EI PSM GUID. MEET. EXPECT. - ELEMENT 14 : 1ED 2015
Current
The latest, up-to-date edition.
GUIDANCE ON MEETING EXPECTATIONS OF EI PROCESS SAFETY MANAGEMENT FRAMEWORK - ELEMENT 14: EMERGENCY PREPAREDNESS
09-01-2015
Publications in this series
Foreword
Acknowledgements
1 Introduction
2 Arrangements for meeting expectations
3 Suggested compliance checks and performance measures
Annexes
Annex A - References and bibliography
Annex B - Glossary of acronyms and abbreviations
Annex C - Mapping of process steps to EI PSM framework
expectations
Annex D - Example report template: management and supervisory
field observation
Pertains to good practices for emergency preparedness, ensuring that effective crisis and emergency response plans are developed, so that the organisation can respond effectively to any crisis, emergency situation or incident.
DocumentType |
Standard
|
PublisherName |
Energy Institute (formerly Institute of Petroleum - IP)
|
Status |
Current
|
EI GUIDE. FOR IDENTIFICATION AND MGMT. : 1ED 2012 | GUIDELINES FOR THE IDENTIFICATION AND MANAGEMENT OF ENVIRONMENTALLY CRITICAL ELEMENTS |
EI PSM FRAMEWORK : 1ED 2010 | HIGH LEVEL FRAMEWORK FOR PROCESS SAFETY MANAGEMENT |
EI MODEL CODE SAFE PRACTICE PT14 : 1ED 1980 | PETROLEUM INDUSTRY - INSPECTION AND TESTING OF PROTECTIVE INSTRUMENTATION SYSTEMS |
ISO 22301:2012 | Societal security Business continuity management systems Requirements |
EI MODEL CODE SAFE PRACTICE PT19 : 2012 | FIRE PRECAUTIONS AT PETROLEUM REFINERIES AND BULK STORAGE INSTALLATIONS |
BS 2599(1955) : LATEST | FLAX CANVAS UNLINED HOSE FOR FIRE-FIGHTING AND FIRE PROTECTION |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.