EN ISO 2560:2009
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Welding consumables - Covered electrodes for manual metal arc welding of non-alloy and fine grain steels - Classification (ISO 2560:2009)
09-26-2020
10-15-2009
Foreword
Introduction
1 Scope
2 Normative references
3 Classification
4 Symbols and requirements
5 Mechanical tests
6 Chemical analysis
7 Fillet weld test
8 Rounding procedure
9 Retests
10 Technical delivery conditions
11 Examples of designation
Annex A (informative) - Classification systems
Annex B (informative) - Description of types of electrode
covering - Classification by yield
strength and 47 J impact energy
Annex C (informative) - Description of types of electrode
covering - Classification by tensile
strength and 27 J impact energy
Annex D (informative) - Notes on diffusible hydrogen and
the avoidance of cold cracking
Bibliography
ISO 2560:2009 specifies requirements for classification of covered electrodes and deposited metal in the as-welded condition and in the post-weld heat-treated condition for manual metal arc welding of non-alloy and fine grain steels with a minimum yield strength of up to 500 MPa or a minimum tensile strength of up to 570 MPa.ISO 2560:2009 is a combined specification providing for classification utilizing a system based upon the yield strength and the average impact energy of 47 J of all-weld metal, or utilizing a system based upon the tensile strength and the average impact energy of 27 J of all-weld metal.Paragraphs and tables which carry the suffix letter “A” are applicable only to covered electrodes classified to the system based upon the yield strength and the average impact energy of 47 J of all‑weld metal in ISO 2560:2009.Paragraphs and tables which carry the suffix letter “B” are applicable only to covered electrodes classified to the system based upon the tensile strength and the average impact energy of 27 J of all‑weld metal in ISO 2560:2009.Paragraphs and tables which do not have either the suffix letter “A” or the suffix letter “B” are applicable to all covered electrodes classified in ISO 2560:2009.
Committee |
CEN/TC 121
|
DevelopmentNote |
Supersedes EN 499. (01/2006)
|
DocumentType |
Standard
|
PublisherName |
Comite Europeen de Normalisation
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
ISO 2560:2009 | Identical |
NBN EN ISO 2560 : 2010 | Identical |
NEN EN ISO 2560 : 2009 | Identical |
NS EN ISO 2560 : 2009 | Identical |
I.S. EN ISO 2560:2009 | Identical |
PN EN ISO 2560 : OCT 2010 | Identical |
SN EN ISO 2560 : 2010 | Identical |
UNI EN ISO 2560 : 2010 | Identical |
SS-EN ISO 2560:2009 | Identical |
UNE-EN ISO 2560:2010 | Identical |
BS EN ISO 2560:2009 | Identical |
NF EN ISO 2560 : 2009 | Identical |
DIN EN ISO 2560:2010-03 | Identical |
ONORM EN ISO 2560 : 2010 | Identical |
14/30312130 DC : 0 | BS EN 13479 - WELDING CONSUMABLES - GENERAL PRODUCT STANDARD FOR FILLER METALS AND FLUXES FOR FUSION WELDING OF METALLIC MATERIALS |
I.S. EN 287-1:2011 | QUALIFICATION TEST OF WELDERS - FUSION WELDING - PART 1: STEELS |
PREN 14199 : DRAFT 2013 | EXECUTION OF SPECIAL GEOTECHNICAL WORK - MICROPILES |
UNI EN 4632-003 : 2011 | AEROSPACE SERIES - WELDABILITY AND BRAZEABILITY OF MATERIALS IN AEROSPACE CONSTRUCTIONS - PART 003: WELDING AND BRAZING OF HOMOGENEOUS ASSEMBLIES OF UNALLOYED AND LOW ALLOY STEELS |
