CLC/TS 50549-2:2015
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
View Superseded by
Requirements for generating plants to be connected in parallel with distribution networks - Part 2: Connection to a MV distribution network
03-10-2023
01-16-2015
Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Requirements on generating plants
5 Conformance test procedure
Annex A (informative) - Interconnection requirements
Annex B (informative) - Remote information exchange
Annex C (informative) - Frequency stabilizing services
Annex D (informative) - Loss of Mains and overall power
system security
Annex E (informative) - Examples of protection strategies
Annex F (normative) - Abbreviations
Bibliography
The purpose of this Technical Specification is to provide technical guidance on the requirements for generating plants which can be operated in parallel with a distribution network.For practical reasons, this Technical Specification refers to the distribution system operator in case settings have to be defined and/or provided, even when these settings are to be defined and/or provided by another actor according to national and European legal framework. NOTE 1This includes European network codes and their national implementation, as well as further national regulations.NOTE 2Further national requirements especially for the connection to the distribution network and the operation of the generating plant can apply.The requirements of this Technical Specification apply to all generating plants, electrical machinery and electronic equipment, irrespective of the kind of primary energy source and irrespective of the presence of loads in the producer’s network that meet all of the following conditions:-converting any primary energy source into AC electricity;-connected to a MV distribution network;-intended to operate in parallel with this distribution network under normal network operating conditions. NOTE 3Generating plants connected to a LV distribution network fall into the scope of EN 50438 (up to 16 A) and CLC/TS 50549-1 (above 16 A).Unless stated differently by the DSO, a generating plant with a maximum apparent power up to 100 kVA can, as alternative to the requirements of this Technical Specification, comply with CLC/TS 50549-1. A different threshold may be defined by the DSO.This Technical Specification defines connection requirements.This Technical Specification recognizes the existence of National Standards, Network Codes, and specific technical requirements of the DSOs. These should be complied with. Excluded from the scope are:-the selection and evaluation of the point of connection;-power system impact assessment;-connection assessment;-island operation of generating plants, both intentional and unintentional, where no part of the distribution network is involved;-active front ends of drives feeding energy back into the distribution network for short duration;-requirements for the safety of personnel as they are already adequately covered by existing European Standards.
Committee |
CLC/TC 8X
|
DocumentType |
Technical Specification
|
PublisherName |
European Committee for Standards - Electrical
|
Status |
Withdrawn
|
SupersededBy |
Standards | Relationship |
S.R. CLC/TS 50549-2:2015 | Identical |
NEN NPR CLC/TS 50549-2 : 2015 | Identical |
DIN CLC/TS 50549-2 : 2016 | Identical |
CEI CLC/TS 50549-2 : 2015 | Identical |
VDE V 0124-549-2 : 2016-07 | Identical |
PD IEC/TS 62786:2017 | Distributed energy resources connection with the grid |
17/30354643 DC : 0 | BS EN 62933-2-1 - ELECTRIC ENERGY STORAGE (ESS) SYSTEMS - PART 2-1: UNIT PARAMETERS AND TESTING METHODS - GENERAL SPECIFICATION |
IEC TS 62786:2017 | Distributed energy resources connection with the grid |
EN IEC 62933-2-1:2018 | Electrical energy storage (EES) systems - Part 2-1: Unit parameters and testing methods - General specification |
I.S. EN IEC 62933-2-1:2018 | ELECTRICAL ENERGY STORAGE (EES) SYSTEMS - PART 2-1: UNIT PARAMETERS AND TESTING METHODS - GENERAL SPECIFICATION |
IEC 62933-2-1:2017 | Electrical energy storage (EES) systems - Part 2-1: Unit parameters and testing methods - General specification |
EN 60044-2:1999/A2:2003 | INSTRUMENT TRANSFORMERS - PART 2: INDUCTIVE VOLTAGE TRANSFORMERS |
EN 50160 : 2010 AMD 1 2015 | VOLTAGE CHARACTERISTICS OF ELECTRICITY SUPPLIED BY PUBLIC ELECTRICITY NETWORKS |
IEC 60044-7:1999 | Instrument transformers - Part 7: Electronic voltage transformers |
EN 61000-4-30:2015/AC:2017-01 | ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS (IEC 61000-4-30:2015/COR1:2016) |
EN 61000-6-1:2007 | Electromagnetic compatibility (EMC) - Part 6-1: Generic standards - Immunity for residential, commercial and light-industrial environments |
