ASTM E 2675 : 2009
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Standard Practice for Property Management System Outcomes
Hardcopy , PDF
11-11-2014
English
02-01-2009
CONTAINED IN VOL. 04.12, 2017 Defines expected outcomes associated with a property management system.
Committee |
E 53
|
DocumentType |
Standard Practice
|
Pages |
7
|
ProductNote |
Reconfirmed 2009
|
PublisherName |
American Society for Testing and Materials
|
Status |
Superseded
|
SupersededBy |
1.1 This practice describes expected outcomes associated with a property management system. It is a measure of achievement rather than process, and is descriptive rather than prescriptive.
1.2 Outcomes are defined as information, events, objects, or states of being produced as a result or consequence of a plan, process, accident, effort, or other similar action or occurrence.
1.3 An output measure is the tabulation, calculation, or recording of activity or effort and can be expressed in a quantitative or qualitative manner.
1.4 An outcome measure is an assessment of the results of a program activity compared to its intended purpose.
1.5 Consistent with Practice E 2452
1.5.1 Although they may be directly related, strategies and tactics should not be confused with outcomes. Strategies are long-term plans of action designed to achieve a particular goal. Tactics are maneuvers or actions calculated to achieve some end. For example, increasing exercise is a strategy to attain the goal or outcome of fitness. Running is a supporting tactic to achieve the goal or outcome of fitness. Other tactics or groups of tactics may achieve the same outcome. On the other hand, as the definition of outcome indicates, tactics are not required for attaining outcomes. For example, fitness may be an unplanned result of a job requiring physical exertion.
1.6 This practice describes the outcomes at a high level, with limited discussion of each outcome or components of each outcome. The intent is to provide a framework for current and potential additional standards. A cross reference relating current standards to the outcomes is provided in Section 5.
1.7 The outcomes further described in Section 5, are listed in the following:
1.7.1 Process Management Outcomes:
1.7.1.1 Outcome 1—Mission Support
1.7.1.2 Outcome 2—Accounting and Accountability
1.7.1.3 Outcome 3—Information Management
1.7.1.4 Outcome 4—Planning
1.7.1.5 Outcome 5—Relationships
1.7.2 Operational Outcomes:
1.7.2.1 Outcome 6—Property Functionality
1.7.2.2 Outcome 7—Resource Optimization
1.7.2.3 Outcome 8—Property Visibility
1.7.2.4 Outcome 9—Safety and Security
1.7.2.5 Outcome 10—Installation, Movement, and Storage
1.8 In Section 5, a rating scale is provided to quantify in a uniform manner achievement of outcomes and outcome components.
1.9 This practice, in combination with Practice E 2279
1.10 This practice is intended to be applicable and appropriate for all property-holding entities.
1.11 This practice covers tangible property as defined in Terminology E 2135
1.12 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
ASTM E 2135 : 2010 : REV A : R2017 : EDT 1 | Standard Terminology for Property and Asset Management |
ASTM E 3035 : 2015 | Standard Classification for Facility Asset Component Tracking System (FACTS) |
ASTM E 2858 : 2012 | Standard Practice for Sales of Personal Property |
ASTM E 2379 : 2004 | Standard Practice for Property Management for Career Development and Training (Withdrawn 2013) |
ASTM E 2221 : 2002 | Standard Practice for Administrative Control of Property (Withdrawn 2011) |
ASTM E 2132 : 2017 : REDLINE | Standard Practice for Inventory Verification: Electronic and Physical Inventory of Assets |
ASTM E 2279 : 2015 | Standard Practice for Establishing the Guiding Principles of Property Asset Management |
ASTM E 2131 : 2016 : REDLINE | Standard Practice for Addressing and Reporting Losses of Tangible Property |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.