BS EN 62270 - GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION
Hardcopy , PDF
English
1 Overview
2 Definitions
3 System architecture
4 Control Functions
5 Data acquisition and processing
6 Communications and data bases
7 User and plant interfaces
8 System performance
9 System backup capabilities
10 Site integration and support systems
11 Recommended test and acceptance criteria
12 System management
Annex A (informative) - Bibliography
Annex B (informative) - Legacy Control Systems
BS EN 62270.
Committee |
MCE/15
|
DocumentType |
Draft
|
Pages |
74
|
PublisherName |
British Standards Institution
|
Status |
Current
|
IEC 60050-351:2013 | International Electrotechnical Vocabulary (IEV) - Part 351: Control technology |
IEC 60870-5-102:1996 | Telecontrol equipment and systems - Part 5: Transmission protocols - Section 102: Companion standard for the transmission of integrated totals in electric power systems |
IEC 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
IEEE 1615-2007 | IEEE Recommended Practice for Network Communication in Electric Power Substations |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEEE 610.12-1990 | IEEE Standard Glossary of Software Engineering Terminology |
IEC 61000-4-1:2006 | Electromagnetic compatibility (EMC) - Part 4-1: Testing and measurement techniques - Overview of IEC 61000-4 series |
IEC 61131-3:2013 | Programmable controllers - Part 3: Programming languages |
IEC 61850-7-410:2012+AMD1:2015 CSV | Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control |
IEC 61131-1:2003 | Programmable controllers - Part 1: General information |
IEC 60870-2-1:1995 | Telecontrol equipment and systems - Part 2: Operating conditions - Section 1: Power supply and electromagnetic compatibility |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEEE 802.3-2012 | IEEE Standard for Ethernet |
IEC 60870-5-104:2006+AMD1:2016 CSV | Telecontrol equipment and systems - Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standardtransport profiles |
IEC 60870-5-103:1997 | Telecontrol equipment and systems - Part 5-103: Transmission protocols - Companion standard for the informative interface of protection equipment |
IEC 60870-2-2:1996 | Telecontrol equipment and systems - Part 2: Operating conditions -Section 2: Environmental conditions (climatic, mechanical and othernon electrical influences) |
IEEE 1248-1998 | IEEE Guide for the Commissioning of Electrical Systems in Hydroelectric Power Plants |
IEC 60870-3:1989 | Telecontrol equipment and systems. Part 3: Interfaces (electrical characteristics) |
IEC 60308:2005 | Hydraulic turbines - Testing of control systems |
IEC 60870-4:1990 | Telecontrol equipment and systems. Part 4: Performance requirements |
IEC 60870-1-2:1989 | Telecontrol equipment and systems. Part 1: General considerations. Section Two: Guide for specifications |
IEC 60870-5-101:2003+AMD1:2015 CSV | Telecontrol equipment and systems - Part 5-101: Transmissionprotocols - Companion standard for basic telecontrol tasks |
IEC 61850-7-1:2011 | Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
IEEE 1207-2011 | IEEE Guide for the Application of Turbine Governing Systems for Hydroelectric Generating Units |
IEC 61850-4:2011 | Communication networks and systems for power utility automation - Part 4: System and project management |
IEC 61000-4-3:2006+AMD1:2007+AMD2:2010 CSV | Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity test |
IEEE C37.90.2:2004 | WITHSTAND CAPABILITY OF RELAY SYSTEMS TO RADIATED ELECTROMAGNETIC INTERFERENCE FROM TRANSCEIVERS |
IEEE C37.90.1-2012 | IEEE Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 61850-7-3:2010 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC 61131-2:2017 | Industrial-process measurement and control - Programmable controllers - Part 2: Equipment requirements and tests |
IEC 61362:2012 | Guide to specification of hydraulic turbine governing systems |
IEC 60870-5-1:1990 | Telecontrol equipment and systems. Part 5: Transmission protocols - Section One: Transmission frame formats |
IEC 61850-10:2012 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEEE 946-2004 | IEEE Recommended Practice for the Design of DC Auxiliary Power Systems for Generating Systems |
IEEE 485-2010 | IEEE Recommended Practice for Sizing Lead-Acid Batteries for Stationary Applications |
IEC 61850-3:2013 | Communication networks and systems for power utility automation - Part 3: General requirements |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.