I.S. EN 14725:2004
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
View Superseded by
SPACE ENGINEERING - VERIFICATION
Hardcopy , PDF
05-31-2019
English
04-16-2004
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
Foreword
1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
3.1 Terms and definitions
3.2 Abbreviated terms
4 Verification process
4.1 Introduction
4.2 Verification objectives
4.3 Verification process logic
4.3.1 General
4.3.2 Verification process flow
4.3.3 Verification approach
4.3.4 Verification close-out
4.4 Verification methods
4.4.1 General
4.4.2 Test
4.4.3 Analysis
4.4.4 Review-of-design
4.4.5 Inspection
4.5 Verification levels
4.6 Verification stages
4.6.1 General
4.6.2 Qualification
4.6.3 Acceptance
4.6.4 Pre-launch
4.6.5 In-orbit
4.6.6 Post-landing
5 Verification strategy
5.1 Preparation
5.2 Requirements classification
5.2.1 Requirements identification
5.2.2 Requirements documentation
5.2.3 Requirement characteristics
5.2.4 Requirement criticality
5.2.5 Requirements not to be tracked
5.2.6 Requirement categories
5.2.7 Requirements traceability
5.2.8 Verification matrix
5.3 Selection of methods, levels and stages of
verification
5.3.1 General
5.3.2 Selection of verification method
5.3.3 Selection of verification level
5.3.4 Selection of verification stages
5.3.5 Additional rules for selection
5.4 Selection of models
5.4.1 Number and type of models
5.4.2 Model philosophy definition
5.4.3 Model applicability
5.5 Verification by test
5.5.1 General
5.5.2 Test programme definition
5.5.3 Integration flow
5.5.4 Integration tests
5.5.5 Re-integration tests
5.5.6 Test versus verification stages
5.5.7 Test versus verification levels
5.5.8 Test matrices
5.6 Verification by analysis
5.6.1 General
5.6.2 Analysis programme definition
5.6.3 Verification analysis criteria
5.6.4 Analysis versus verification stages
5.6.5 Analysis versus verification levels
5.6.6 Analysis matrices
5.7 Verification by review-of-design
5.7.1 General
5.7.2 Review-of-design programme definition
5.7.3 Review-of-design versus verification stages
5.7.4 Review-of-design versus verification levels
5.7.5 Review-of-design matrices
5.8 Verification by inspection
5.8.1 General
5.8.2 Inspection programme definition
5.8.3 Inspection versus verification stages
5.8.4 Inspection versus verification levels
5.8.5 Inspection matrix
5.9 Re-flight verification
5.9.1 Re-flight verification programme
5.9.2 Re-flight verification activities
6 Verification implementation
6.1 General aspects
6.2 Verification
6.2.1 Assignment of responsibility
6.2.2 Verification control board (VCB)
6.2.3 Test readiness review (TRR) and post test
review (PTR)
6.2.4 Nonconformance review board (NRB)
6.2.5 Verification responsibilities documentation
6.3 Verification planning
6.3.1 Establishment of planning activity
6.3.2 Verification planning content
6.3.3 Phasing with project life cycle
6.3.4 Verification planning documentation
6.4 Verification tools
6.4.1 General
6.4.2 Tools validation
6.4.3 Ground support equipment (GSE)
6.4.4 Software validation facility (SVF)
6.4.5 Simulators
6.4.6 Software tools for verification by analysis
6.4.7 Integration and test facilities and equipment
6.5 Verification execution and control
6.5.1 Monitoring
6.5.2 Verification database
6.5.3 Re-verification
6.5.4 Verification execution evidence
6.5.5 Verification close-out
6.5.6 Test effectiveness
6.5.7 Verification lessons learnt
6.6 Verification documentation
6.6.1 Documentation steps
6.6.2 Verification documents
6.6.3 Other documents
Annex A (normative) Verification documents
Annex B (informative) Verification guidelines
B.1 Model and model philosophy definition guidelines
B.1.1 Introduction
B.1.2 Models description
B.1.3 Model philosophies description
B.1.4 Hardware matrix
B.2 Specific tailoring guidelines
B.3 Re-verification review guidelines for re-flight
B.4 Verification activities guidelines
B.4.1 General
B.4.2 Phase A
B.4.3 Phase B
B.4.4 Phase C
B.4.5 Phase D
B.4.6 Phase E
B.4.7 Phase F
B.4.8 Verification flow
B.5 Typical verification team responsibility
B.5.1 Team responsibility
B.5.2 Relationship with engineering
