IEEE 762-2006
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity
08-15-2023
English
03-15-2007
1 Overview
1.1 Scope
1.2 Purpose
2 Normative references
3 Definitions
4 Unit states
4.1 Active
4.2 Deactivated shutdown
5 Capacity terms
5.1 Maximum capacity (MC)
5.2 Dependable capacity
5.3 Available capacity
5.4 Seasonal derating
5.5 Unit derating
5.6 Planned derating
5.7 Unplanned derating
5.8 Installed nameplate capacity
6 Time designations and dates
6.1 Total hours (TH)
6.2 Period hours (PH) or active hours (ACTH)
6.3 Deactivated shutdown hours (DSH)
6.4 Available hours (AH)
6.5 Service hours (SH)
6.6 Reserve shutdown hours (RSH)
6.7 Unavailable hours (UH)
6.8 Planned outage hours (POH)
6.9 Unplanned outage hours (UOH)
6.10 Forced outage hours (FOH)
6.11 Maintenance outage hours (MOH)
6.12 Unit derated hours (UNDH)
6.13 Planned derated hours (PDH)
6.14 Unplanned derated hours (UDH)
6.15 Forced derated hours (FDH)
6.16 Maintenance derated hours (MDH)
6.17 Seasonal derated hours (SDH)
6.18 Equivalent hours (E)
6.19 Service date (SD)
6.20 Deactivation date
6.21 Reactivation date
7 Energy terms
7.1 Actual generation (AAG)
7.2 Maximum generation (MG)
7.3 Available generation (AG)
7.4 Unavailable generation (UG)
7.5 Seasonal unavailable generation (SUG)
7.6 Reserve generation (RG)
7.7 Derated generation (DG)
8 Performance indexes of an individual unit
8.1 Planned outage factor (POF)
8.2 Unplanned outage factor (UOF)
8.3 Forced outage factor (FOF)
8.4 Maintenance outage factor (MOF)
8.5 Unavailability factor (UF)
8.6 Availability factor (AF)
8.7 Service factor (SF)
8.8 Seasonal derating factor (SDF)
8.9 Unit derating factor (UDF)
8.10 Equivalent unavailability factor (EUF)
8.11 Equivalent availability factor (EAF)
8.12 Gross capacity factor (GCF)
8.13 Net capacity factor (NCF)
8.14 Gross output factor (GOF)
8.15 Net output factor (NOF)
8.16 Forced outage rate (FOR)
8.17 Equivalent forced outage rate (EFOR)
8.18 Equivalent planned outage factor (EPOF)
8.19 Equivalent unplanned outage factor (EUOF)
8.20 Equivalent forced outage factor (EFOF)
8.21 Equivalent maintenance outage factor (EMOF)
8.22 Mean service time to outage
8.23 Mean outage duration
8.24 Starting reliability (SR)
8.25 Cycling rate (CR) or average run time (ART)
9 Unweighted (time-based) calculations for group performance
indexes
9.1 Planned outage factor (POF)
9.2 Unplanned outage factor (UOF)
9.3 Forced outage factor (FOF)
9.4 Maintenance outage factor (MOF)
9.5 Unavailability factor (UF)
9.6 Availability factor (AF)
9.7 Service factor (SF)
9.8 Seasonal derating factor (SDF)
9.9 Unit derating factor (UDF)
9.10 Equivalent unavailability factor (EUF)
9.11 Equivalent availability factor (EAF)
9.12 Gross capacity factor (GCF)
9.13 Net capacity factor (NCF)
9.14 Gross output factor (GOF)
9.15 Net output factor (NOF)
9.16 Forced outage rate (FOR)
9.17 Equivalent forced outage rate (EFOR)
9.18 Equivalent planned outage factor (EPOF)
9.19 Equivalent unplanned outage factor (EUOF)
9.20 Equivalent forced outage factor (EFOF)
9.21 Equivalent maintenance outage factor (EMOF)
9.22 Starting reliability (SR)
9.23 Cycling rate (CR) or average run time (ART)
10 Capacity-weighted calculations for group performance indexes
10.1 Weighted planned outage factor (WPOF)
10.2 Weighted unplanned outage factor (WUOF)
10.3 Weighted forced outage factor (WFOF)
10.4 Weighted maintenance outage factor (WMOF)
10.5 Weighted unavailability factor (WUF)
10.6 Weighted availability factor (WAF)
10.7 Weighted service factor (WSF)
10.8 Weighted seasonal derating factor (WSDF)
10.9 Weighted unit derating factor (WUDF)
10.10 Weighted equivalent unavailability factor (WEUF)
10.11 Weighted equivalent availability factor (WEAF)
10.12 Gross capacity factor (GCF)
10.13 Net capacity factor (NCF)
10.14 Gross output factor (GOF)
10.15 Net output factor (NOF)
10.16 Weighted forced outage rate (WFOR)
10.17 Weighted equivalent forced outage rate (WEFOR)
10.18 Weighted equivalent planned outage factor (WEPOF)
10.19 Weighted equivalent unplanned outage factor (WEUOF)
10.20 Weighted equivalent forced outage factor (WEFOF)
10.21 Weighted equivalent maintenance outage factor (WEMOF)
Annex A (informative) Correlation between unit state and capacity
derating definitions
Annex B (informative) Transitions between active states
Annex C (informative) Relationships between period-hour-based
performance indexes
Annex D (informative) Outside plant management control
Annex E (informative) Glossary of terms and abbreviations
Annex F (informative) Pooling methodologies for EFOR[d]
F.1 Unweighted pooling
F.2 Capacity-weighted pooling
Annex G (informative) Limiting conditions for forced outage indexes
Annex H (informative) Bibliography
This document standardizes terminology and indexes for reporting electric generating unit reliability, availability, and productivity performance measures while recognizing the power industry's needs, including marketplace competition.
