Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

ISA 77.13.01 : 1999 : R2008

Current

Current

The latest, up-to-date edition.

FOSSIL FUEL POWER PLANT STEAM TURBINE BYPASS SYSTEM

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2008

$132.59
Including GST where applicable

1 Scope<br>2 Purpose<br>3 Definitions<br>4 Bypass Systems<br>&nbsp;&nbsp;4.1 General requirements<br>&nbsp;&nbsp;4.2 Elements<br>&nbsp;&nbsp;4.3 Capacity<br>&nbsp;&nbsp;4.4 Design requirements<br>&nbsp;&nbsp;4.5 Turbine bypass instrumentation<br>&nbsp;&nbsp;4.6 Control and logic requirements<br>&nbsp;&nbsp;4.7 Alarm requirements<br>&nbsp;&nbsp;4.8 Operator interface<br>Annex A - References<br>Annex B - The use of bypass systems<br>Annex C - Valve life expectancy<br>Annex D - Some typical high- and low-pressure turbine bypass <br>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;valve <br>Annex E - Figures

Describes the design requirements and operator interface for steam turbine bypass systems for drum and once-through steam generators and combined cycle plants.

Committee
SP77
DevelopmentNote
Formerly it was ISA-S77.13.01 (05/2001)
DocumentType
Standard
Pages
42
ProductNote
Reconfirmed 2008
PublisherName
International Society of Automation
Status
Current

FCI 70-2 : 2013 CONTROL VALVE SEAT LEAKAGE
MSS SP 61 : 2013 PRESSURE TESTING OF VALVES
ISA 51.1 : 1979 PROCESS INSTRUMENTATION TERMINOLOGY
ISA 5.1 : 1984 INSTRUMENTATION SYMBOLS AND IDENTIFICATION

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.