ASHRAE GUIDELINE 1.2 : 2019
Current
The latest, up-to-date edition.
Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies
Hardcopy , PDF
English, Spanish, Castilian
01-07-2019
This guideline applies to the procedures, methods, and documentation requirements for each phase of the Commissioning (Cx) Process applied to existing HVAC&R systems and assemblies, including: a. Development of facility goals and Current Facility Requirements (CFR) b. Discovery and evaluation of available documentation for existing HVAC&R systems c. Evaluation of the condition of existing HVAC&R systems d. Development of a prioritized Cx Plan, including schedule and budget estimates e. Development of recommendations f. Implementation of recommendations g. Verification of completed recommendations h. Development of Systems Manual i. Training of facility personnel j. Development of Cx Reports k. Ongoing commissioning (OCx) activities 2.2 This guideline focuses on the following: a. Energy use b. Operations and Maintenance (O&M) c. Indoor Environmental Quality (IEQ)
DocumentType |
Standard
|
Pages |
70
|
ProductNote |
This product is unavailable in Russia, Belarus, Ukraine
|
PublisherName |
American Society of Heating, Refrigerating & Air Conditioning Engineers
|
Status |
Current
|
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.