API SECURITY VULNERABILITY ASSESSMENT : 2004
Withdrawn
SECURITY VULNERABILITY ASSESSMENT - METHODOLOGY FOR THE PETROLEUM AND PETROCHEMICAL INDUSTRIES
10-01-2004
01-29-2024
CHAPTER 1 - INTRODUCTION
1.1 INTRODUCTION TO SECURITY VULNERABILITY ASSESSMENT
1.2 OBJECTIVES, INTENDED AUDIENCE AND SCOPE OF THE GUIDANCE
1.3 SECURITY VULNERABILITY ASSESSMENT AND SECURITY MANAGEMENT
PRINCIPLES
CHAPTER 2 - SECURITY VULNERABILITY ASSESSMENT CONCEPTS
2.1 INTRODUCTION TO SVA TERMS
2.2 RISK DEFINITION FOR SVA
2.3 CONSEQUENCES
2.4 ASSET ATTRACTIVENESS
2.5 THREAT
2.6 VULNERABILITY
2.7 SVA APPROACH
2.8 CHARACTERISTICS OF A SOUND SVA APPROACH
2.9 SVA STRENGTHS AND LIMITATIONS
2.10 RECOMMENDED TIMES FOR CONDUCTING AND REVIEWING THE SVA
2.11 VALIDATION AND PRIORITIZATION OF RISKS
2.12 RISK SCREENING
CHAPTER 3 - SECURITY VULNERABILITY ASSESSMENT METHODOLOGY
3.1 OVERVIEW OF THE SVA METHODOLOGY
3.2 SVA METHODOLOGY
3.3 STEP 1: ASSETS CHARACTERIZATION
3.4 STEP 2: THREAT ASSESSMENT
3.5 SVA STEP 3: VULNERABILITY ANALYSIS
3.6 STEP 4: RISK ANALYSIS/RANKING
3.7 STEP 5: IDENTIFY COUNTERMEASURES:
3.8 FOLLOW-UP TO THE SVA
ATTACHMENT 1 - EXAMPLE SVA METHODOLOGY FORMS
ABBREVIATIONS AND ACRONYMS
APPENDIX A - SVA SUPPORTING DATA REQUIREMENTS
APPENDIX B - SVA COUNTERMEASURES CHECKLIST
APPENDIX C - SVA INTERDEPENDENCIES AND INFRASTRUCTURE CHECKLIST
APPENDIX C1 - REFINERY SVA EXAMPLE
APPENDIX C2 - PIPELINE SVA EXAMPLE
APPENDIX C3 - TRUCK TRANSPORTATION SVA EXAMPLE
APPENDIX C4 - RAIL TRANSPORTATION SVA EXAMPLE
References
Provides guidelines on identifying and analyzing the threats and the vulnerabilities facing a facility by conducting a Security Vulnerability Assessment (SVA).
| DocumentType |
Standard
|
| ProductNote |
This product is unavailable in Cuba, Iran, North Korea, Syria
|
| PublisherName |
American Petroleum Institute
|
| Status |
Withdrawn
|
| NFPA 30 : 2018 | FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE |
| NFPA 400 : 2016 | HAZARDOUS MATERIALS CODE |
| API 2221 : 2011 | CONTRACTOR AND OWNER SAFETY PROGRAM IMPLEMENTATION |
| API 2610:2005 | DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, AND INSPECTION OF TERMINAL AND TANK FACILITIES |
| API 2610 : 2005 : R2010 | DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, AND INSPECTION OF TERMINAL AND TANK FACILITIES |
| API 2220 : 2011 | CONTRACTOR SAFETY PERFORMANCE PROCESS |
| API 2220 CHINESE : 2011 | CONTRACTOR SAFETY PERFORMANCE PROCESS |
| CFR 40(PT63.63.1440-END) : JUL 2004 | PROTECTION OF ENVIRONMENT |