PD 6638:2000
Withdrawn
PNO-ISC specification number 003. C7 interconnect signalling connection control part (SCCP)
Hardcopy , PDF
English
12-15-2000
11-15-2002
0.3 Contents
0 PREFACE
0.1 Title
0.2 Normative Information
0.3 Contents
0.4 History
0.5 Issue Control
0.6 References
0.7 Glossary of terms
0.7.1 Abbreviations
0.7.2 Definitions
0.8 Scope
0.9 Treatment Of Items 'Not Required' or 'Shall Not
Be Sent'
1 FUNCTIONAL DESCRIPTION OF THE SCCP
2 DEFINITION AND FUNCTION OF SCCP MESSAGES
3 SCCP FORMATS AND CODES
4 SCCP PROCEDURES
5 SCCP PERFORMANCE
Specifies the requirements of the Signalling Connection Control Part that are standardised for use across a UK national interconnect between Public Networks.
| Committee |
TCT/001
|
| DocumentType |
Standard
|
| Pages |
20
|
| PublisherName |
British Standards Institution
|
| Status |
Withdrawn
|
| Supersedes |
| PD 6623:2002 | PNO-ISC Specification Number 007 ISDN User Part (ISUP) |