API RP 1175 & COMPANION GUIDE BUNDLE : 1ED 2017
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
RECOMMENDED PRACTICE FOR PIPELINE LEAK DETECTION - PROGRAM MANAGEMENT, AND COMPANION GUIDE BUNDLE
06-15-2022
07-01-2017
1 Scope
2 Normative References
3 Terms, Definitions, Acronyms, and Abbreviations
4 Leak Detection Program
5 Leak Detection Culture and Strategy
6 Selection of Leak Detection Methods
7 Performance Targets, Metrics, and KPIs
8 Testing
9 Control Center Procedures for Recognition and Response
10 Alarm Management
11 Roles, Responsibilities, and Training
12 Reliability Centered Maintenance (RCM) for Leak Detection
Equipment
13 Overall Performance Evaluation of the LDP
14 Management of Change (MOC)
15 Improvement Process
Annex A (informative) - Risk Assessment
Annex B (informative) - Developing a List of Selection
Criteria
Annex C (informative) - Factors Affecting Performance
Annex D (informative) - Example of Performance Metrics
and Targets
Annex E (informative) - Roles in the Use of the LDSs
Annex F (informative) - Example Training Program
Bibliography
Describes a framework for Leak Detection Program (LDP) management for hazardous liquid pipelines that are jurisdictional to the U.S. Department of Transportation (specifically, 49 CFR Part 195).
DevelopmentNote |
Supersedes API RP 1175. (04/2018)
|
DocumentType |
Standard
|
ProductNote |
This product is unavailable in Cuba, Iran, North Korea, Syria
|
PublisherName |
American Petroleum Institute
|
Status |
Superseded
|
SupersededBy |
ISO 31000:2009 | Risk management Principles and guidelines |
API RP 1167 : 2016 | PIPELINE SCADA ALARM MANAGEMENT |
CAN/CSA-Z662-15 | Oil and gas pipeline systems |
API RP 754 : 2016 | PROCESS SAFETY PERFORMANCE INDICATORS FOR THE REFINING AND PETROCHEMICAL INDUSTRIES |
API 581 : 2016 | RISK-BASED INSPECTION METHODOLOGY |
CFR 49(PTS186-199) : 0 | TRANSPORTATION |
API 580 : 2016 | RISK-BASED INSPECTION |
API TR 1149 : 2015 | PIPELINE VARIABLE UNCERTAINTIES AND THEIR EFFECTS ON LEAK DETECTABILITY |
API 1161 : 2014 | RECOMMENDED PRACTICE FOR PIPELINE OPERATOR QUALIFICATION (OQ) |
API RP 1168 : 2015 | PIPELINE CONTROL ROOM MANAGEMENT |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.