DEFSTAN 00-251(PT2)/1(2016) : 2016
Current
The latest, up-to-date edition.
HUMAN FACTORS INTEGRATION FOR DEFENCE SYSTEMS - PART 2: HUMAN FACTORS INTEGRATION PROCESS REQUIREMENTS FOR THE SOLUTION PROVIDER
Hardcopy , PDF
English
02-05-2016
Foreword
0 Introduction
1 Scope and Applicability
2 Warning
3 Normative References
4 Abbreviations
5 The Human Factors Process Requirements
6 The HF Process Requirements
7 Tailoring the HFI Process
Gives the HF Process Requirements to be applied to all MOD projects that contain a human element. It focuses on those activities to be conducted by the Solution Provider from the Assessment phase of the Concept, Assessment Demonstration, Manufacture, In-Service, Disposal (CADMID) lifecycle onwards.
DevelopmentNote |
Supersedes DEFSTAN 00-250(PT2)/1(2008) & DEFSTAN 00-250(PT4)/1(2008). (03/2016) Supersedes DEFSTAN 00-25(PT14)/1(2000). (05/2016)
|
DocumentType |
Standard
|
Pages |
20
|
PublisherName |
UK Ministry of Defence Standards
|
Status |
Current
|
Supersedes |
DEFSTAN 21-59/3(2018):2018 | Systems Engineering Guide for Naval Combat Systems |
DEFSTAN 23-009(PT0)/4(2016) : 2016 | GENERIC VEHICLE ARCHITECTURE (GVA) - PART 0: GVA APPROACH |
DEFSTAN 00-006/8(2017) : 2017 | FORDING AND FLOTATION REQUIREMENTS FOR COMBAT AND SUPPORT GROUND VEHICLES |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.