09/30211880 DC : 0 | BS EN 12732 - GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
13/30280743 DC : 0 | BS EN 14199 - EXECUTION OF SPECIAL GEOTECHNICAL WORK - MICROPILES |
PREN 13479 : DRAFT 2014 | WELDING CONSUMABLES - GENERAL PRODUCT STANDARD FOR FILLER METALS AND FLUXES FOR FUSION WELDING OF METALLIC MATERIALS |
I.S. EN 287-6:2010 | QUALIFICATION TEST OF WELDERS - FUSION WELDING - PART 6: CAST IRON |
I.S. EN 16725:2016 | RAILWAY APPLICATIONS - TRACK - RESTORATION AND REPAIR OF MANGANESE CROSSINGS |
NF EN 12542 : 2011 | LPG EQUIPMENT AND ACCESSORIES - STATIC WELDED STEEL CYLINDRICAL TANKS, SERIALLY PRODUCED FOR THE STORAGE OF LIQUEFIED PETROLEUM GAS (LPG) HAVING A VOLUME NOT GREATER THAN 13 M[3] - DESIGN AND MANUFACTURE |
DIN EN 12732:2014-07 | Gas infrastructure - Welding steel pipework - Functional requirements (includes Amendment A1:2014) |
UNE-EN 12542:2011 | LPG equipment and accessories - Static welded steel cylindrical tanks, serially produced for the storage of Liquefied Petroleum Gas (LPG) having a volume not greater than 13 m³ - Design and manufacture |
DIN EN 14893:2014-09 | LPG EQUIPMENT AND ACCESSORIES - TRANSPORTABLE LIQUEFIED PETROLEUM GAS (LPG) WELDED STEEL PRESSURE DRUMS WITH A CAPACITY BETWEEN 150 LITRES AND 1000 LITRES |
BS EN 12699:2015 | Execution of special geotechnical works. Displacement piles |
I.S. EN 12699:2015 | EXECUTION OF SPECIAL GEOTECHNICAL WORKS - DISPLACEMENT PILES |
I.S. EN 14199:2015 | EXECUTION OF SPECIAL GEOTECHNICAL WORKS - MICROPILES |
EN 12952-2:2011 | Water-tube boilers and auxiliary installations - Part 2: Materials for pressure parts of boilers and accessories |
DIN EN 1090-2:2011-10 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
EN 13479:2017 | Welding consumables - General product standard for filler metals and fluxes for fusion welding of metallic materials |
UNI EN 12732 : 2014 | GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
13/30248693 DC : 0 | BS EN 14893 - LPG EQUIPMENT AND ACCESSORIES - TRANSPORTABLE LIQUEFIED PETROLEUM GAS (LPG) WELDED STEEL PRESSURE DRUMS WITH A CAPACITY BETWEEN 150 LITRES AND 1000 LITRES |
16/30336476 DC : 0 | BS EN 287-6 - QUALIFICATION TEST OF WELDERS - FUSION WELDING - PART 6: CAST IRON |
PREN 12732 : DRAFT 2009 | GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
PREN 1090-2 : DRAFT 2015 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
16/30336473 DC : 0 | BS EN 1011-8 - WELDING - RECOMMENDATIONS FOR WELDING OF METALLIC MATERIALS - PART 8: WELDING OF CAST IRONS |
DIN EN 14893 E : 2014 | LPG EQUIPMENT AND ACCESSORIES - TRANSPORTABLE LIQUEFIED PETROLEUM GAS (LPG) WELDED STEEL PRESSURE DRUMS WITH A CAPACITY BETWEEN 150 LITRES AND 1000 LITRES |
I.S. EN 1011-8:2004 | WELDING - RECOMMENDATIONS FOR WELDING OF METALLIC MATERIALS - PART 8: WELDING OF CAST IRONS |
DIN EN 1090-2:2015-07 (Draft) | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
BS EN 1090-2 : 2008 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
UNI EN 1090-2 : 2011 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
DIN EN 12699:2015-07 | EXECUTION OF SPECIAL GEOTECHNICAL WORKS - DISPLACEMENT PILES |
DIN EN 14199:2015-07 | EXECUTION OF SPECIAL GEOTECHNICAL WORK - MICROPILES |
UNE-EN 13479:2018 | Welding consumables - General product standard for filler metals and fluxes for fusion welding of metallic materials |
