DEFSTAN 00-101(PT2)/1(2005) : 2005
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
DESIGN STANDARDS FOR EXPLOSIVES SAFETY IN MOD SHIPS AND SUBMARINES - PART 2: SUBMARINES
Hardcopy , PDF
06-27-2008
English
01-01-2005
Foreword
Introduction
1 SCOPE
2 WARNING
3 RELATED DOCUMENTS
4 DEFINITIONS AND ABBREVIATIONS
5 AMENDMENT
6 SPONSORSHIP OF THE REQUIREMENT AND SECURITY
7 INTRODUCTION TO THE PROCESS FOR APPROVAL OF A CERTIFICATE
OF SAFETY EXPLOSIVES
7.1 Introduction to the Process
7.2 The JSP 520 process (1st stage)
7.3 The JSP 520/430 Interface
7.4 The JSP 430 process (2nd stage)
7.5 The Generic Naval Environment
7.6 Magazine & Munition Protection Strategy
7.7 Warships In Harbour
7.8 Regulatory Documentation
SECTION 1 - PERFORMANCE REQUIREMENTS, ACOP AND GUIDANCE
8 PRINCIPLES FOR THE SAFE STOWAGE, PROTECTION AND HANDLING
OF EXPLOSIVE MUNITIONS/STORES IN MOD SUBMARINES
8.1 Description
8.2 Performance Requirements - Basic Principles for
the Safety and Protection of WSCs, Magazines and
Munitions in MoD Submarines
8.3 ACOP - Relationship of Explosive Safety to
Vulnerability Reduction
8.4 ACOP - Basic Principles of Capacity and Size
8.5 ACOP - Basic Principles of for the Safety and
Protection of WSCs, Magazines and Munitions
8.6 Guidance - Threat Hazard Assessment and WSC,
Magazine and Munition Protection Strategies
8.7 Guidance - Basic Principles for Environmental
Hazards
8.8 Guidance - Explosives Compatibility Groups
8.9 Guidance - Assessment of RATTAM Protection
8.10 Guidance - BR 862 and other Safety and Environmental
Management Systems (SEMS)
9 DESIGNATED DANGER AREAS (DDAs)
9.1 Description
9.2 Performance Requirements for DDAs
9.3 ACOP for DDAs
9.4 ACOP for Marking of Areas around Launchers
9.5 Guidance - DDAs
10 ADJACENT COMPARTMENTS
10.1 Description
10.2 Performance Requirements for Adjacent Compartments
10.3 ACOP for Reduction of Hazards from Adjacent
Compartments
10.4 ACOP for POL and Tanks Adjacent to a WSC/Magazine
10.5 ACOP for Smoke/Heat Detectors in Adjacent
Compartments
10.6 Guidance - Adjacent Compartments
10.7 Guidance - POL Products in Adjacent Compartments
10.8 Guidance - Smoke/Heat Detectors in Adjacent
Compartments
11 GENERAL WSC/MAGAZINE CONSTRUCTION REQUIREMENTS
11.1 Description
11.2 Performance Requirements for General WSC/Magazine
Construction
11.3 ACOP for Structural Integrity of WSCs/Magazines
11.4 ACOP for General WSC Construction Requirements
11.5 ACOP for Hydraulic Systems in WSCs/Magazines
11.6 ACOP for Air Systems in WSCs/Magazines
11.7 ACOP for Electrical Equipment and System
Requirements
11.8 ACOP for Non-Electrical Equipment Requirements
in WSCs/Magazines
11.9 ACOP for Painting and Preservation in WSCs/Magazines
11.10 ACOP for Pumping/Flooding Arrangements in WSCs/Magazines
11.11 ACOP for Access to WSCs/Magazines
11.12 ACOP for Emergency Lighting in WSCs/Magazines
11.13 ACOP for Contents of WSCs
11.14 ACOP for Contents of Magazines and Small Magazines
11.15 ACOP for WSC/Magazine Hazard Warning/Safety Signs &
Notices
11.16 Guidance - Safety Assessment Within the WSC/Magazine
11.17 Guidance - Use of Flammable Hydraulic Fluids
11.18 Guidance - Pumping/Flooding for WSCs/Magazines
