API 1113:2007
Superseded
View Superseded by
DEVELOPING A PIPELINE SUPERVISORY CONTROL CENTER
English
09-01-2007
02-15-2021
1 General
1.1 Scope
1.2 Purpose
1.3 How to Use This Document
2 Applicable References
3 Definition of Terms
4 Developing System Architecture
5 Developing System Reliability
6 Developing Disaster Recovery Capability
7 Developing the Control Room Design
8 Developing the Data-recording System
Describes the design aspects that may be considered appropriate for developing or revamping a control center.
| DocumentType |
Standard
|
| Pages |
22
|
| ProductNote |
Reconfirmed 2007
|
| PublisherName |
American Petroleum Institute
|
| Status |
Superseded
|
| SupersededBy |