IEC 61869-3:2011 | Instrument transformers - Part 3: Additional requirements for inductive voltage transformers |
EN 61000-6-3:2007/A1:2011/AC:2012 | ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 6-3: GENERIC STANDARDS - EMISSION STANDARD FOR RESIDENTIAL, COMMERCIAL AND LIGHT-INDUSTRIAL ENVIRONMENTS (IEC 61000-6-3:2006/A1:2010) |
IEC 61000-6-2:2016 | Electromagnetic compatibility (EMC) - Part 6-2: Generic standards - Immunity standard for industrial environments |
IEC 60044-2:1997+AMD1:2000+AMD2:2002 CSV | Instrument transformers - Part 2 : Inductive voltage transformers |
EN 60255-151:2009 | Measuring relays and protection equipment - Part 151: Functional requirements for over/under current protection |
IEC 60870-5-104:2006+AMD1:2016 CSV | Telecontrol equipment and systems - Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standardtransport profiles |
EN 61869-3 : 2011 | INSTRUMENT TRANSFORMERS - PART 3: ADDITIONAL REQUIREMENTS FOR INDUCTIVE VOLTAGE TRANSFORMERS (IEC 61869-3:2011) |
IEC TR 61000-3-13:2008 | Electromagnetic compatibility (EMC) - Part 3-13: Limits - Assessment of emission limits for the connection of unbalanced installations to MV, HV and EHV power systems |
IEC TR 61000-3-15:2011 | Electromagnetic compatibility (EMC) - Part 3-15: Limits - Assessment of low frequency electromagnetic immunity and emission requirements for dispersed generation systems in LV network |
EN 60870-5-101:2003/A1:2016 | TELECONTROL EQUIPMENT AND SYSTEMS - PART 5-101: TRANSMISSION PROTOCOLS - COMPANION STANDARD FOR BASIC TELECONTROL TASKS |
EN 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 60870-5-101:2003+AMD1:2015 CSV | Telecontrol equipment and systems - Part 5-101: Transmissionprotocols - Companion standard for basic telecontrol tasks |
EN 60870-5-104:2006/A1:2016 | TELECONTROL EQUIPMENT AND SYSTEMS - PART 5-104: TRANSMISSION PROTOCOLS - NETWORK ACCESS FOR IEC 60870-5-101 USING STANDARD TRANSPORT PROFILES (IEC 60870-5-104:2006/A1:2016) |
EN 60255-127:2014 | Measuring relays and protection equipment - Part 127: Functional requirements for over/under voltage protection |
IEC 61000-6-3:2006+AMD1:2010 CSV | Electromagnetic compatibility (EMC) - Part 6-3: Generic standards - Emission standard for residential, commercial and light-industrial environments |
EN 60044-7:2000 | Instrument transformers - Part 7: Electronic voltage transformers |
EN 61000-6-2:2005/corrigendum:2005 | ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 6-2: GENERIC STANDARDS - IMMUNITY FOR INDUSTRIAL ENVIRONMENTS (IEC 61000-6-2:2005) |
EN 61000-6-4:2007/A1:2011 | ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 6-4: GENERIC STANDARDS - EMISSION STANDARD FOR INDUSTRIAL ENVIRONMENTS |
IEC TR 61000-3-7:2008 | Electromagnetic compatibility (EMC) - Part 3-7: Limits - Assessment of emission limits for the connection of fluctuating installations to MV, HV and EHV power systems |
IEC 61850-7-420:2009 | Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
IEC 60255-127:2010 | Measuring relays and protection equipment - Part 127: Functional requirements for over/under voltage protection |
EN 62109-1 : 2010 | SAFETY OF POWER CONVERTERS FOR USE IN PHOTOVOLTAIC POWER SYSTEMS - PART 1: GENERAL REQUIREMENTS |
IEC 61000-6-1:2016 | Electromagnetic compatibility (EMC) - Part 6-1: Generic standards - Immunity standard for residential, commercial and light-industrial environments |
EN 61850-7-420:2009 | Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 62109-2:2011 | Safety of power converters for use in photovoltaic power systems - Part 2: Particular requirements for inverters |
IEC 60255-151:2009 | Measuring relays and protection equipment - Part 151: Functional requirements for over/under current protection |
IEC 61000-6-4:2006+AMD1:2010 CSV | Electromagnetic compatibility (EMC) - Part 6-4: Generic standards - Emission standard for industrial environments |
EN 62109-2:2011 | Safety of power converters for use in photovoltaic power systems - Part 2: Particular requirements for inverters |
IEC TR 61850-90-7:2013 | Communication networks and systems for power utility automation - Part 90-7: Object models for power converters in distributed energy resources (DER) systems |
IEC 62109-1:2010 | Safety of power converters for use in photovoltaic power systems - Part 1: General requirements |
IEC TR 61000-3-6:2008 | Electromagnetic compatibility (EMC) - Part 3-6: Limits - Assessment of emission limits for the connection of distorting installations to MV, HV and EHV power systems |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.