11.19 Guidance - Access to WSCs/Magazines
11.20 Guidance - Emergency Lighting for WSCs/Magazines
11.21 Guidance - Magazine Designed Capacity Lists
11.22 Guidance - Safety Signs and Notices
11.23 Guidance - Use of the WSC for Temporary Accommodation
12 MUNITION STOWAGES AND FITTINGS
12.1 Description
12.2 Performance Requirements for Munition Stowages and
Fittings
12.3 ACOP for General Munition Stowage Requirements
12.4 ACOP for Clearance between Stowages and Adjacent
Boundaries
12.5 ACOP for Identification of Stowages and Stowage
Capacity
12.6 Guidance - Safe Stowage
12.7 Guidance - Clearances between Stowages and Adjacent
Boundaries
13 EXPLOSIVES STORE LOCKERS (ESL)/MAGAZINE LOCKERS
13.1 Description
13.2 Performance Requirements for ESL/Magazine Locker
Design
13.3 Performance Requirements for ESL/Magazine Locker
Flooding Arrangements
13.4 Performance Requirements for Siting and Installation
of ESLs/Magazine Lockers
13.5 ACOP for ESL/Magazine Locker Design
13.6 ACOP for ESL/Magazine Locker Flooding Arrangements
13.7 ACOP for Siting and Installation of ESLs/Magazine
Lockers
13.8 ACOP for Specific Locker Requirements
13.9 ACOP for General Locker Notices and Notice Boards
13.10 ACOP for ESL/Magazine Locker Contents
13.11 Guidance - ESL/Magazine Lockers
13.12 Guidance - Ready Use Magazines/Lockers
14 TORPEDO TUBES, LAUNCH TUBES AND UNDERWATER STORES EJECTOR
SYSTEMS
14.1 Description
14.2 Performance Requirements for Tubes and Launchers
14.3 Performance Requirements for Torpedo and Missile Tubes
14.4 Performance Requirements for Underwater Stores
Launch/Ejector Tubes
14.5 ACOP for Torpedo and Missile Tubes
14.6 ACOP for Underwater Stores Launch/Ejector Tubes
14.7 ACOP for External Launcher/Ejector Tubes
14.8 Guidance - Torpedo Tubes and Underwater Ejector Systems
14.9 Guidance - External Launcher/Ejector Tubes
15 SPECIAL FORCES (SF)
15.1 Description
15.2 Performance Requirements for Stowage of SF Munitions
15.3 Performance Requirements for Assault Routes
15.4 ACOP for Stowage of SF/EMF Munitions
15.5 ACOP for Assault Routes
15.6 Guidance - Stowage of SF/EMF Munitions in Submarines
16 AIR CONDITIONING/VENTILATION SYSTEMS
16.1 Description
16.2 Performance Requirements for Air
Conditioning/Ventilation Systems
16.3 ACOP for Environmental Requirements
16.4 ACOP for Ventilation System Design and Installation
16.5 ACOP for Ventilation Trunking
16.6 ACOP for Ventilation Isolation Arrangements
16.7 ACOP for Ventilation Valve - Local and Remote
Operating Positions
16.8 ACOP for Ventilation System Notices
16.9 Guidance - Air Conditioning/Ventilation Systems
17 FIRE PREVENTION AND FIRE FIGHTING ARRANGEMENTS
17.1 Description
17.2 Performance Requirements for General Fire Fighting
Arrangements
17.3 ACOP for Fire Prevention in Submarine Explosives
Areas
17.4 ACOP for Common Principles of Fire Detection and
Control Systems
17.5 ACOP for General Principles for WSC Water Fog Systems
17.6 ACOP for WSC Firefighting Systems in S, T and V
Class Submarines
17.7 ACOP for WSC Firefighting Systems Water Supply
in S, T and V Class Submarines
17.8 ACOP for WSC/Magazine Water Fog System Signs/Notices
