• Shopping Cart
    There are no items in your cart

EN 60255-22-4:2008

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Measuring relays and protection equipment - Part 22-4: Electrical disturbance tests - Electrical fast transient/burst immunity test

Published date

06-05-2008

Superseded date

09-01-2013

Superseded by

EN 60255-26:2013/AC:2013

Sorry this product is not available in your region.

FOREWORD
1 Scope and object
2 Normative references
3 Terms and definitions
4 Test severity level
5 Test equipment
6 Test set-up
  6.1 Test set-up using CDNs
  6.2 Test set-up using the capacitive coupling clamp
7 Test procedure
8 Criteria for acceptance
9 Test report
Annex A (informative) - Background information for fast
                        transient/burst immunity test
Annex B (informative) - Examples of environments for Class A
                        and Class B test levels
Annex ZA (normative) - Normative references to international
                       publications with their corresponding
                       European publications

IEC 60255-22-4:2008 specifies the general requirements for electrical fast transient immunity tests for measuring relays and protection equipment for power system protection, including the control, monitoring and process interface equipment used with these systems. Is based on IEC 61000-4-4. The objective of the tests is to confirm that the equipment under test will operate correctly when energized and subjected to repetitive fast transients (bursts) such as those originating from interrupting of inductive loads, relay contact bounce, etc. The main change with respect to the previous edition is the improvement of the test severity level regarding the repetition rate.

Committee
CLC/TC 95X
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Superseded
SupersededBy

BS EN 60255-1:2010 Measuring relays and protection equipment Common requirements
CEI EN 60255-1 : 2011 MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 1: COMMON REQUIREMENTS
UNE-EN 60255-1:2010 Measuring relays and protection equipment -- Part 1: Common requirements
I.S. EN 60255-1:2010 MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 1: COMMON REQUIREMENTS
EN 60255-1:2010 Measuring relays and protection equipment - Part 1: Common requirements

IEC 61000-4-4:2012 RLV Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
EN 60255-6 : 94 AC 95 ELECTRICAL RELAYS - MEASURING RELAYS AND PROTECTION EQUIPMENT
IEC 60255-6:1988 Electrical relays - Part 6: Measuring relays and protection equipment
EN 61000-4-4:2012 Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test

Access your standards online with a subscription

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Sorry this product is not available in your region.