements and operator interface for steam turbine bypass systems for drum and once-through steam generators and combined cycle plants.

Committee
SP77
DevelopmentNote
Formerly it was ISA-S77.13.01 (05/2001)
DocumentType
Standard
Pages
42
ProductNote
Reconfirmed 2008
PublisherName
International Society of Automation
Status
Current

FCI 70-2 : 2013 CONTROL VALVE SEAT LEAKAGE
MSS SP 61 : 2013 PRESSURE TESTING OF VALVES
ISA 51.1 : 1979 PROCESS INSTRUMENTATION TERMINOLOGY
ISA 5.1 : 1984 INSTRUMENTATION SYMBOLS AND IDENTIFICATION

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.