• Shopping Cart
    There are no items in your cart
Please Select Your Option.
It seems you are away from your “home” country. Do you wish to be re-directed to your “home” store? If you choose “YES”, you will see product, taxation, and shipping information relevant to your country. If you select “NO”, the current store's conditions will apply.
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

IEC 62439-4:2010

Current

Current

The latest, up-to-date edition.

Industrial communication networks - High availability automation networks - Part 4: Cross-network Redundancy Protocol (CRP)

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Published date

26-02-2010

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions, abbreviations, acronyms, and
  conventions
4 CRP overview
5 CRP nodes
6 CRP LAN topology
7 CRP key components
8 CRP protocol
9 CRP Management Information Base (MIB)
Bibliography

IEC 62439-4:2010 is applicable to high-availability automation networks based on the ISO/IEC 8802-3 (IEEE 802.3) (Ethernet) technology. It specifies a redundancy protocol that is based on the duplication of the network, the redundancy protocol being executed within the end nodes, as opposed to a redundancy protocol built in the switches. The switchover decision is taken in each node individually. The cross-network connection capability enables single attached end nodes to be connected on either of the two networks. It cancels and replaces IEC 62439 published in 2008 and constitutes a technical revision. It includes the following significant technical changes with respect to IEC 62439 (2008):
- adding a calculation method for RSTP (rapid spanning tree protocol, IEEE 802.1Q),
- adding two new redundancy protocols: HSR (High-availability Seamless Redundancy) and DRP (Distributed Redundancy Protocol),
- moving former Clauses 1 to 4 (introduction, definitions, general aspects) and the Annexes (taxonomy, availability calculation) to IEC 62439-1, which serves now as a base for the other documents,
- moving Clause 5 (MRP) to IEC 62439-2 with minor editorial changes,
- moving Clause 6 (PRP) was to IEC 62439-3 with minor editorial changes,
- moving Clause 7 (CRP) was to IEC 62439-4 with minor editorial changes, and
- moving Clause 8 (BRP) was to IEC 62439-5 with minor editorial changes,
- adding a method to calculate the maximum recovery time of RSTP in a restricted configuration (ring) to IEC 62439-1 as Clause 8,
- adding specifications of the HSR (High-availability Seamless Redundancy) protocol, which shares the principles of PRP to IEC 62439-3 as Clause 5, and
- introducing the DRP protocol as IEC 62439-6.

This publication is to be read in conjunction with IEC 62439-1:2010.

Committee
TC 65/SC 65C
DevelopmentNote
Supersedes IEC 62439. To be read in conjunction with IEC 62439-1. (03/2010) A Bilingual edition has been published. (12/2012) Stability Date: 2020. (09/2017)
DocumentType
Standard
Pages
49
PublisherName
International Electrotechnical Committee
Status
Current
Supersedes

BS EN 62439-5:2010 Industrial communication networks. High availability automation networks Beacon redundancy protocol (BRP)
BS EN 62439-6:2010 Industrial communication networks. High availability automation networks Distributed redundancy protocol (DRP)
EN 61162-460:2015 Maritime navigation and radiocommunication equipment and systems - Digital interfaces - Part 460: Multiple talkers and multiple listeners - Ethernet interconnection - Safety and security
EN 62439-6:2010 Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP)
I.S. EN 62439-6:2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 6: DISTRIBUTED REDUNDANCY PROTOCOL (DRP)
BS EN 62439-1 : 2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS
14/30297254 DC : 0 BS EN 62439-X - INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS
I.S. EN 62439-5:2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 5: BEACON REDUNDANCY PROTOCOL (BRP)
16/30346333 DC : 0 BS EN 61162-460 - MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS -DIGITAL INTERFACES - PART 460: MULTIPLE TALKERS AND MULTIPLE LISTENERS - ETHERNET INTERCONNECTION - SAFETY AND SECURITY
I.S. EN 61162-460:2015 MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS - DIGITAL INTERFACES - PART 460: MULTIPLE TALKERS AND MULTIPLE LISTENERS - ETHERNET INTERCONNECTION - SAFETY AND SECURITY
I.S. EN IEC 62439-5:2018 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 5: BEACON REDUNDANCY PROTOCOL (BRP)
EN IEC 62439-5:2018 Industrial communication networks - High availability automation networks - Part 5: Beacon Redundancy Protocol (BRP)
IEC 62439-1:2010+AMD1:2012+AMD2:2016 CSV Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods
EN 62439-1:2010/A2:2017 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS (IEC 62439-1:2010/A2:2016)
BS EN 61162-460:2015 Maritime navigation and radiocommunication equipment and systems. Digital interfaces Multiple talkers and multiple listeners. Ethernet interconnection. Safety and security
CEI EN 62439-2 : 2011 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 2: MEDIA REDUNDANCY PROTOCOL (MRP)
I.S. EN 62439-1:2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS
IEC 62439-5:2016 Industrial communication networks - High availability automation networks - Part 5: Beacon Redundancy Protocol (BRP)
IEC 62439-6:2010 Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP)
BS EN 62439-3:2012 Industrial communication networks. High availability automation networks Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)
CEI EN 62439-5 : 2011 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 5: BEACON REDUNDANCY PROTOCOL (BRP)

IEC 62439-3:2016 Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)
ISO/IEC 8802-3:2000 Information technology Telecommunications and information exchange between systems Local and metropolitan area networks Specific requirements Part 3: Carrier sense multiple access with collision detection (CSMA/CD) access method and physical layer specifications
IEC 62439-5:2016 Industrial communication networks - High availability automation networks - Part 5: Beacon Redundancy Protocol (BRP)
IEC 62439-1:2010+AMD1:2012+AMD2:2016 CSV Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods
IEC 62439-6:2010 Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP)
IEC 62439-2:2016 Industrial communication networks - High availability automation networks - Part 2: Media Redundancy Protocol (MRP)

£256.35
Excluding VAT

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.