EN 13146-3:2012
Current
The latest, up-to-date edition.
Railway applications - Track - Test methods for fastening systems - Part 3: Determination of attenuation of impact loads
04-04-2012
Foreword
1 Scope
2 Normative references
3 Terms and definitions, symbols and
abbreviations
4 Principle
5 Apparatus
6 Test specimens
7 Procedure - Reference method
8 Procedure - Alternative method
9 Test report
Annex A (informative) - Sample calculation
This European Standard specifies laboratory test procedures for applying an impact to a rail fastened to a concrete sleeper or bearer which simulates the impact loading caused by traffic on railway tracks and measuring the strain induced in the sleeper. They are used for comparing the attenuation of impact loads on concrete sleepers or bearers by different rail pads. A reference procedure and alternative procedure are included.This test is only applicable to ballasted track.These test procedures apply to a complete fastening assembly.
Committee |
CEN/TC 256
|
DevelopmentNote |
Supersedes PREN 13146-3. (04/2012)
|
DocumentType |
Standard
|
PublisherName |
Comite Europeen de Normalisation
|
Status |
Current
|
Supersedes |
Standards | Relationship |
PN EN 13146-3 : 2012 | Identical |
SN EN 13146-3:2012 | Identical |
UNI EN 13146-3 : 2012 | Identical |
NF EN 13146-3 : 2012 | Identical |
NEN EN 13146-3 : 2012 | Identical |
NBN EN 13146-3 : 2012 | Identical |
I.S. EN 13146-3:2012 | Identical |
BS EN 13146-3:2012 | Identical |
NS EN 13146-3 : 2012 | Identical |
UNE-EN 13146-3:2012 | Identical |
DIN EN 13146-3:2012-06 | Identical |
UNE-EN 16431:2015 | Railway applications - Track - Hollow sleepers and bearers |
BS EN 16431:2014 | Railway applications. Track. Hollow sleepers and bearers |
03/305393 DC : DRAFT MAR 2003 | BS ISO 14837-1 - MECHANICAL VIBRATION - GROUND-BORNE VIBRATION ARISING FROM RAIL SYSTEMS IN TUNNELS - PART 1: GUIDANCE ON PREDICTION MODELS |
DIN EN 13481-7:2012-08 | Railway applications - Track - Performance requirements for fastening systems - Part 7: Special fastening systems for switches and crossings and check rails |
DIN EN 13481-1:2012-08 | Railway applications - Track - Performance requirements for fastening systems - Part 1: Definitions |
DIN EN 13481-2:2012-08 | RAILWAY APPLICATIONS - TRACK - PERFORMANCE REQUIREMENTS FOR FASTENING SYSTEMS - PART 2: FASTENING SYSTEMS FOR CONCRETE SLEEPERS |
EN 13481-7:2012 | Railway applications - Track - Performance requirements for fastening systems - Part 7: Special fastening systems for switches and crossings and check rails |
EN 13481-5:2012+A1:2017 | Railway applications - Track - Performance requirements for fastening systems - Part 5: Fastening systems for slab track with rail on the surface or rail embedded in a channel |
UNI EN 16431 : 2014 | RAILWAY APPLICATIONS - TRACK - HOLLOW SLEEPERS AND BEARERS |
03/314354 DC : DRAFT SEP 2003 | BS EN 13232-7 - RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS - PART 7: CROSSINGS WITH MOVEABLE PARTS |
UNE-EN 13481-7:2012 | Railway applications - Track - Performance requirements for fastening systems - Part 7: Special fastening systems for switches and crossings and check rails |
BS ISO 14837-1:2005 | Mechanical vibration. Ground-borne noise and vibration arising from rail systems General guidance |
UNE-EN 13481-1:2012 | Railway applications - Track - Performance requirements for fastening systems - Part 1: Definitions |
I.S. EN 13481-5:2012 | RAILWAY APPLICATIONS - TRACK - PERFORMANCE REQUIREMENTS FOR FASTENING SYSTEMS - PART 5: FASTENING SYSTEMS FOR SLAB TRACK WITH RAIL ON THE SURFACE OR RAIL EMBEDDED IN A CHANNEL |
DIN EN 13481-8:2006-06 | RAILWAY APPLICATIONS - TRACK - PERFORMANCE REQUIREMENTS FOR FASTENING SYSTEMS - PART 8: FASTENING SYSTEMS FOR TRACK WITH HEAVY AXLE LOADS |
I.S. EN 13481-8:2006 | RAILWAY APPLICATIONS - TRACK - PERFORMANCE REQUIREMENTS FOR FASTENING SYSTEMS - PART 8: FASTENING SYSTEMS FOR TRACK WITH HEAVY AXLE LOADS |
