09/30205450 DC : 0
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
BS EN 61375-2-2 - ELECTRONIC RAILWAY EQUIPMENT - TRAIN COMMUNICATION NETWORK - PART 2-2: WTB - WIRE TRAIN BUS CONFORMANCE TESTING
Hardcopy , PDF
08-31-2012
English
1 General
1.1 Scope
1.2 Normative references
1.3 Terms and definitions
1.4 Abbreviations
2 Conformance test: approach, requirements and boundaries
2.1 The approach
2.2 Boundaries
2.3 Conformance assessment process outline
3 Conformance test of a WTB node, WTB trunk cable, WTB
jumper cables, WTB extension cables
3.1 PICS
4 Conformance test of RTP
4.1 Ports and Traffic_Store
4.2 Dataset consistency
4.3 Port_Address
4.4 Link_Process_Data_Interface primitives
4.5 Messages services and protocols
5 Conformance test of a WTB-equipped consist
5.1 General
5.2 PICS
5.3 Test suites
5.4 Consist network interoperability test
5.5 Application profile
5.6 Several nodes on the consist
6 Conformance test of NM
Annex A (normative) - Test laboratory role and client role
A.1 Test laboratory and client role
A.1.1 General
A.1.2 Overview
A.2 Preparation for testing
A.2.1 General administrative steps
A.2.2 Agreement on test methods and selection of test suites
A.2.3 Exchange of documentation for conformance assessment
A.3 Test operation
A.3.1 Static conformance review
A.3.2 Selection of test cases and test parameterisation
A.3.3 Test campaign
A.4 Production of test reports
A.4.1 IUT conformance test report
A.4.2 Protocol conformance test report
Annex B (informative) - Test instrumentation and dedicated
test bed
B.1 Test instrumentation
B.1.1 Standard instrumentation
B.1.2 Test bed architecture
B.1.3 Coach tester specification
B.1.4 Physical tests
Bibliography
BS EN 61375-2-2
Committee |
GEL/9/2
|
DocumentType |
Draft
|
Pages |
98
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy |
ISO/IEC 9646-7:1995 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 7: Implementation Conformance Statements |
ISO/IEC 9646-6:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 6: Protocol profile test specification |
ISO/IEC 9646-2:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 2: Abstract Test Suite specification |
ISO/IEC 9646-4:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 4: Test realization |
ISO/IEC 9646-5:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 5: Requirements on test laboratories and clients for the conformance assessment process |
IEC 60571:2012 | Railway applications - Electronic equipment used on rolling stock |
IEC 61375-2-1:2012 | Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB) |
ISO/IEC 9646-1:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 1: General concepts |
ISO/IEC 9646-3:1998 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 3: The Tree and Tabular Combined Notation (TTCN) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.