BS EN 45510-6-1:1998
Current
The latest, up-to-date edition.
Guide for the procurement of power station equipment. Turbine auxiliaries Deaerators
Hardcopy , PDF
English
05-15-1998
Foreword
1 Scope
2 Normative references
3 Definitions
3.1 Organization terms
3.2 Technical terms
3.3 General terms
4 Brief overall project description
4.1 Role and organization of purchaser
4.2 Site location
4.3 Equipment task
4.4 Equipment to be purchased
4.5 Control and instrumentation
4.6 Electrical supplies and other services
4.7 Other interfaces
4.8 Project programme
4.9 Equipment identification systems
5 Extent of supply
6 Terminal points
7 Operational requirements
7.1 Operating environment
7.2 Manning levels
7.3 Normal operation
7.4 Operating hours
7.5 Start-up and shut-down
7.6 Abnormal conditions
7.7 Further operational requirements
8 Life expectancy
8.1 Design life
8.2 Components requiring periodic maintenance
9 Performance requirements
9.1 Duty
9.2 Performance
9.3 Equipment margins
9.4 Availability
9.5 Levels of component redundancy
9.6 Further performance requirements
10 Design and fabrication
10.1 Specific equipment features
10.2 Design justification
10.3 Material selection
10.4 Safety
10.5 Interchangeability
10.6 Fabrication methods
11 Maintenance requirements
11.1 Planned maintenance
11.2 Personnel safety
11.3 Requirements for access
11.4 Lifting requirements
11.5 Special tools
11.6 Test equipment
11.7 Spare parts strategy
11.8 Special precautions
12 Technical documentation requirements
12.1 Tender documentation
12.2 Contract documentation
13 Applicable legislation, regulations, standards and
further requirements
13.1 Legislation and regulations
13.2 Standards
13.3 Further requirements
14 Evaluation criteria
14.1 General
14.2 Technical criteria
15 Quality measures
15.1 General
15.2 Approvals procedure
15.3 Inspection requirements
15.4 Non-conformity
16 Site factors
16.1 Access
16.2 Facilities
16.3 Site specific requirements
17 Verification of specified performance
17.1 General
17.2 Works tests
17.3 Test during installation and commissioning
17.4 Technical conditions for trial run
17.5 Functional and performance tests
Annex A (informative) Bibliography
Provides guidance for writing the technical specification for procuring deaerators in association with steam generating plant and steam turbine plant to be used in electricity generating stations. Does not apply for equipment to be used in the nuclear reactor plant area of power stations.
Committee |
PEL/99
|
DevelopmentNote |
Reviewed and confirmed by BSI, January 2005. (12/2004) Supersedes 94/713072 DC. (09/2005)
|
DocumentType |
Standard
|
Pages |
18
|
PublisherName |
British Standards Institution
|
Status |
Current
|
Supersedes |
Standards | Relationship |
EN 45510-6-1:1998 | Identical |
I.S. EN 45510-6-1:1998 | Identical |
NEN EN 45510-6-1 : 1998 | Identical |
SN EN 45510-6-1 : 1998 | Identical |
UNE-EN 45510-6-1:1999 | Identical |
NS EN 45510-6-1 : 1ED 1998 | Identical |
EN 45510-6-1 : 1998 | Identical |
NF EN 45510-6-1 : 1998 | Identical |
DIN EN 45510-6-1:1998-06 | Identical |
EN 45510-8-1:1998 | Guide for procurement of power station equipment - Part 8-1: Control and instrumentation |
EN ISO 9002:1994/AC:1997 | QUALITY SYSTEMS - SPECIFICATION FOR PRODUCTION AND INSTALLATION |
ISO 8402:1994 | Quality management and quality assurance — Vocabulary |
EN 45510-8-1:1998 | GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 8-1: CONTROL AND INSTRUMENTATION |
ISO 9002:1994 | Quality systems — Model for quality assurance in production, installation and servicing |
EN ISO 9001:2015 | Quality management systems - Requirements (ISO 9001:2015) |
ISO 9001:2015 | Quality management systems — Requirements |
EN ISO 8402 : 1995 | QUALITY MANAGEMENT AND QUALITY ASSURANCE - VOCABULARY |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.