I.S. EN 45510-4-10:2000
Current
The latest, up-to-date edition.
GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - BOILER AUXILIARIES - FLUE GAS DENITRIFICATION (DE-NOX) PLANT
Hardcopy , PDF
English
01-01-2000
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
Foreword
1 Scope
2 Normative references
3 Definitions
3.1 Organizational terms
3.2 Technical terms
3.3 General terms
4 Brief overall project description
4.1 Role and organization of purchaser
4.2 Site location
4.3 Equipment task
4.4 Equipment to be purchased
4.5 Control and instrumentation
4.6 Electrical supplies and other services
4.7 Other interfaces
4.8 Project programme
4.9 Equipment identification systems
5 Extent of supply
6 Terminal points
7 Operational requirements
7.1 Operating environment
7.2 Manning levels
7.3 Normal operation
7.4 Operating hoursnts
7.5 Start-up and shut-down
7.6 Abnormal conditions
7.7 Further operational requirements
8 Life expectancy
8.1 Design life
8.2 Components requiring periodic maintenance
9 Performance requirements
9.1 Duty
9.2 Performance
9.3 Equipment margins
9.4 Availability
9.5 Levels of component redundancy
9.6 Further performance requirements
10 Design and fabrication
10.1 Specific equipment features
10.2 Design justification
10.3 Material selection
10.4 Safety
10.5 Interchangeability
10.6 Fabrication methods
11 Maintenance requirements
11.1 Planned maintenance
11.2 Personnel safety
11.3 Requirements for access
11.4 Lifting requirements
11.5 Special tools
11.6 Test equipment
11.7 Spare parts strategy
11.8 Special precautions
12 Technical documentation requirements
12.1 Tender documentation
12.2 Contract documentation
13 Applicable legislation, regulations, standards and
further requirements
13.1 Legislation and regulations
13.2 Standards
13.3 Further requirements
14 Evaluation criteria
14.1 General
14.2 Technical criteria
15 Quality measures
15.1 General
15.2 Approvals procedure
15.3 Inspection requirements
15.4 Non-conformity
16 Site factors
16.1 Access
16.2 Facilities
16.3 Site specific requirements
17 Verification of specified performance
17.1 General
17.2 Works tests
17.3 Test during installation and commissioning
17.4 Technical conditions for trial run
17.5 Functional and performance tests
Bibliography
Provides guidance on writing the technical specification for the procurement of processes and equipment for the removal of nitrogen oxides from the flue gas of steam generating plant for use in electricity generating stations.
DocumentType |
Standard
|
Pages |
28
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Current
|
Standards | Relationship |
UNE-EN 45510-4-10:2000 | Identical |
EN 45510-4-10 : 1999 | Identical |
NS EN 45510-4-10 : 1ED 2000 | Identical |
NEN EN 45510-4-10 : 1999 | Identical |
BS EN 45510-4-10:2000 | Identical |
DIN EN 45510-4-10:1999-12 | Identical |
SN EN 45510-4-10 : 1999 | Identical |
EN 45510-4-10:1999 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.