11/30203837 DC : 0
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
BS 8534 - CONSTRUCTION PROCUREMENT POLICIES, STRATEGIES AND PROCEDURES - CODE OF PRACTICE
Hardcopy , PDF
English
08-31-2011
Foreword
0 Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Policy
5 Initiation
6 Procurement strategy
7 Procurement tactics
Annex A (informative) - Recommended reading
Annex B (informative)
Bibliography
BS 8534
| Committee |
CB/500
|
| DocumentType |
Draft
|
| Pages |
49
|
| PublisherName |
British Standards Institution
|
| Status |
Superseded
|
| SupersededBy |
| PD CEN/TR 13833:2003 | Qualification of construction enterprises |
| ISO 10845-6:2011 | Construction procurement — Part 6: Participation of targeted partners in joint ventures in contracts |
| BS EN ISO 9001:2015 | Quality management systems. Requirements |
| BS 8903:2010 | Principles and framework for procuring sustainably. Guide |
| ISO 10845-8:2011 | Construction procurement — Part 8: Participation of targeted labour in contracts |
| BS ISO 10845-2:2011 | Construction procurement Formatting and compilation of procurement documentation |
| BS 7000-6:2005 | Design management systems Managing inclusive design. Guide |
| BS EN 13269:2006 | Maintenance. Guideline on preparation of maintenance contracts |
| BS ISO 15686-5:2017 | Buildings and constructed assets. Service life planning Life-cycle costing |
| BS 7000-5:2001 | Design management systems Design management systems. Guide to managing obsolescence |
| BS 7832:1995 | Performance standards in building. Checklist for briefing. Contents of brief for building design |
| BS 31100:2008 | RISK MANAGEMENT - CODE OF PRACTICE |
| ISO 10845-5:2011 | Construction procurement — Part 5: Participation of targeted enterprises in contracts |
| PD 156865:2008 | Standardized method of life cycle costing for construction procurement. A supplement to BS ISO 15686-5. Buildings and constructed assets. Service life planning. Life cycle costing |
| ISO 10845-7:2011 | Construction procurement — Part 7: Participation of local enterprises and labour in contracts |
| ISO 10845-3:2011 | Construction procurement — Part 3: Standard conditions of tender |
| BS 7000-10:1995 | Design management systems Glossary of terms used in design management |
| BS EN 15221-2:2006 | Facility management Guidance on how to prepare facility management agreements |
| BS ISO 10845-1:2010 | Construction procurement Processes, methods and procedures |
| ISO 10845-4:2011 | Construction procurement — Part 4: Standard conditions for the calling for expressions of interest |
| BS EN 12973:2000 | Value Management |
| BS 8536:2010 | Facility management briefing. Code of practice |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.