10305-8
Current
The latest, up-to-date edition.
Safe Work Method Statement - Wood Chipper Operation SWMS 10305-8
Word
English
09-01-2020
This Safe Work Method Statement (SWMS) covers hazards and controls associated with the operation of a wood chipper. This SWMS covers High-Risk Construction Work (HRCW) controls related to:
Mobile plant movement
Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks & Environmental Considerations.
DocumentType |
Standard
|
Pages |
10
|
ProductNote |
Wood Chipper Operation SWMS - written by SafetyCulture Pty Ltd
It is a Word DOC, not a PDF so you can add logos, change colours and add or delete information as needed. It contains commonly encountered safety aspects and is not a blank template. You should add your company details, ABN and include your site specific details or risks to make it specific to the job at hand. You can then print it for incorporation into your overall OHS system, as well for inductions, toolbox talks or tender applications. Note you will require MS Word to use this template. |
PublisherName |
SafetyCulture Pty Ltd
|
Status |
Current
|
SupersededBy |
Job Steps Covered in Wood Chipper Operation SWMS:
(includes potential hazards & control measures)
Training
Planning
Working Outdoors
Delivery & Removal of the Chipper
Arrival On-site & Assess On-site Conditions
Work Area Set-up
Environment
Housekeeping
Manual Tasks
Pre-start Check
Woodchipper Operation
Moving the Chipper On-site
Fuelling On-site
On Completion
Emergency Response
Version 8
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.