BS EN 61400-25-5:2017
Current
The latest, up-to-date edition.
Wind energy generation systems Communications for monitoring and control of wind power plants. Compliance testing
Hardcopy , PDF
English
01-03-2018
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Introduction to compliance testing
6 Device related compliance testing
7 Performance tests
Annex A (informative) - Examples of test procedure
template
Annex ZA (normative) - Normative references to
international publications with their
corresponding European publications
Defines standard techniques for testing of compliance of implementations, as well as specific measurement techniques to be applied when declaring performance parameters.
Committee |
PEL/88
|
DevelopmentNote |
Supersedes 05/30137813 DC. (05/2007) Supersedes 16/30347565 DC. (01/2018)
|
DocumentType |
Standard
|
Pages |
62
|
PublisherName |
British Standards Institution
|
Status |
Current
|
Supersedes |
IEC61400-25-5:2017 specifies standard techniques for testing of compliance of implementations, as well as specific measurement techniques to be applied when declaring performance parameters. The use of these techniques will enhance the ability of users to purchase systems that integrate easily, operate correctly, and support the applications as intended. This part of IEC61400-25 defines: the methods and abstract test cases for compliance testing of server and client devices used in wind power plants; the metrics to be measured in said devices according to the communication requirements specified in IEC61400-25 (all parts). This new edition includes the following significant technical changes with respect to the previous edition:
- harmonization with structure and test cases in IEC61850-10:2012;
- reduction of overlap between standards and simplification by increased referencing to the IEC61850 standard series.
Standards | Relationship |
NBN EN 61400-25-5 : 2007 | Identical |
I.S. EN 61400-25-5:2007 | Identical |
IEC 61400-25-5:2017 | Identical |
UNE-EN 61400-25-5:2007 | Identical |
CLC/TS 60034-31:2011 | Identical |
EN 61400-25-5:2017 | Identical |
EN 61850-6:2010 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
EN 61400-25-4:2017 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
EN 61850-7-2:2010 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI) |
EN 61850-10:2013 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEC 61400-25-4:2016 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
EN 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 61850-7-1:2011 | Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
EN 61850-7-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011) |
EN 61850-7-3:2011 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC 61400-25-1:2017 | Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models |
IEC 61850-4:2011 | Communication networks and systems for power utility automation - Part 4: System and project management |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
EN 61400-25-3:2015 | Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
IEC 61400-25-3:2015 | Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
IEC 61850-7-3:2010 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
EN 61850-4:2011 | Communication networks and systems for power utility automation - Part 4: System and project management |
IEC 61850-10:2012 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEC 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
EN 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.