B.5.3 Relationship with product assurance &
quality control
B.5.4 Relationship with project management
Annex C (normative) Verification matrix - Document
requirements definition (DRD)
C.1 Introduction
C.2 Scope and applicability
C.2.1 Scope
C.2.2 Applicability
C.3 References
C.3.1 Glossary and dictionary
C.3.2 Source document
C.4 Definitions, abbreviations and symbols
C.4.1 Definitions
C.4.2 Abbreviations
C.5 Description and purpose
C.6 Application and interrelationship
C.7 Verification matrix preliminary elements
C.7.1 Title
C.7.2 Title page
C.7.3 Contents list
C.7.4 Foreword
C.7.5 Introduction
C.8 Content
C.8.1 Scope and applicability
C.8.2 References
C.8.3 Definitions and abbreviations
C.8.4 Verification entries
Annex D (normative) Assembly, integration and
verification (AIV) plan - Document requirements
definition (DRD)
D.1 Introduction
D.2 Scope and applicability
D.2.1 Scope
D.2.2 Applicability
D.3 References
D.3.1 Glossary and dictionary
D.3.2 Source document
D.4 Definitions, abbreviations and symbols
D.4.1 Definitions
D.4.2 Abbreviations
D.5 Description and purpose
D.6 Application and interrelationship
D.7 AIV plan preliminary elements
D.7.1 Title
D.7.2 Title Page
D.7.3 Contents List
D.7.4 Foreword
D.7.5 Introduction
D.8 Content
D.8.1 Scope and applicability
D.8.2 References
D.8.3 Definitions and abbreviations
D.8.4 Verification subject
D.8.5 Verification approach
D.8.6 Model philosophy
D.8.7 Verification strategy
D.8.8 Assembly integration and verification
programme
D.8.9 AIV tools
D.8.10 Verification control methodology
D.8.11 Documentation
D.8.12 Organization and management
Annex E (normative) Verification control document
(VCD) - Document requirements definition (DRD)
E.1 Introduction
E.2 Scope and applicability
E.2.1 Scope
E.2.2 Applicability
E.3 References
E.3.1 Glossary and dictionary
E.3.2 Source Document
E.4 Definitions, abbreviations and symbols
E.4.1 Definitions
E.4.2 Abbreviations
E.5 Description and purpose
E.6 Application and Interrelationship
E.7 VCD preliminary elements
E.7.1 Title
E.7.2 Title page
E.7.3 Contents list
E.7.4 Foreword
E.7.5 Introduction
E.8 Content
E.8.1 Scope and applicability
E.8.2 References
E.8.3 Definitions and abbreviations
E.8.4 Verification subject
E.8.5 Verification control document sheets
Annex F (normative) Test specification - Document
requirements definition (DRD)
F.1 Introduction
F.2 Scope and applicability
F.2.1 Scope
F.2.2 Applicability
F.3 References
F.3.1 Glossary and dictionary
F.3.2 Source Document
F.4 Definitions, abbreviations and symbols
F.4.1 Definitions
F.4.2 Abbreviations
F.5 Description and purpose
F.6 Application and interrelationship
F.7 Test specification preliminary elements
F.7.1 Title
F.7.2 Title page
F.7.3 Contents list
F.7.4 Foreword
F.7.5 Introduction
F.8 Content
F.8.1 Scope and applicability
F.8.2 References
F.8.3 Definitions and abbreviations
F.8.4 Requirements to be verified
F.8.5 Test approach
F.8.6 Test description
F.8.7 Test facility
F.8.8 Test sequence
F.8.9 Pass/fail criteria
F.8.10 Test documentation
F.8.11 Test organization
Annex G (normative) Test procedure - Document
requirements definition (DRD)
G.1 Introduction
G.2 Scope and applicability
G.2.1 Scope
G.2.2 Applicability
G.3 References
G.3.1 Glossary and dictionary
G.3.2 Source document
G.4 Definitions, abbreviations and symbols
G.4.1 Definitions
G.4.2 Abbreviations
G.5 Description and purpose
G.6 Application and interrelationship
G.7 Test procedure preliminary elements
G.7.1 Title
G.7.2 Title page
G.7.3 Contents list
G.7.4 Foreword
G.7.5 Introduction
G.8 Content
G.8.1 Scope and applicability
G.8.2 References
G.8.3 Definitions and abbreviations
G.8.4 Requirements to be verified
G.8.5 Test article
G.8.6 Test set-up
G.8.7 GSE required
G.8.8 Test equipment and instrumentation
G.8.9 Test facility
G.8.10 Test conditions
G.8.11 Documentation required
G.8.12 Participants
G.8.13 Test constraints and operations
G.8.14 Step-by-step procedure
Annex H (normative) Test report - Document
requirements definition (DRD)
H.1 Introduction
H.2 Scope and applicability
H.2.1 Scope
H.2.2 Applicability
H.3 References
