• Shopping Cart
    There are no items in your cart
Celebrate World Standards Day. Save 10% with code WSD2026 until 31 Oct. Save now

API 752 : 2009

Superseded

Superseded

View Superseded by

MANAGEMENT OF HAZARDS ASSOCIATED WITH LOCATION OF PROCESS PLANT PERMANENT BUILDINGS

Available format(s)

PDF

Language(s)

English

Published date

01-01-2009

Superseded date

08-10-2020

Superseded by

API RP 752 :2009(R2020)

US$194.00
Excluding Tax where applicable
Summarise this standard

1 Scope
2 Normative References
3 Terms and Definitions
4 Determination of Buildings Requiring Building Siting
  Evaluation
5 Building Siting Evaluation Processes
6 Building Siting Evaluation for Explosion
7 Building Siting Evaluation for Fire
8 Building Siting Evaluation for Toxic Material Release
Annex A (informative) - Examples
Bibliography

Gives guidance for managing the risk from explosions, fires and toxic material releases to on-site personnel located in new and existing buildings intended for occupancy.

DocumentType
Standard
Pages
40
PublisherName
American Petroleum Institute
Status
Superseded
SupersededBy
Supersedes

⚠

A newer version of this standard is available.

View Current Edition
US$194.00
Excluding Tax where applicable