BS EN 287-1:2011 | Qualification test of welders. Fusion welding Steels |
I.S. EN 12542:2010 | LPG EQUIPMENT AND ACCESSORIES - STATIC WELDED STEEL CYLINDRICAL TANKS, SERIALLY PRODUCED FOR THE STORAGE OF LIQUEFIED PETROLEUM GAS (LPG) HAVING A VOLUME NOT GREATER THAN 13 M[3] - DESIGN AND MANUFACTURE |
DIN EN 12542:2010-12 | LPG EQUIPMENT AND ACCESSORIES - STATIC WELDED STEEL CYLINDRICAL TANKS, SERIALLY PRODUCED FOR THE STORAGE OF LIQUEFIED PETROLEUM GAS (LPG) HAVING A VOLUME NOT GREATER THAN 13 M[3] - DESIGN AND MANUFACTURE |
I.S. EN 12732:2013 | GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
I.S. EN 13479:2017 | WELDING CONSUMABLES - GENERAL PRODUCT STANDARD FOR FILLER METALS AND FLUXES FOR FUSION WELDING OF METALLIC MATERIALS |
I.S. EN 12952-2:2011 | WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 2: MATERIALS FOR PRESSURE PARTS OF BOILERS AND ACCESSORIES |
I.S. EN 14893:2014 | LPG EQUIPMENT AND ACCESSORIES - TRANSPORTABLE LIQUEFIED PETROLEUM GAS (LPG) WELDED STEEL PRESSURE DRUMS WITH A CAPACITY BETWEEN 150 LITRES AND 1000 LITRES |
DIN EN 12732:2000-09 | GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
NF EN 12952-2 : 2011 | WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 2: MATERIALS FOR PRESSURE PARTS OF BOILERS AND ACCESSORIES |
08/30180502 DC : DRAFT JUNE 2008 | BS EN 12542 - LPG EQUIPMENT AND ACCESSORIES - STATIC WELDED STEEL CYLINDRICAL TANKS, SERIALLY PRODUCED FOR THE STORAGE OF LIQUEFIED PETROLEUM GAS (LPG) HAVING A VOLUME NOT GREATER THAN 13 M[3] - DESIGN AND MANUFACTURE |
PREN 1011-8 : DRAFT 2016 | WELDING - RECOMMENDATIONS FOR WELDING OF METALLIC MATERIALS - PART 8: WELDING OF CAST IRONS |
16/30342040 DC : 0 | BS EN 13941-2 - DISTRICT HEATING PIPES - DESIGN AND INSTALLATION OF THERMAL INSULATED BONDED SINGLE AND TWIN PIPE SYSTEMS FOR DIRECTLY BURIED HOT WATER NETWORKS - PART 2: INSTALLATION |
UNE-EN 1090-2:2011 | Execution of steel structures and aluminium structures - Part 2: Technical requirements for steel structures |
PREN 287-6 : DRAFT 2016 | QUALIFICATION TEST OF WELDERS - FUSION WELDING - PART 6: CAST IRON |
PREN 287-1 : DRAFT 2010 | QUALIFICATION TEST OF WELDERS - FUSION WELDING - PART 1: STEELS |
NF EN 4632-003 : 2010 | AEROSPACE SERIES - WELDABILITY AND BRAZEABILITY OF MATERIALS IN AEROSPACE CONSTRUCTIONS - PART 003: WELDING AND BRAZING OF HOMOGENEOUS ASSEMBLIES OF UNALLOYED AND LOW ALLOY STEELS |
KTA 3211.1 : 2015 | PRESSURE AND ACTIVITY RETAINING COMPONENTS OF SYSTEMS OUTSIDE THE PRIMARY CIRCUIT - PART 1: MATERIALS |
PREN 12699 : DRAFT 2013 | EXECUTION OF SPECIAL GEOTECHNICAL WORK - DISPLACEMENT PILES |
PREN 12542 : DRAFT 2016 | LPG EQUIPMENT AND ACCESSORIES - STATIC WELDED STEEL CYLINDRICAL TANKS, SERIALLY PRODUCED FOR THE STORAGE OF LIQUEFIED PETROLEUM GAS (LPG) HAVING A VOLUME NOT GREATER THAN 13 M[3] - DESIGN AND MANUFACTURE |
EN 1090-2:2008+A1:2011 | Execution of steel structures and aluminium structures - Part 2: Technical requirements for steel structures |
DIN EN 287-6:2016-03 (Draft) | QUALIFICATION TEST OF WELDERS - FUSION WELDING - PART 6: CAST IRON |
DIN EN 287-1:2011-11 | QUALIFICATION TEST OF WELDERS - FUSION WELDING - PART 1: STEELS |
UNI EN 12542 : 2010 | LPG EQUIPMENT AND ACCESSORIES - STATIC WELDED STEEL CYLINDRICAL TANKS, SERIALLY PRODUCED FOR THE STORAGE OF LIQUEFIED PETROLEUM GAS (LPG) HAVING A VOLUME NOT GREATER THAN 13 MUE - DESIGN AND MANUFACTURE |
