EN 61850-7-1:2011
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011)
10-21-2020
01-12-2013
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Overview of the IEC 61850 series concepts
6 Modelling approach of the IEC 61850 series
7 Application view
8 Device view
9 Communication view
10 Where physical devices, application models
and communication meet
11 Relationships between IEC 61850-7-2,
IEC 61850-7-3 and IEC 61850-7-4
12 Formal specification method
13 Name spaces
14 Common rules for new version of classes and
for extension of classes
Annex A (informative) - Overview of logical nodes
and data
Annex B (informative) - Allocation of data to logical
nodes
Annex C (informative) - Use of the substation
configuration language (SCL)
Annex D (informative) - Applying the LN concept
to options for future extensions
Annex E (informative) - Relation between logical
nodes and PICOMs
Annex F (informative) - Mapping the ACSI to real
communication systems
Bibliography
Annex ZA (normative) - Normative references to
international publications with their
corresponding European publications
Describes the modeling methods, communication principles and information models that are used in the parts of IEC 61850-7-x series.
Committee |
TC 57
|
DocumentType |
Standard
|
PublisherName |
European Committee for Standards - Electrical
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
OVE/ONORM EN 61850-7-1 : 2012 | Identical |
IEC 61850-7-1:2011 | Identical |
NBN EN 61850 7-1 : 2012 | Identical |
NEN EN IEC 61850-7-1 : 2011 | Identical |
I.S. EN 61850-7-1:2011 | Identical |
PN EN 61850-7-1 : 2011 | Identical |
SN EN 61850-7-1 : 2003 | Identical |
UNE-EN 61850-7-1:2011 | Identical |
BS EN 61850-7-1:2011 | Identical |
CEI EN 61850-7-1 : 2012 | Identical |
NF EN 61850-7-1 : 2012 | Identical |
DIN EN 61850-7-1:2012-04 | Identical |
PNE-FprEN 61850-7-1 | Identical |
CEI EN 61400-25-1 : 2007 | WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
BS EN 61400-25-1:2017 | Wind energy generation systems Communications for monitoring and control of wind power plants. Overall description of principles and models |
CEI EN 61400-25-6 : 2011 | WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING |
I.S. EN 61850-7-2:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
CEI EN 61850-9-2 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 |
BS EN 61850-6:2010 | Communication networks and systems for power utility automation Configuration description language for communication in electrical substations related to IEDs |
CEI EN 61850-7-2 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
CEI EN 61850-8-1 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
I.S. EN 61850-9-2:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 (IEC 61850-9-2:2011 (EQV)) |
EN 61400-25-1:2017 | Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models |
EN 61850-10:2013 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
EN 62271-3:2015 | High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
EN 61400-25-6:2017 | Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring |
EN 61850-7-420:2009 | Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
EN 61850-6:2010 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
BS EN 62271-3:2015 | High-voltage switchgear and controlgear Digital interfaces based on IEC 61850 |
BS EN 61850-7-4:2010 | Communication networks and systems for power utility automation Basic communication structure. Compatible logical node classes and data object classes |
I.S. EN 61400-25-2:2015 | WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS |
BS EN 61400-25-2:2015 | Wind turbines Communications for monitoring and control of wind power plants - Information models |
BS EN 61850-9-2:2011 | Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Sampled values over ISO/IEC 8802-3 |
I.S. EN 61850-7-420:2009 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES |
I.S. EN 61400-25-6:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING |
I.S. EN 61850-7-3:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-3: BASIC COMMUNICATION STRUCTURE - COMMON DATA CLASSES |
I.S. EN 61850-6:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
BS EN 61850-7-3:2011 | Communication networks and systems for power utility automation Basic communication structure. Common data classes |
BS EN 61400-25-5:2017 | Wind energy generation systems Communications for monitoring and control of wind power plants. Compliance testing |
I.S. EN 61850-7-4:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
CEI EN 61400-25-5 : 2007 | WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING |
I.S. EN 61400-25-1:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
CEI EN 61850-7-4 : 2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-4: BASIC COMMUNICATION STRUCTURE - COMPATIBLE LOGICAL NODE CLASSES AND DATA OBJECT CLASSES |
EN 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
EN 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
EN 61400-25-5:2017 | Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
OVE/ONORM EN 61400-25-1 : 2007 | WIND TURBINES - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS |
BS EN 61850-10:2013 | Communication networks and systems for power utility automation Conformance testing |
BS EN 61400-25-6:2017 | Wind energy generation systems Communications for monitoring and control of wind power plants. Logical node classes and data classes for condition monitoring |
BS EN 61850-7-2:2010 | Communication networks and systems for power utility automation Basic information and communication structure. Abstract communication service interface (ACSI) |
BS EN 61850-7-410 : 2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
I.S. EN 61400-25-5:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - COMPLIANCE TESTING |
I.S. EN 61850-8-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3 |
I.S. EN 61850-9-2:2011/A1:2020 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 (IEC 61850-9-2:2011/A1:2020)<br> |
EN 61850-7-3:2011 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
EN 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
EN 61850-7-2:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
I.S. EN 61850-7-410:2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL |
BS EN 61850-8-1:2011 | Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
BS EN 61850-7-420:2009 | Communication networks and systems for power utility automation Basic communication structure. Distributed energy resources logical nodes |
CEI EN 61850-6 : 2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 6: CONFIGURATION DESCRIPTION LANGUAGE FOR COMMUNICATION IN ELECTRICAL SUBSTATIONS RELATED TO IEDS |
CEI EN 61850-7-3 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-3: BASIC COMMUNICATION STRUCTURE - COMMON DATA CLASSES |
I.S. EN 61850-10:2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV)) |
EN 61850-7-410:2013/A1:2016 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL (IEC 61850-7-410:2012/A1:2015) |
EN 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
IEC 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
EN 61850-6:2010 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
ISO 9506-2:2003 | Industrial automation systems Manufacturing Message Specification Part 2: Protocol specification |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
EN 61850-7-2:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
EN 61850-10:2013 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
ISO/IEC 8802-3:2000 | Information technology Telecommunications and information exchange between systems Local and metropolitan area networks Specific requirements Part 3: Carrier sense multiple access with collision detection (CSMA/CD) access method and physical layer specifications |
EN 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
EN 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
ISO 9506-1:2003 | Industrial automation systems Manufacturing Message Specification Part 1: Service definition |
IEC TR 61850-90-1:2010 | Communication networks and systems for power utility automation - Part 90-1: Use of IEC 61850 for the communication between substations |
IEC 61346-1:1996 | Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 1: Basic rules |
IEC 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 60050-101:1998 | International Electrotechnical Vocabulary (IEV) - Part 101: Mathematics |
EN 61346-1:1996 | Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 1: Basic rules |
EN 61850-7-3:2011 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
EN 61850-3:2014 | Communication networks and systems for power utility automation - Part 3: General requirements |
IEC 61850-4:2011 | Communication networks and systems for power utility automation - Part 4: System and project management |
EN 61346-2:2000 | Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 2: Classification of objects and codes for classes |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 61850-7-3:2010 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
EN 61850-4:2011 | Communication networks and systems for power utility automation - Part 4: System and project management |
IEC 61850-10:2012 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
EN 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
IEC TS 61850-2:2003 | Communication networks and systems in substations - Part 2: Glossary |
IEC 61346-2:2000 | Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 2: Classification of objects and codes for classes |
EN 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61850-3:2013 | Communication networks and systems for power utility automation - Part 3: General requirements |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.