CLC/TS 61400-26-2:2017
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
View Superseded by
Wind turbines - Part 26-2: Production-based availability for wind turbines
08-26-2022
09-01-2017
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Information model
Annex A (informative) - Possible methods for the
determination of potential energy production
Annex B (informative) - Production-based
availability indicators - examples
Annex C (informative) - Capacity factor and other
performance indicators
Annex D (informative) - Verification scenarios - examples
Annex E (informative) - Considerations of competing
assignment of lost production
Bibliography
Annex ZA (normative) - Normative references to
international publications with their
corresponding European publications
IEC TS 61400-26-2:2014 provides a framework from which production-based performance indicators of a wind turbine generator system can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive performance indicators. The approach of this part of IEC 61400 is to expand the time allocation model, introduced in IEC TS 61400-26-1, with two additional layers for recording of the actual energy production and potential energy production associated with the concurrent time allocation. This document also includes informative annexes with:- examples of determination of lost production,- examples of algorithms for production-based indicators,- examples of other performance indicators,- examples of application scenarios.
Committee |
CLC/TC 88
|
DocumentType |
Technical Specification
|
PublisherName |
European Committee for Standards - Electrical
|
Status |
Withdrawn
|
SupersededBy |
Standards | Relationship |
IEC TS 61400-26-2:2014 | Identical |
NEN NVN CLC IEC/TS 61400-26-2 : 2017 | Identical |
CEI CLC/TS 61400-26-2 : 2018 | Identical |
S.R. CLC/TS 61400-26-2:2017 | Identical |
PD CLC/TS 61400-26-2:2017 | Identical |
UNE-CLC/TS 61400-26-2:2017 | Identical |
PNE-CLC/FprTS 61400-26-2:2017 | Identical |
VDE V 0127-26-2 : 2018 | Identical |
DIN CLC/TS 61400-26-2 : 2018 | Identical |
CLC/TS 61400-26-3:2017 | Wind energy generation systems - Part 26-3: Availability for wind power stations |
S.R. CLC/TS 61400-26-3:2017 | WIND ENERGY GENERATION SYSTEMS - PART 26-3: AVAILABILITY FOR WIND POWER STATIONS |
PD CLC/TS 61400-26-3:2017 | Wind energy generation systems Availability for wind power stations |
IEC 61400-12-1:2017 | Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines |
IEEE 762-2006 | IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity |
ISO 3977-9:1999 | Gas turbines — Procurement — Part 9: Reliability, availability, maintainability and safety |
IEC TS 61400-26-1:2011 | Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems |
IEC 61400-25-4:2016 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
IEC 61400-25-1:2017 | Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models |
IEC 61400-25-6:2016 | Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring |
CLC/TS 61400-26-1:2017 | Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems |
IEC 61400-25-3:2015 | Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
IEC 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
IEC 61400-1:2005+AMD1:2010 CSV | Wind turbines - Part 1: Design requirements |
IEC 61400-25-5:2017 | Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.