• Shopping Cart
    There are no items in your cart

EN 60512-9-3:2011

Current

Current

The latest, up-to-date edition.

Connectors for electronic equipment - Tests and measurements - Part 9-3: Endurance tests - Test 9c: Mechanical operation (engaging/separating) with electrical load

Published date

07-29-2011

FOREWORD
1 Scope and object
2 Normative references
3 Preparation
4 Test method
5 Details to be specified
Annex A (informative) - Typical circuit diagram
Annex ZA (normative) - Normative references to
         international publications with their
         corresponding European publications

IEC 60512-9-3:2011 defines a standard test method to assess the mechanical and electrical operational endurance, i.e. engaging and separating cycles, of a connector in an operating mode which includes a specified electrical load. This second edition cancels and replaces Test 9c of IEC 60512-5, issued in 1992, and constitutes a technical revision. The main technical changes with regard to the previous edition are as follows: - An additional requirement to 4.1 stating that if more than one electrical circuit is wired for testing, the wiring shall be carried out in a parallel electrical circuit. - Subclauses 4.3 through 4.7 were removed and replaced by 4.2 through 4.4. This publication is to be read in conjunction with IEC 60512-1:2001 and IEC 60512-1-100:2006.

Committee
CLC/SR 48B
DevelopmentNote
To be read in conjunction with EN 60512-1 and EN 60512-1-100 (04/2006) Supersedes UNE EN 60512-9-3. (08/2014)
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Current

CEI EN 60512-99-001 : 2013 CONNECTORS FOR ELECTRONIC EQUIPMENT - TESTS AND MEASUREMENTS - PART 99-001: TEST SCHEDULE FOR ENGAGING AND SEPARATING CONNECTORS UNDER ELECTRICAL LOAD - TEST 99A: CONNECTORS USED IN TWISTED PAIR COMMUNICATION CABLING WITH REMOTE POWER
PD CLC/TR 50174-99-1:2015 Information technology. Cabling installation Remote powering
S.R. CLC/TR 50174-99-1:2015 INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 99-1: REMOTE POWERING
BS EN 60512-99-001:2012 Connectors for electronic equipment. Tests and measurements Test schedule for engaging and separating connectors under electrical load. Test 99a: Connectors used in twisted pair communication cabling with remote power
I.S. EN 60512-99-001:2012 CONNECTORS FOR ELECTRONIC EQUIPMENT - TESTS AND MEASUREMENTS - PART 99-001: TEST SCHEDULE FOR ENGAGING AND SEPARATING CONNECTORS UNDER ELECTRICAL LOAD - TEST 99A: CONNECTORS USED IN TWISTED PAIR COMMUNICATION CABLING WITH REMOTE POWER (IEC 60512-99-001:2012 (EQV))
CLC/TR 50174-99-1:2015 Information technology - Cabling installation - Part 99-1: Remote powering
EN 60512-99-001:2012 Connectors for electronic equipment - Tests and measurements - Part 99-001: Test schedule for engaging and separating connectors under electrical load - Test 99a: Connectors used in twisted pair communication cabling with remote power

IEC 60512-3-1:2002 Connectors for electronic equipment - Tests and measurements - Part 3-1: Insulation tests - Test 3a: Insulation resistance
IEC 60068-1:2013 Environmental testing - Part 1: General and guidance
EN 60512-1-100:2012 Connectors for electronic equipment - Tests and measurements - Part 1-100: General - Applicable publications
IEC 60068-2-13:1983 Basic environmental testing procedures - Part 2-13: Tests - Test M: Low air pressure
EN 60068-1:2014 Environmental testing - Part 1: General and guidance
EN 60512-2-2:2003 Connectors for electronic equipment - Tests and measurements - Part 2-2: Electrical continuity and contact resistance tests - Test 2b: Contact resistance - Specified test current method
EN 60512-1:2001 Connectors for electronic equipment - Tests and measurements - Part 1: General
IEC 60512-2-2:2003 Connectors for electronic equipment - Tests and measurements - Part 2-2: Electrical continuity and contact resistance tests - Test 2b: Contact resistance - Specified test current method
IEC 60512-1-1:2002 Connectors for electronic equipment - Tests and measurements - Part 1-1: General examination - Test 1a: Visual examination
IEC 60512-1-100:2012 Connectors for electronic equipment - Tests and measurements - Part 1-100: General - Applicable publications
IEC 60512-2-1:2002 Connectors for electronic equipment - Tests and measurements - Part 2-1: Electrical continuity and contact resistance tests - Test 2a: Contact resistance - Millivolt level method
EN 60512-3-1:2002 Connectors for electronic equipment - Tests and measurements - Part 3-1: Insulation tests - Test 3a: Insulation resistance
IEC 60512-4-1:2003 Connectors for electronic equipment - Tests and measurements - Part 4-1: Voltage stress tests - Test 4a: Voltage proof
EN 60068-2-13:1999 Environmental testing - Part 2: Tests - Test M: Low air pressure
EN 60512-4-1:2003 Connectors for electronic equipment - Tests and measurements - Part 4-1: Voltage stress tests - Test 4a: Voltage proof
IEC 60512-1:2001 Connectors for electronic equipment - Tests and measurements - Part 1: General
EN 60512-1-1:2002 Connectors for electronic equipment - Tests and measurements - Part 1-1: General examination - Test 1a: Visual examination
EN 60512-2-1:2002 Connectors for electronic equipment - Tests and measurements - Part 2-1: Electrical continuity and contact resistance tests - Test 2a: Contact resistance - Millivolt level method

Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.