Committee |
Analytic Methods for Power Systems
|
DevelopmentNote |
Supersedes IEEE DRAFT 762. (03/2007)
|
DocumentType |
Standard
|
ISBN |
978-0-7381-5226-4
|
Pages |
78
|
PublisherName |
Institute of Electrical & Electronics Engineers
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
IEEE 1240-2000 | IEEE Guide for the Evaluation of the Reliability of HVDC Converter Stations |
MIL-HDBK-470 Revision A:1997 | Designing and Developing Maintainable Products and Systems, Volume I |
CLC/TS 61400-26-3:2017 | Wind energy generation systems - Part 26-3: Availability for wind power stations |
IEEE DRAFT 1147 : D8 2005 | GUIDE FOR THE REHABILITATION OF HYDROELECTRIC POWER PLANTS |
14/30244780 DC : 0 | BS ISO 19859 - GAS TURBINE APPLICATIONS - REQUIREMENTS FOR POWER GENERATION |
CLC/TS 61400-26-1:2017 | Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems |
PD CLC/TS 61400-26-2:2017 | Wind turbines Production-based availability for wind turbines |
ISO 19859:2016 | Gas turbine applications Requirements for power generation |
IEC TS 61400-26-2:2014 | Wind turbines - Part 26-2: Production-based availability for wind turbines |
CLC/TS 61400-26-2:2017 | Wind turbines - Part 26-2: Production-based availability for wind turbines |
PD CLC/TS 61400-26-1:2017 | Wind turbines Time-based availability for wind turbine generating systems |
BS PD IEC TS 61400-26-2 : 2014 | WIND TURBINES - PART 26-2: PRODUCTION-BASED AVAILABILITY FOR WIND TURBINES |
NF ISO 19859 : 2016 | GAS TURBINE APPLICATIONS - REQUIREMENTS FOR POWER GENERATION |
IEC TS 61400-26-1:2011 | Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems |
S.R. CLC/TS 61400-26-1:2017 | WIND TURBINES - PART 26-1: TIME-BASED AVAILABILITY FOR WIND TURBINE GENERATING SYSTEMS |
IEEE 1147-2005 | IEEE Guide for the Rehabilitation of Hydroelectric Power Plants |
BS ISO 19859:2016 | Gas turbine applications. Requirements for power generation |
IEC TS 61400-26-3:2016 | Wind energy generation systems - Part 26-3: Availability for wind power stations |
PD CLC/TS 61400-26-3:2017 | Wind energy generation systems Availability for wind power stations |
DD IEC TS 61400-26-1 : 2011 | WIND TURBINES - PART 26-1: TIME-BASED AVAILABILITY FOR WIND TURBINE GENERATING SYSTEMS |
PD IEC/TS 61400-26-3:2016 | Wind energy generation systems Availability for wind power stations |
S.R. CLC/TS 61400-26-2:2017 | WIND TURBINES - PART 26-2: PRODUCTION-BASED AVAILABILITY FOR WIND TURBINES |
S.R. CLC/TS 61400-26-3:2017 | WIND ENERGY GENERATION SYSTEMS - PART 26-3: AVAILABILITY FOR WIND POWER STATIONS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.