Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

DEFSTAN 00-251(PT2)/1(2016) : 2016

Current

Current

The latest, up-to-date edition.

HUMAN FACTORS INTEGRATION FOR DEFENCE SYSTEMS - PART 2: HUMAN FACTORS INTEGRATION PROCESS REQUIREMENTS FOR THE SOLUTION PROVIDER

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

05-02-2016

Free

Foreword
0 Introduction
1 Scope and Applicability
2 Warning
3 Normative References
4 Abbreviations
5 The Human Factors Process Requirements
6 The HF Process Requirements
7 Tailoring the HFI Process

Gives the HF Process Requirements to be applied to all MOD projects that contain a human element. It focuses on those activities to be conducted by the Solution Provider from the Assessment phase of the Concept, Assessment Demonstration, Manufacture, In-Service, Disposal (CADMID) lifecycle onwards.

DevelopmentNote
Supersedes DEFSTAN 00-250(PT2)/1(2008) & DEFSTAN 00-250(PT4)/1(2008). (03/2016) Supersedes DEFSTAN 00-25(PT14)/1(2000). (05/2016)
DocumentType
Standard
Pages
20
PublisherName
UK Ministry of Defence Standards
Status
Current
Supersedes

DEFSTAN 21-59/3(2018):2018 Systems Engineering Guide for Naval Combat Systems
DEFSTAN 23-009(PT0)/4(2016) : 2016 GENERIC VEHICLE ARCHITECTURE (GVA) - PART 0: GVA APPROACH
DEFSTAN 00-006/8(2017) : 2017 FORDING AND FLOTATION REQUIREMENTS FOR COMBAT AND SUPPORT GROUND VEHICLES

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.