BS EN 61375-2-2:2012
Current
The latest, up-to-date edition.
Electronic railway equipment. Train communication network (TCN) Wire Train Bus conformance testing
Hardcopy , PDF
English
08-31-2012
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions, Abbreviations, Conventions
4 Conformance test: approach, requirements
and boundaries
5 Conformance test of a WTB node, WTB trunk
cable, WTB jumper cables, WTB extension cables
6 Conformance test of RTP
7 Conformance test of a WTB-equipped consist
8 Conformance test of NM
Annex A (normative) - Test laboratory role
and client role
Annex B (informative) - Test instrumentation
and dedicated test bed
Bibliography
Annex ZA (normative) - Normative references
to international publications with their
corresponding European publications
Annex ZZ (informative) - Coverage of Essential
Requirements of EU Directives
Pertains to all equipment and devices implemented according to IEC 61375-2-1, i.e. it covers the procedures to be applied to such equipment and devices when the conformance should be proven.
Committee |
GEL/9/-/4
|
DevelopmentNote |
Supersedes 09/30205450 DC. (08/2012)
|
DocumentType |
Standard
|
Pages |
106
|
PublisherName |
British Standards Institution
|
Status |
Current
|
Supersedes |
This part of IEC 61375 applies to all equipment and devices implemented according to IEC 61375-2-1, i.e. it covers the procedures to be applied to such equipment and devices when the conformance should be proven.
The applicability of this standard to a TCN implementation allows for individual conformance checking of the implementation itself and is a pre-requisite for further interoperability checking between different TCN implementations.
NOTE For a definition of TCN implementation see IEC 61375-2-1,1.3.
Standards | Relationship |
EN 61375-2-2:2012 | Identical |
IEC 61375-2-2:2012 | Identical |
ISO/IEC 9646-7:1995 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 7: Implementation Conformance Statements |
UIC 556 : 5ED 2009 | INFORMATION TRANSMISSION IN THE TRAIN (TRAIN-BUS) |
ISO/IEC 9646-6:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 6: Protocol profile test specification |
ISO/IEC 9646-2:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 2: Abstract Test Suite specification |
ISO/IEC 9646-4:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 4: Test realization |
ISO/IEC 9646-5:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 5: Requirements on test laboratories and clients for the conformance assessment process |
EN 50155:2017 | Railway applications - Rolling stock - Electronic equipment |
IEC 61375-1:2012 | Electronic railway equipment - Train communication network (TCN) - Part 1: General architecture |
IEC 60571:2012 | Railway applications - Electronic equipment used on rolling stock |
IEC 61375-2-1:2012 | Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB) |
ISO/IEC 9646-1:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 1: General concepts |
EN 61375-2-1 : 2012 | ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK (TCN) - PART 2-1: WIRE TRAIN BUS (WTB) (IEC 61375-2-1:2012) |
ISO/IEC 9646-3:1998 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 3: The Tree and Tabular Combined Notation (TTCN) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.