• Shopping Cart
    There are no items in your cart

CSA N286.5 : 0

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

OPERATIONS QUALITY ASSURANCE FOR NUCLEAR POWER PLANTS

Available format(s)

Hardcopy , PDF

Superseded date

02-01-2005

Language(s)

English

US$95.00
Excluding Tax where applicable

Technical Committee on Overall Quality Assurance for
Nuclear Power Plants
Subcommittee on N286.5
Preface
1 Scope
2 Definitions and Reference Publications
   2.1 Definitions
   2.2 Reference Publications
3 Basic Requirements
   3.1 Program Definition
   3.2 Policy
   3.3 Organization and Responsibilities
   3.4 Personnel Capability
   3.5 Accountability
   3.6 Communication
   3.7 Use of Experience
   3.8 Work Planning and Control
   3.9 Control of Items, Processes, and Practices
   3.10 Verification
   3.11 Nonconformance
   3.12 Corrective Action
   3.13 Change Control
   3.14 Document Control
   3.15 Records
   3.16 Program Assessment
4 Requirements for Operating
   4.1 Operating Authority
   4.2 Operating Documents
   4.3 Work Control
   4.4 Equipment Control
   4.5 Operator Surveillance
   4.6 Operator Communication
   4.7 Radiological Safety
   4.8 Housekeeping
5 Requirements for Maintenance
   5.1 General Maintenance
   5.2 Maintenance Procedures
   5.3 Maintenance Planning
   5.4 Corrective Maintenance
   5.5 Preventive Maintenance
   5.6 Calibration of System Instrumentation
   5.7 Periodic Inspection
   5.8 Measuring and Testing Equipment
   5.9 Replacement Item Management
6 Requirements for Technical Support
   6.1 Plant Performance Monitoring
   6.2 Surveillance Testing
   6.3 Non-Standard Tests
   6.4 Operating Experience
   6.5 Design Changes
   6.6 Fuel Management
   6.7 Reactor Physics
7 Requirements for Chemistry Control
   7.1 Specifications
   7.2 Monitoring
   7.3 Data Evaluation
   7.4 Control of Chemicals
   7.5 Chemical Analyses
8 Requirements for Emergency Preparedness
   8.1 Emergency Classification
   8.2 Emergency Response Organization
   8.3 Emergency Plan
   8.4 Emergency Facilities, Equipment, and Resources
   8.5 Personnel Protection
   8.6 Public Information Program
   8.7 Evaluation of Emergency Program Effectiveness
Appendices
A - Supplementary Guidance for On-Site Quality Assurance
    (QA) Groups
B - Supplementary Guidance for Field Verification

Gives the requirements for a quality assurance program for the operational phase of a nuclear power plant.

DocumentType
Standard
Pages
53
PublisherName
Canadian Standards Association
Status
Superseded

CSA N285.0 : 2006 GENERAL REQUIREMENTS FOR PRESSURE-RETAINING SYSTEMS AND COMPONENTS IN CANDU NUCLEAR POWER PLANTS
CSA N286.2 : 0 DESIGN QUALITY ASSURANCE FOR NUCLEAR POWER PLANTS
CSA N286.7.1 : 2009 GUIDELINE FOR THE APPLICATION OF N286.7-99, QUALITY ASSURANCE OF ANALYTICAL, SCIENTIFIC, AND DESIGN COMPUTER PROGRAMS FOR NUCLEAR POWER PLANTS
CSA N290.13 : 2005 ENVIRONMENTAL QUALIFICATION OF EQUIPMENT FOR CANDU NUCLEAR POWER PLANTS
CSA N290.0 & N290.1 PACKAGE : 2013 CONSISTS OF N290.0-11, GENERAL REQUIREMENTS FOR SAFETY SYSTEMS OF NUCLEAR POWER PLANTS AND N290.1-13, REQUIREMENTS FOR THE SHUTDOWN SYSTEMS OF NUCLEAR POWER PLANTS
CSAN290.4 : 2011 REQUIREMENTS FOR REACTOR CONTROL SYSTEMS OF NUCLEAR POWER PLANTS
CSA N290.4:19 Requirements for reactor control systems of nuclear power plants
CSA N286.1 : 0 PROCUREMENT QUALITY ASSURANCE FOR NUCLEAR POWER PLANTS
CSA N290.0 & N290.3 PACKAGE : 2016 CONSISTS OF N290.0-11, GENERAL REQUIREMENTS FOR SAFETY SYSTEMS OF NUCLEAR POWER PLANTS AND N290.3-16, REQUIREMENTS FOR THE CONTAINMENT SYSTEM OF NUCLEAR POWER PLANTS
CSA N286.6 : 0 DECOMMISSIONING QUALITY ASSURANCE FOR NUCLEAR POWER PLANTS

CSA N286.4 : 0 COMMISSIONING QUALITY ASSURANCE FOR NUCLEAR POWER PLANTS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.