• Shopping Cart
    There are no items in your cart

IEC 62270:2013

Current

Current

The latest, up-to-date edition.

Guide for computer-based control for hydroelectric power plant automation

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English - French

Published date

09-16-2013

US$400.00
Excluding Tax where applicable

FOREWORD
1 Overview
2 Terms and definitions
3 System architecture
4 Control Functions
5 Data acquisition and processing
6 Communications and data bases
7 User and plant interfaces
8 System performance
9 System backup capabilities
10 Site integration and support systems
11 Recommended test and acceptance criteria
12 System management
Annex A (informative) - Bibliography
Annex B (informative) - Legacy control systems
Annex C (informative) - IEEE list of participants

IEC 62270:2013 addresses the application, design concepts, and implementation of computer-based control systems for hydroelectric plant automation. It addresses functional capabilities, performance requirements, interface requirements, hardware considerations, and operator training. It includes recommendations for system testing and acceptance. The electrical protective system (generator and step-up transformer) is beyond the scope of this guide. This second edition cancels and replaces the first edition published in 2004. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition:
- update of system architecture aspects, with different process control system configurations;
- update of communications, user and plant interfaces aspects;
- suppression of case studies, because of the quickness of evolution of the technology;
- complete review of the bibliography, making mention of many IEC and IEEE standards as new references and addition of a new informative Annex B on legacy control systems. This publication is published as an IEC/IEEE Dual Logo standard. Key words: Hydroelectric, Automation, Computer-Based Control

DevelopmentNote
Also numbered as IEEE 1249. Stability date: 2023. (11/2017)
DocumentType
Standard
Pages
148
PublisherName
International Electrotechnical Committee
Status
Current
Supersedes

Standards Relationship
NEN EN IEC 62270 : 2004 Identical
I.S. EN 62270:2004 Identical
EN 62270:2004 Identical
CEI EN 62270 : 2005 Identical
PN EN 62270 : 2006 Identical
UNE-EN 62270:2005 Identical
BS EN 62270:2004 Identical
NF EN 62270 : 2004 Identical

DD IEC/TS 62558:2011 Ultrasonics. Real-time pulse-echo scanners. Phantom with cylindrical, artificial cysts in tissue-mimicking material and method for evaluation and periodic testing of 3D-distributions of void-detectability ratio (VDR)
IEC TR 61850-7-510:2012 Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines
PD IEC/TR 61850-7-510:2012 Communication networks and systems for power utility automation Basic communication structure. Hydroelectric power plants. Modelling concepts and guidelines
09/30212527 DC : 0 BS EN 61850-7-410 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL
IEC TS 62558:2011 Ultrasonics - Real-time pulse-echo scanners - Phantom with cylindrical, artificial cysts in tissue-mimicking material and method for evaluation and periodic testing of 3D-distributions of void-detectability ratio (VDR)
VDI 4620:2016-12 Hydroelectric installations - Technology and design
BS EN 61850-7-410 : 2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL
IEC 61850-7-410:2012+AMD1:2015 CSV Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control
I.S. EN 61850-7-410:2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL
EN 61850-7-410:2013/A1:2016 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL (IEC 61850-7-410:2012/A1:2015)

IEC 60050-351:2013 International Electrotechnical Vocabulary (IEV) - Part 351: Control technology
IEC 60870-5-102:1996 Telecontrol equipment and systems - Part 5: Transmission protocols - Section 102: Companion standard for the transmission of integrated totals in electric power systems
IEEE C37.90-2005 IEEE Standard for Relays and Relay Systems Associated with Electric Power Apparatus
IEEE C37.231-2006 IEEE Recommended Practice for Microprocessor-Based Protection Equipment Firmware Control
IEC 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models
IEEE 1615-2007 IEEE Recommended Practice for Network Communication in Electric Power Substations
IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
IEEE 610.12-1990 IEEE Standard Glossary of Software Engineering Terminology
IEC 61000-4-1:2006 Electromagnetic compatibility (EMC) - Part 4-1: Testing and measurement techniques - Overview of IEC 61000-4 series
IEC 61131-3:2013 Programmable controllers - Part 3: Programming languages
IEC 61850-7-410:2012+AMD1:2015 CSV Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control
IEC 61000-6-2:2016 Electromagnetic compatibility (EMC) - Part 6-2: Generic standards - Immunity standard for industrial environments
IEC 61131-1:2003 Programmable controllers - Part 1: General information
IEC 60870-2-1:1995 Telecontrol equipment and systems - Part 2: Operating conditions - Section 1: Power supply and electromagnetic compatibility
IEC 61850-6:2009 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
IEEE 802.3-2012 IEEE Standard for Ethernet
IEC 60870-5-104:2006+AMD1:2016 CSV Telecontrol equipment and systems - Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standardtransport profiles
IEC 60870-5-103:1997 Telecontrol equipment and systems - Part 5-103: Transmission protocols - Companion standard for the informative interface of protection equipment
IEC 60870-2-2:1996 Telecontrol equipment and systems - Part 2: Operating conditions -Section 2: Environmental conditions (climatic, mechanical and othernon electrical influences)
IEEE 1248-1998 IEEE Guide for the Commissioning of Electrical Systems in Hydroelectric Power Plants
IEC 60870-3:1989 Telecontrol equipment and systems. Part 3: Interfaces (electrical characteristics)
ISO/IEC 8802-3:2000 Information technology Telecommunications and information exchange between systems Local and metropolitan area networks Specific requirements Part 3: Carrier sense multiple access with collision detection (CSMA/CD) access method and physical layer specifications
IEC 60308:2005 Hydraulic turbines - Testing of control systems
IEC 60870-4:1990 Telecontrol equipment and systems. Part 4: Performance requirements
IEC 60870-1-2:1989 Telecontrol equipment and systems. Part 1: General considerations. Section Two: Guide for specifications
IEC 60870-5-101:2003+AMD1:2015 CSV Telecontrol equipment and systems - Part 5-101: Transmissionprotocols - Companion standard for basic telecontrol tasks
IEC 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
IEC 62256:2017 Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
IEC 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
IEEE 1207-2011 IEEE Guide for the Application of Turbine Governing Systems for Hydroelectric Generating Units
IEC 61850-4:2011 Communication networks and systems for power utility automation - Part 4: System and project management
IEC 61000-4-3:2006+AMD1:2007+AMD2:2010 CSV Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity test
IEEE C37.90.1-2012 IEEE Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus
IEC 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
IEC 61850-7-3:2010 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes
IEC 61131-2:2017 Industrial-process measurement and control - Programmable controllers - Part 2: Equipment requirements and tests
IEC 61362:2012 Guide to specification of hydraulic turbine governing systems
IEC 61850-10:2012 Communication networks and systems for power utility automation - Part 10: Conformance testing
IEEE 946-2004 IEEE Recommended Practice for the Design of DC Auxiliary Power Systems for Generating Systems
IEEE 485-2010 IEEE Recommended Practice for Sizing Lead-Acid Batteries for Stationary Applications
IEC 61850-3:2013 Communication networks and systems for power utility automation - Part 3: General requirements

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.