I.S. EN 13481-7:2012 | RAILWAY APPLICATIONS - TRACK - PERFORMANCE REQUIREMENTS FOR FASTENING SYSTEMS - PART 7: SPECIAL FASTENING SYSTEMS FOR SWITCHES AND CROSSING AND CHECK RAILS |
I.S. EN 13481-1:2012 | RAILWAY APPLICATIONS - TRACK - PERFORMANCE REQUIREMENTS FOR FASTENING SYSTEMS - PART 1: DEFINITIONS |
I.S. EN 13481-2:2012 | RAILWAY APPLICATIONS - TRACK - PERFORMANCE REQUIREMENTS FOR FASTENING SYSTEMS - PART 2: FASTENING SYSTEMS FOR CONCRETE SLEEPERS |
12/30258469 DC : 0 | BS EN 16431 - RAILWAY APPLICATIONS - TRACK - HOLLOW SLEEPERS AND BEARERS |
I.S. EN 16431:2014 | RAILWAY APPLICATIONS - TRACK - HOLLOW SLEEPERS AND BEARERS |
ISO 14837-1:2005 | Mechanical vibration Ground-borne noise and vibration arising from rail systems Part 1: General guidance |
UNI EN 13481-7 : 2012 | RAILWAY APPLICATIONS - TRACK - PERFORMANCE REQUIREMENTS FOR FASTENING SYSTEMS - PART 7: SPECIAL FASTENING SYSTEMS FOR SWITCHES AND CROSSINGS AND CHECK RAILS |
UNI EN 13481-1 : 2012 | RAILWAY APPLICATIONS - TRACK - PERFORMANCE REQUIREMENTS FOR FASTENING SYSTEMS - PART 1: DEFINITIONS |
UNI ISO 14837-1 : 2013 | MECHANICAL VIBRATION - GROUND-BORNE NOISE AND VIBRATION ARISING FROM RAIL SYSTEMS - PART 1: GENERAL GUIDANCE |
DIN EN 16431 E : 2014 | RAILWAY APPLICATIONS - TRACK - HOLLOW SLEEPERS AND BEARERS |
14/30209503 DC : 0 | BS EN 13230-6 - RAILWAY APPLICATIONS - TRACK - CONCRETE SLEEPERS AND BEARERS - PART 6: DESIGN |
DIN EN 13481-5:2012-08 | RAILWAY APPLICATIONS - TRACK - PERFORMANCE REQUIREMENTS FOR FASTENING SYSTEMS - PART 5: FASTENING SYSTEMS FOR SLAB TRACK WITH RAIL ON THE SURFACE OR RAIL EMBEDDED IN A CHANNEL |
BS EN 13481-5 : 2012 | RAILWAY APPLICATIONS - TRACK - PERFORMANCE REQUIREMENTS FOR FASTENING SYSTEMS - PART 5: FASTENING SYSTEMS FOR SLAB TRACK WITH RAIL ON THE SURFACE OR RAIL EMBEDDED IN A CHANNEL |
BS EN 13481-7:2012 | Railway applications. Track. Performance requirements for fastening systems Special fastening systems for switches and crossings and check rails |
BS EN 13481-1:2012 | Railway applications. Track. Performance requirements for fastening systems Definitions |
BS EN 13481-8:2006 | Railway applications. Track. Performance requirements for fastening systems Fastening systems for track with heavy axle loads |
UNE-EN 13481-2:2012 | Railway applications - Track - Performance requirements for fastening systems - Part 2: Fastening systems for concrete sleepers |
BS EN 13481-2 : 2012 | RAILWAY APPLICATIONS - TRACK - PERFORMANCE REQUIREMENTS FOR FASTENING SYSTEMS - PART 2: FASTENING SYSTEMS FOR CONCRETE SLEEPERS |
EN 16431:2014 | Railway applications - Track - Hollow sleepers and bearers |
DIN EN 16431:2014-10 | RAILWAY APPLICATIONS - TRACK - HOLLOW SLEEPERS AND BEARERS |
EN 13481-2:2012+A1:2017 | Railway applications - Track - Performance requirements for fastening systems - Part 2: Fastening systems for concrete sleepers |
EN 13481-1:2012 | Railway applications - Track - Performance requirements for fastening systems - Part 1: Definitions |
EN 13481-8:2006 | Railway applications - Track - Performance requirements for fastening systems - Part 8: Fastening systems for track with heavy axle loads |
UNE-EN 13481-5:2012 | Railway applications - Track - Performance requirements for fastening systems - Part 5: Fastening systems for slab track with rail on the surface or rail embedded in a channel |
EN 13230-2:2016 | Railway applications - Track - Concrete sleepers and bearers - Part 2: Prestressed monoblock sleepers |
EN 13146-9:2009+A1:2011 | Railway applications - Track - Test methods for fastening systems - Part 9: Determination of stiffness |
EN 13230-1:2016 | Railway applications - Track - Concrete sleepers and bearers - Part 1: General requirements |
EN 13230-3:2016 | Railway applications - Track - Concrete sleepers and bearers - Part 3: Twin-block reinforced sleepers |
EN 13481-1:2012 | Railway applications - Track - Performance requirements for fastening systems - Part 1: Definitions |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.