17.9 ACOP for First Aid Fire Fighting Equipment in
WSC/Magazines
17.10 ACOP for Fire Fighting Arrangements in DDAs
17.11 Guidance - Fire Prevention
17.12 Guidance - Fire Fighting Arrangements - General
17.13 Guidance - Design Requirements for Smoke and Heat
Detection
17.14 Guidance - Design Requirements for Spray Coverage
17.15 Guidance - Requirements for Free Air Space
17.16 Guidance - Integration of Fire Alarm Systems
17.17 Guidance - Munition Fire Characteristics
17.18 Guidance on First Aid Fire Fighting Equipment for
WSC/Magazines and DDAs
18 MITIGATION METHODS TO PREVENT INITIATION OR REDUCE
CONSEQUENCES FROM MUNITION INITIATION EVENTS
18.1 Description
18.2 Performance Requirements for Mitigation Methods
18.3 ACOP for Mitigation Methods in Submarines
18.4 ACOP for Mitigation for Fire
18.5 ACOP for Mitigation for Blast Overpressure and Under
Water Shock
18.6 ACOP for Mitigation for Sympathetic Reaction
18.7 ACOP for Mitigation for Rocket Efflux and
Propulsive Reaction
18.8 ACOP for Mitigation for Stowage of Shaped Charge
Warheads including Demolition Munitions
18.9 ACOP for Mitigation Tests or Assessments
18.10 Guidance - Mitigation Methods in Submarines
18.11 Guidance - Deriving Protection and Mitigation Methods
18.12 Guidance - Corporate Knowledge of Mitigation Techniques
19 SECURITY AND ANTI-SABOTAGE ARRANGEMENTS
19.1 Description
19.2 Performance Requirements for Security and Anti
Sabotage
19.3 ACOP for Security of Doors, Hatches, Manholes
and Escape Scuttles
19.4 ACOP for Security Arrangements
19.5 Guidance on Security and Anti-Sabotage Arrangements
20 AMMUNITION HANDLING - EMBARKING, STOWING AND SUPPLY
20.1 Description
20.2 Performance Requirements for Ammunition Handling
Safety Policy
20.3 Performance Requirements for Ammunition Handling -
New Development
20.4 Performance Requirements for Ammunition Routes
20.5 Performance Requirements for Handling/Lifting Equipment
20.6 ACOP for Ammunition Handling
20.7 ACOP for Ammunition Routes
20.8 ACOP for Handling/Lifting Equipment in WSCs/Magazines
and DDAs
20.9 ACOP for Ammunition Route Drawings
20.10 Guidance - Ammunition Handling Safety Assessment
20.11 Guidance - Mechanical Handling Equipment in a
Submarine Environment
21 PLATFORM DYNAMIC SAFETY HAZARD ASSESSMENT
21.1 Description
21.2 Performance Requirements for Platform Dynamic Safety
21.3 ACOP for Safe Integration of OME Safety Cases into
Platform Safety Cases
21.4 Guidance for Safe Integration of OME Safety Cases
into Platform Safety Cases
21.5 Guidance on Platform Dynamic Safety for Combat Systems
21.6 Guidance on Platform Dynamic Safety for Missile Systems
21.7 Guidance on Platform Dynamic Safety for Torpedo Systems
SECTION 2 - REGULATIONS
22 GENERAL APPLICATION OF LEGISLATION
23 MOD DISAPPLICATION
24 MOD REGULATION
ANNEX A - RELATED DOCUMENTS
ANNEX B - ABBREVIATIONS
ANNEX C - DEFINITIONS
ANNEX D - THREAT HAZARD ASSESSMENT
ANNEX E - FORM S285K
Applies to the design, construction and ship fitting of all MOD Ships built to MOD or Classification Society constructional standards and operated by the Royal Navy, Army (including Special Forces), Royal Air Force, RFA or MS.
