• Shopping Cart
    There are no items in your cart

API D17 : 3ED 89

Withdrawn

Withdrawn

RUNNING AND CEMENTING LINERS IN THE DELAWARE BASIN, TEXAS

Published date

01-12-2013

Withdrawn date

07-23-2013

Sorry this product is not available in your region.

Policy
Foreword
Section 1: Introduction
Section 2: Discussion
Section 3: Outline for planning, running and cementing
            a liner
  Define the known conditions and expected variables
  Liner design
  Design of cement
  Design of spacers
  Preparation of tubular goods
  Calculation of cement volume
  Procedure for running a liner
  Preferred cementing procedures
  Liner accessories and liner movement
  Liner running and cementing procedure form
  Cementing calculations
Appendix A: Well temperatures in the Delaware basin
Appendix B: Nomenclature of accessory equipment for
             running and cementing liners
Appendix C: Liner running and cementing procedure form
Appendix D: Rotating liner installation
Appendix E: Bibliography

Presents a summary of industry practices and procedures used in running and cementing liners in the Delaware Basin, Texas.

DocumentType
Standard
PublisherName
American Petroleum Institute
Status
Withdrawn

API 10B : 1997 TESTING WELL CEMENTS

Sorry this product is not available in your region.