• Shopping Cart
    There are no items in your cart
Celebrate World Standards Day. Save 10% with code WSD2026 until 31 Oct. Save now

API 2D REDLINE : 2007

Withdrawn

Withdrawn

View Superseded by

OPERATION AND MAINTENANCE OF OFFSHORE CRANES

Published date

01-01-2007

Withdrawn date

07-23-2013

Superseded by

API RP 2D-2:2020

Sorry this product is not available in your region.
Summarise this standard

1 SCOPE
2 DEFINITIONS
3 OPERATION
4 INSPECTION, TESTING, AND MAINTENANCE
5 WIRE ROPE AND SLING INSPECTION, REPLACEMENT
  AND MAINTENANCE
APPENDIX A - TRAINING
APPENDIX B - CRANE OPERATION
APPENDIX C - USAGE, INSPECTION, TESTING, AND
             MAINTENANCE
APPENDIX D - SPRING-SET HOIST BRAKES
APPENDIX E - LOAD TESTING
APPENDIX F - MAINTENANCE
APPENDIX G - WIRE ROPE AND SLING INSPECTION,
             REPLACEMENT AND MAINTENANCE
APPENDIX H - REFERENCES
APPENDIX I - TEMPORARY CRANE INSTALLATION
             GUIDELINES

Serves as a guide to Crane Owners and Crane Operators in developing operating and maintenance practices and procedures for use in the safe operation of pedestal mounted revolving cranes on fixed or floating offshore platforms, jackup drilling rigs, semi-submersible drilling rigs and other types of mobile offshore drilling units (MODUs).

DocumentType
Redline
PublisherName
American Petroleum Institute
Status
Withdrawn
SupersededBy

Sorry this product is not available in your region.