DevelopmentNote |
Supersedes DEFSTAN 08-101(PT2)/1(2000) and NES 183 PT2. (04/2005)
|
DocumentType |
Standard
|
Pages |
110
|
PublisherName |
UK Ministry of Defence Standards
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
DEFSTAN 02-603/2(2001) : INTERIM | REQUIREMENTS FOR THE POLICY, DESIGN AND INSTALLATION OF FIRE DETECTION SYSTEMS IN SHIPS |
IEC 60079-10:2002 | Electrical apparatus for explosive gas atmospheres - Part 10: Classification of hazardous areas |
AOP 39 : 2010 | GUIDANCE ON THE ASSESSMENT AND DEVELOPMENT OF INSENSITIVE MUNITIONS (IM) |
DEFSTAN 08-123/1(2000) : 2000 | REQUIREMENTS FOR THE DESIGN AND TESTING OF EQUIPMENTS TO MEET ENVIRONMENTAL CONDITIONS - CATEGORY 2 |
DEFSTAN 08-146/1(2001) : 2001 | REQUIREMENTS FOR LOCKERS (MAGAZINE, READY-USE MAGAZINE AND DETONATORS) USED FOR THE STOWAGE OF EXPLOSIVE STORES IN HM SURFACE SHIPS AND HM SUBMARINES |
DEFSTAN 00-101(PT3)/1(2005) : 2005 | DESIGN STANDARDS FOR EXPLOSIVES SAFETY IN MOD SHIPS AND SUBMARINES - PART 3: ELECTRICAL EQUIPMENT AND INSTALLATION |
DEFSTAN 08-120/1(2000) : 2000 | REQUIREMENTS FOR DETERMINING THE SHOCK STRENGTH OF EQUIPMENT - CATEGORY 2 |
DEFSTAN 02-361/1(2000) : 2000 | VALVE ROAD GEARING (LTD CIRC) CATEGORY 3 |
BS 5378:1976 | Specification for safety colours and safety signs |
DEFSTAN 02-127/1(2000) : 2000 | ACCESS FITTINGS AND EQUIPMENT |
DEFSTAN 02-784/2(2002) : 2002 | REQUIREMENTS FOR SAFETY SIGNS AND COLOURS |
DEFSTAN 08-107/2(2001) : 2001 | GENERAL REQUIREMENTS FOR THE DESIGN OF ELECTROMECHANICAL AND NAVAL WEAPON EQUIPMENT - CATEGORY 2 |
DEFSTAN 00-56(PT2)/3(2004) : INTERIM | SAFETY MANAGEMENT REQUIREMENTS FOR DEFENCE SYSTEMS - PART 2: GUIDANCE ON ESTABLISHING A MEANS OF COMPLYING WITH PART 1 |
DEFSTAN 02-188/1(2000) : 2000 | REQUIREMENTS FOR THE PROCUREMENT, STORAGE AND USE OF TIMBER |
DEFSTAN 02-703/1(2000) : 2000 | THERMAL AND ACOUSTIC INSULATION OF HULL AND MACHINERY |
DEFSTAN 07-279/2(2003) : 2003 | REQUIREMENTS FOR REPLENISHMENT AT SEA HM SURFACE SHIPS - CATEGORY 2 |
STANAG 4240 : 2003 | LIQUID FUEL/EXTERNAL FIRE, MUNITION TEST PROCEDURES |
DEFSTAN 07-252/1(2000) : 2000 | REQUIREMENTS FOR THE PREPARATION AND PAINTING OF SUBMARINES - CATEGORY 2 |
DEFSTAN 02-141/1(2000) : 2000 | REQUIREMENTS AND ORGANIZATION FOR THE MANAGEMENT ACCESS TO AND WITHIN COMPARTMENTS (SURFACE SHIPS) CATEGORY N/A |
DEFSTAN 08-147(PT2)/1(2000) : 2000 | REQUIREMENTS FOR DAMAGE CONTROL AND FIRE PROTECTION FOR THE SAFETY OF SURFACE SHIPS AND SUBMARINES - CATEGORY 1 - PART 2: SUBMARINES |
DEFSTAN 02-712/1(2000) : 2000 | REQUIREMENTS FOR SEWAGE AND GREY - WATER SYSTEMS FOR SURFACE SHIPS (OBSOLESCENT) CATEGORY 2 |
DEFSTAN 00-56(PT1)/3(2004) : INTERIM | SAFETY MANAGEMENT REQUIREMENTS FOR DEFENCE SYSTEMS - PART 1: REQUIREMENTS |
STANAG 4439 : 2010 | POLICY FOR INTRODUCTION AND ASSESSMENT OF INSENSITIVE MUNITIONS (IM) |
DEFSTAN 02-748/2(2002) : 2002 | REQUIREMENTS FOR STRAINERS IN HM SURFACE SHIPS AND SUBMARINES |
DEFSTAN 02-360/2(2001) : 2001 | GUIDANCE TO THE SELECTION OF LOW PRESSURE METRIC STANDARD VALVES |
DEFSTAN 00-35/2(1996) : 1996 AMD 1 1997 | ENVIRONMENTAL HANDBOOK FOR DEFENCE MATERIEL |
DEFSTAN 02-502/1(2000) : 2000 | REQUIREMENTS FOR ELECTRICAL INSTALLATIONS CATEGORY 2 |
DEFSTAN 07-207/1(2000) : 2000 | REQUIREMENTS FOR PADLOCKS - CATEGORY 3 |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.