EEMUA 158 : 2014 | CONSTRUCTION SPECIFICATION FOR FIXED OFFSHORE STRUCTURES |
UNE-EN 287-1:2011 | Qualification test of welders - Fusion welding - Part 1: Steels |
EN 12542:2010 | LPG equipment and accessories - Static welded steel cylindrical tanks, serially produced for the storage of Liquefied Petroleum Gas (LPG) having a volume not greater than 13 m³ - Design and manufacture |
UNI EN 12952-2 : 2011 | WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 2: MATERIALS FOR PRESSURE PARTS OF BOILERS AND ACCESSORIES |
UNI EN 14893 : 2014 | LPG EQUIPMENT AND ACCESSORIES - TRANSPORTABLE LIQUEFIED PETROLEUM GAS (LPG) WELDED STEEL PRESSURE DRUMS WITH A CAPACITY BETWEEN 150 LITRES AND 1000 LITRES |
UNI EN 287-1 : 2012 | QUALIFICATION TEST OF WELDERS - FUSION WELDING - PART 1: STEELS |
BS EN 4632-003:2010 | Aerospace series. Weldability and brazeability of materials in aerospace constructions Welding and brazing of homogeneous assemblies of unalloyed and low alloy steels |
BS EN 16725:2016 | Railway applications. Track. Restoration and repair of manganese crossings |
UNI EN 287-6 : 2010 | QUALIFICATION TEST OF WELDERS - FUSION WELDING - PART 6: CAST IRON |
NF EN 1090-2 : 2009 + A1 2011 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
16/30326248 DC : 0 | BS EN 12542 - LPG EQUIPMENT AND ACCESSORIES - STATIC WELDED STEEL CYLINDRICAL TANKS, SERIALLY PRODUCED FOR THE STORAGE OF LIQUEFIED PETROLEUM GAS (LPG) HAVING A VOLUME NOT GREATER THAN 13 M[3] - DESIGN AND MANUFACTURE |
PREN 14893 : DRAFT 2013 | LPG EQUIPMENT AND ACCESSORIES - TRANSPORTABLE LIQUEFIED PETROLEUM GAS (LPG) WELDED STEEL PRESSURE DRUMS WITH A CAPACITY BETWEEN 150 LITRES AND 1000 LITRES |
EN 287-6:2018 | Qualification test of welders - Fusion welding - Part 6: Cast irons |
BS EN 12542:2010 | LPG equipment and accessories. Static welded steel cylindrical tanks, serially produced for the storage of liquefied petroleum gas (LPG) having a volume not greater than 13 m<sup>3</sup>. Design and manufacture |
BS EN 13479:2017 | Welding consumables. General product standard for filler metals and fluxes for fusion welding of metallic materials |
BS EN 1011-8:2004 | Welding. Recommendations for welding of metallic materials Welding of cast irons |
UNE-EN 12952-2:2012 | Water-tube boilers and auxiliary installations - Part 2: Materials for pressure parts of boilers and accessories |
BS EN 12732 : 2013 | GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
UNE-EN 12732:2014+A1:2014 | Gas infrastructure - Welding steel pipework - Functional requirements |
EN 14893:2014 | LPG equipment and accessories - Transportable Liquefied Petroleum Gas (LPG) welded steel pressure drums with a capacity between 150 litres and 1 000 litres |
EN 287-1:2011 | Qualification test of welders - Fusion welding - Part 1: Steels |
EN 16725:2016 | Railway applications - Track - Restoration and repair of manganese crossings |
EN 14199:2015 | Execution of special geotechnical works - Micropiles |
EN 4632-003:2010 | Aerospace series - Weldability and brazeability of materials in aerospace constructions - Part 003: Welding and brazing of homogeneous assemblies of unalloyed and low alloy steels |
16/30328759 DC : 0 | BS EN 13814-1 - SAFETY OF AMUSEMENT RIDES AND AMUSEMENT DEVICES - PART 1: DESIGN AND MANUFACTURE |