H.3.1 Glossary and dictionary
H.3.2 Source document
H.4 Definitions, abbreviations and symbols
H.4.1 Definitions
H.4.2 Abbreviations
H.5 Description and purpose
H.6 Application and interrelationship
H.7 Test report preliminary elements
H.7.1 Title
H.7.2 Title page
H.7.3 Contents list
H.7.4 Foreword
H.7.5 Introduction
H.8 Content
H.8.1 Scope and applicability
H.8.2 References
H.8.3 Definitions and abbreviations
H.8.4 Test results
H.8.5 Anomalies
H.8.6 Conclusions
Annex I (normative) Analysis report - Document
requirements definition (DRD)
I.1 Introduction
I.2 Scope and applicability
I.2.1 Scope
I.2.2 Applicability
I.3 References
I.3.1 Glossary and dictionary
I.3.2 Source document
I.4 Definitions, abbreviations and symbols
I.4.1 Definitions
I.4.2 Abbreviations
I.5 Description and purpose
I.6 Application and interrelationship
I.7 Analysis report preliminary elements
I.7.1 Title
I.7.2 Title page
I.7.3 Contents list
I.7.4 Foreword
I.7.5 Introduction
I.8 Content
I.8.1 Scope and applicability
I.8.2 References
I.8.3 Definitions and abbreviations
I.8.4 Analysis approach
I.8.5 Assumptions
I.8.6 Analysis technique description
I.8.7 Analysis results
I.8.8 Conclusions
Annex J (normative) Review-of-design report - Document
requirements definition (DRD)
J.1 Introduction
J.2 Scope and applicability
J.2.1 Scope
J.2.2 Applicability
J.3 References
J.3.1 Glossary and dictionary
J.3.2 Source document
J.4 Definitions, abbreviations and symbols
J.4.1 Definitions
J.4.2 Abbreviations
J.5 Description and purpose
J.6 Application and interrelationship
J.7 ROD report preliminary elements
J.7.1 Title
J.7.2 Title page
J.7.3 Contents list
J.7.4 Foreword
J.7.5 Introduction
J.8 Content
J.8.1 Scope and applicability
J.8.2 References
J.8.3 Definitions and abbreviations
J.8.4 ROD summary
J.8.5 Conclusions
Annex K (normative) Inspection report - Document
requirements definition (DRD)
K.1 Introduction
K.2 Scope and applicability
K.2.1 Scope
K.2.2 Applicability
K.3 References
K.3.1 Glossary and dictionary
K.3.2 Source document
K.4 Definitions, abbreviations and symbols
K.4.1 Definitions
K.4.2 Abbreviations
K.5 Description and purpose
K.6 Application and interrelationship
K.7 Inspection report preliminary elements
K.7.1 Title
K.7.2 Title page
K.7.3 Contents list
K.7.4 Foreword
K.7.5 Introduction
K.8 Content
K.8.1 Scope and applicability
K.8.2 References
K.8.3 Definitions and abbreviations
K.8.4 Inspection summary
K.8.5 Inspected item
K.8.6 Conclusions
Annex L (normative) Verification report - Document
requirements definition (DRD)
L.1 Introduction
L.2 Scope and applicability
L.2.1 Scope
L.2.2 Applicability
L.3 References
L.3.1 Glossary and dictionary
L.3.2 Source document
L.4 Definitions, abbreviations and symbols
L.4.1 Definitions
L.4.2 Abbreviations
L.5 Description and purpose
L.6 Application and interrelationship
L.7 Verification report preliminary elements
L.7.1 Title
L.7.2 Title page
L.7.3 Contents list
L.7.4 Foreword
L.7.5 Introduction
L.8 Content
L.8.1 Scope and applicability
L.8.2 References
L.8.3 Definitions and abbreviations
L.8.4 Verification results
L.8.5 Conclusions
Bibliography
Covers the requirements for the verification of a space system product.
DocumentType |
Standard
|
Pages |
150
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Withdrawn
|
SupersededBy |
Standards | Relationship |
UNI EN 14725 : 2004 | Identical |
NS EN 14725 : 1ED 2004 | Identical |
DIN EN 14725:2005-01 | Identical |
NBN EN 14725 : 2004 | Identical |
EN 14725:2003 | Identical |
BS EN 14725:2003 | Identical |
SN EN 14725 : 2004 | Identical |
NF EN 14725 : 2004 | Identical |
NEN EN 14725 : 2004 | Identical |
EN 13290-1:1999 | Space project management - General requirements - Part 1: Policy and principles |
EN 14097:2001 | Space product assurance - Nonconformance control system |
EN 13701:2001 | Space systems - Glossary of terms |
EN 13290-4:2001 | Space project management - General requirements - Part 4: Project phasing and planning |
EN ISO 14620-1:2002 | Space systems - Safety requirements - Part 1: System safety (ISO 14620-1:2002) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.