UNE-EN 14893:2014 | LPG equipment and accessories - Transportable Liquefied Petroleum Gas (LPG) welded steel pressure drums with a capacity between 150 litres and 1 000 litres |
I.S. EN 4632-003:2010 | AEROSPACE SERIES - WELDABILITY AND BRAZEABILITY OF MATERIALS IN AEROSPACE CONSTRUCTIONS - PART 003: WELDING AND BRAZING OF HOMOGENEOUS ASSEMBLIES OF UNALLOYED AND LOW ALLOY STEELS |
10/30235392 DC : 0 | BS EN 287-1 - QUALIFICATION TEST OF WELDERS - FUSION WELDING - PART 1: STEELS |
15/30320416 DC : 0 | BS EN 1090-2 - EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
UNE-EN 16725:2017 | Railway applications - Track - Restoration and repair of manganese crossings |
08/30184300 DC : DRAFT SEP 2008 | BS EN 12952-2 - WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 2: MATERIALS FOR PRESSURE PARTS OF BOILERS AND ACCESSORIES |
13/30280740 DC : 0 | BS EN 12699 - EXECUTION OF SPECIAL GEOTECHNICAL WORK - DISPLACEMENT PILES |
I.S. EN 1090-2:2008 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
EN 1011-8:2018 | Welding - Recommendations for welding of metallic materials - Part 8: Welding of cast irons |
KTA 3201.3 : 2007(R2012) | COMPONENTS OF THE REACTOR COOLANT PRESSURE BOUNDARY OF LIGHT WATER REACTORS - PART 3: MANUFACTURE |
DIN EN 12952-2:2011-10 | Water-tube boilers and auxiliary installations - Part 2: Materials for pressure parts of boilers and accessories |
BS EN 14893:2014 | LPG equipment and accessories. Transportable Liquefied Petroleum Gas (LPG) welded steel pressure drums with a capacity between 150 litres and 1 000 litres |
BS EN 12952-2:2011 | Water-tube boilers and auxiliary installations Materials for pressure parts of boilers and accessories |
BS EN 14199:2015 | Execution of special geotechnical works. Micropiles |
EN 12699:2015 | Execution of special geotechnical works - Displacement piles |
DIN EN 287-1:2004-05 | QUALIFICATION TEST OF WELDERS - FUSION WELDING - PART 1: STEELS |
EN 12732:2013+A1:2014 | Gas infrastructure - Welding steel pipework - Functional requirements |
UNE-EN 12732:2014 | Gas infrastructure - Welding steel pipework - Functional requirements |
ISO 15792-3:2011 | Welding consumables Test methods Part 3: Classification testing of positional capacity and root penetration of welding consumables in a fillet weld |
ISO 544:2011 | Welding consumables Technical delivery conditions for filler materials and fluxes Type of product, dimensions, tolerances and markings |
ISO 6847:2013 | Welding consumables Deposition of a weld metal pad for chemical analysis |
ISO 14344:2010 | Welding consumables — Procurement of filler materials and fluxes |
ISO 15792-1:2000 | Welding consumables Test methods Part 1: Test methods for all-weld metal test specimens in steel, nickel and nickel alloys |
ISO 2401:1972 | Covered electrodes Determination of the efficiency, metal recovery and deposition coefficient |
ISO 80000-1:2009 | Quantities and units — Part 1: General |
EN 499 : 1994 | WELDING CONSUMABLES - COVERED ELECTRODES FOR MANUAL METAL ARC OF NON ALLOY AND FINE GRAIN STEELS - CLASSIFICATION |
ISO 3690:2012 | Welding and allied processes Determination of hydrogen content in arc weld metal |
ISO 13916:2017 | Welding — Measurement of preheating temperature, interpass temperature and preheat maintenance temperature |
ISO 6947:2011 | Welding and allied processes Welding positions |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.